Shark Bay – Salt Processing and Shiploading

The Shark Bay Salt Shiploader project demanded precision engineering, innovative modular design, and seamless collaboration within a tight 9-month timeline. Qfactor delivered a cost-effective, operationally superior solution, enhancing efficiency by 25% and achieving a 20% cost saving while meeting bespoke site-specific design and logistical requirements.

Project NameShark Bay Salt Shiploader
Client CompanyMitsu (Shark Bay Salt)
Project TypeCapital Project – Industrial Process
Project Value$5.5m
Project Start AND Finish2009 – 2009
Strategic ObjectiveTo design, fabricate, deliver, and commission a site-specific Salt Shiploader, meeting strict operational efficiency and cost-effectiveness benchmarks within a compressed project timeline.
The Challenge / NeedThe project demanded a highly customized solution tailored to site-specific design criteria, with tight timelines and logistical challenges. It required modularization for efficient transport, pre-commissioning for reduced site installation time, and innovative engineering to optimize operational performance and cost-effectiveness.
Our Approach– Collaborated with specialist engineering firms for design and fabrication.
– Developed a modular design for easy transport and installation.
– Conducted pre-commissioning and functional testing before delivery.
– Implemented rigorous project management frameworks to monitor timelines and quality standards.
– Integrated bespoke material specifications and operational functionalities.
Solution & Key Deliverables– Delivered a modular Salt Shiploader tailored to site-specific requirements.
– Pre-commissioned and functionally tested before on-site deployment.
– Coordinated the design, fabrication, erection, and commissioning stages.
– Achieved 20% cost savings and 25% operational efficiency improvements.
– Delivered within the strict 9-month timeframe.
Risks and Challenges– Complex site-specific design criteria.
– Short project timeline.
– Coordination across multiple engineering and fabrication stakeholders.
– Ensuring seamless transport and on-site assembly of modular components.
– Meeting bespoke material and operational requirements.
Result / Outcome– Delivered a fully operational Salt Shiploader on time and within budget.
– Achieved measurable operational efficiency gains and cost savings.
– Reduced on-site installation time through modular design and pre-commissioning.
– Enhanced operational reliability and output capacity.
Our Value-Added Differentiator– Expertise in modular design and pre-commissioning methodologies.
– Strong project management capabilities ensuring timeline adherence.
– Strategic collaboration with specialist engineering partners.
– Ability to deliver cost and operational efficiencies beyond client expectations.
– Innovative engineering solutions tailored to site-specific challenges.