Following the 8.1 level earthquake in Wellington New Zealand, we conducted some structural inspections to this historical building and provided the Structural Integratity inspection and recommendations from repairs. Our repairs were undertaken to strengthen the building and upgrade the civils/structurals to acheive the 2012 implemented seismic code updates following the Christchurch earthquake.

Project NameBritish High Commissioners Home Wellington Seismic Repairs
Client CompanyBritish Government – Foreign Commonwealth Office – High Commission
Project TypeCapital Project – Major Alts/Adds – Residential
Project Value$698,080
Project Start and Finish2017 – 2017
Strategic ObjectiveTo ensure the structural integrity, safety, and long-term resilience of the British High Commissioner’s home in Wellington through targeted seismic repairs and compliance with local and international building codes.
The Challenge / NeedThe residence required seismic strengthening and repairs following earthquake damage. The project had to ensure compliance with both New Zealand’s strict seismic building standards and the British Foreign Commonwealth Office’s operational and aesthetic requirements while minimizing disruption to the residence.
Our ApproachConducted an extensive seismic assessment of the residence, collaborated with structural and heritage specialists, and developed a phased repair and strengthening plan. Focused on aligning international standards with local regulatory requirements and maintained open communication with stakeholders throughout the project.
Solution & Key Deliverables– Structural assessment and seismic retrofitting
– Repair and reinforcement of critical load-bearing structures
– Integration of heritage preservation practices in structural upgrades
– Compliance with British and New Zealand building codes
– Full operational handover documentation and maintenance guidelines
Risks and Challenges– Balancing modern seismic requirements with the preservation of heritage elements
– Navigating dual compliance standards between British and New Zealand regulatory frameworks
– Ensuring project execution within an occupied residential setting with minimal disruption
Result / OutcomeSuccessfully delivered a structurally reinforced and seismically compliant residence for the British High Commissioner. The project ensured long-term safety and operational resilience while preserving the cultural and historical significance of the property.
Our Value-Added Differentiator– Expertise in managing heritage-listed seismic strengthening projects
– Effective stakeholder engagement ensuring alignment with dual compliance requirements
– Integration of modern structural solutions while preserving heritage aesthetics
– Timely delivery with minimal disruption to residential occupancy

Check out more about the industries I have served : Here

I led the development and execution of the project as Head Contractor Program Director/delivery team.

Design for the design project the team consisted of:

  • 1 x Lead designer
  • 1 x Civil Engineer
  • 1 x Structural Engineer

Construction for the Construction project the team will consist of:

  • 1 x Project Manager
  • 1 x Construction Engineer
  • 1 x Contracts Manager
  • 1 x Quality Manager
  • 1 x Safety Manager
  • 1 x Structural contractors
  • 1 x Civil Stablisation Contractors

Project was completed with 2,000 hrs with ZERO LTI and 0 x FAI