BMA Goonyella Riverside Mine Fuel Farm Installations – Upgrades, Control, and Monitoring

Project NameBMA Goonyella Riverside Mine Fuel Farm Installations – Upgrades, Control, and Monitoring
Client CompanyBMA (BHP Mitsubishi Alliance)
Project TypeCapital Project – Industrial Process
Project Value$3,3m
Project Start and Finish2013 – 2013
Strategic ObjectiveTo design, install, and commission an upgraded fuel storage, control, and monitoring system at Goonyella Riverside Mine, enhancing operational efficiency, safety, and environmental compliance.
The Challenge / Need– Modernize the existing fuel infrastructure to meet increasing operational demands.
– Implement real-time control and monitoring systems for fuel storage and distribution.
– Ensure compliance with environmental regulations to prevent spills and fuel losses.
– Minimize operational disruptions during the project execution phase.
Our Approach– Conducted a comprehensive site audit to assess existing infrastructure and operational needs.
– Developed a phased project implementation plan to minimize downtime.
– Collaborated with BMA operational teams to ensure alignment with safety and performance requirements.
– Installed SCADA-based monitoring systems for real-time fuel inventory and distribution oversight.
– Provided staff training to ensure smooth handover and long-term operational efficiency.
Solution & Key Deliverables– Upgraded fuel farm infrastructure, including fuel tanks and distribution systems.
– Implemented advanced monitoring and control systems with SCADA integration.
– Installed fail-safe mechanisms for spill prevention and environmental compliance.
– Delivered operational manuals and staff training programs.
– Completed detailed handover documentation aligned with safety and environmental standards.
10) Risks and Challenges– Balancing tight timelines and operational continuity without affecting daily mining activities.
– Ensuring zero environmental incidents during installation and commissioning.
– Integrating modern control systems with legacy infrastructure.
– Managing compliance with strict regulatory and safety standards.
Result / Outcome– Delivered a fully upgraded fuel farm system with robust monitoring and control capabilities.
– Achieved zero safety incidents and zero LTIs during the project lifecycle.
– Enhanced operational oversight and efficiency through advanced monitoring systems.
– Delivered the project on time and within budget, meeting all performance indicators.
Our Value-Added DifferentiatorAdvanced Technological Integration: Real-time SCADA monitoring and automated controls.
Operational Continuity: Ensured uninterrupted mining operations during project execution.
Safety and Compliance Focus: Adhered to strict environmental and safety standards.
Scalable Design: Built infrastructure capable of supporting future operational expansions.

Check out more about the industries I have served : Here

I led the development and execution of the project as Head Contractor Program Director/delivery team.

Design for the design project the team consisted of:

  • 1 x Lead Solutions Engineer
  • 4 x Solutions Integrators/Designers,
  • 1 x Process and Control Implementation Engineer

Construction for the Construction project the team will consist of:

  • 1 x Project Manager
  • 1 x Construction Engineer
  • 1 x Contracts Manager
  • 1 x Quality Manager
  • 1 x Safety Manager
  • 1 x MEP Fabrication and Installation Contractor
  • 1 x Mechanical systems Fabrication contractors
  • 1 x Tanks and Tanking contractor
  • 7 x Functional Suppliers
  • 1 x Electrical contractor

Project was completed with 26,000 hrs with ZERO LTI and 1 x FAI