Empowering Banking Excellence

Singapore MBFC Level 6 – Floor Fit-Out

1) Project NameSingapore MBFC Level 6 – Floor Fit-Out
2) Client CompanyBarclays
3) Project TypeCapital Project – Renovation (REIT)
4) Project Value$27,909,000
5) Project Start and Finish2017 – 2017
6) Strategic ObjectiveTo deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs while enhancing productivity, collaboration, and user experience.
7) The Challenge / Need– Relocate multiple administrative functions without operational disruption.
– Create optimized workspace layouts to support evolving organizational needs.
– Ensure alignment with Barclays’ global design and compliance standards.
– Implement robust IT infrastructure and ergonomic design principles.
8) Our Approach– Conducted comprehensive needs analysis to define functional and operational requirements.
– Collaborated with stakeholders to integrate feedback into the final design.
– Applied zoning principles for administrative, operational, and collaborative spaces.
– Integrated advanced IT infrastructure and environmental controls for operational efficiency.
– Implemented flexible workspace layouts to accommodate future growth and adaptability.
9) Solution & Key Deliverables– Delivered optimized workspace layouts balancing individual, collaborative, and administrative areas.
– Integrated state-of-the-art IT infrastructure to support data security and operational resilience.
– Established secure access protocols across all functional zones.
– Delivered sustainable design features, including energy-efficient lighting and HVAC systems.
– Comprehensive operational handover documentation and user training sessions.
10) Risks and Challenges– Managing the relocation of critical administrative functions without disrupting business operations.
– Addressing diverse stakeholder needs while maintaining global compliance standards.
– Balancing tight project timelines and budgets with high-end design and technical requirements.
– Ensuring seamless integration of IT and security systems.
11) Result / Outcome– Successfully delivered a multi-functional floor fit-out aligned with Barclays’ global standards.
– Enhanced operational efficiency through optimized workspace designs.
– Improved staff satisfaction and productivity with ergonomic design and collaborative spaces.
– Delivered the project on time and within budget, exceeding quality and operational expectations.
12) Our Value-Added DifferentiatorStakeholder Alignment: Proactively engaged with stakeholders to ensure alignment with functional and operational goals.
Sustainable Design: Implemented energy-efficient HVAC and lighting systems.
Scalable Infrastructure: Designed adaptable workspaces capable of accommodating future organizational growth.
Operational Continuity: Managed the transition seamlessly without disrupting day-to-day administrative operations.

Check out more about the industries I have served : Here

I led the development and execution of the project as Head Contractor Program Director/delivery team.

Design for the design project the team consisted of:

  • 1 x Lead designer
  • 8 x Engineers,
  • 10 x Drafters
  • 1 x BMS designer/engineer

Construction for the Construction project the team will consist of:

  • 1 x Project Manager
  • 1 x Construction Engineer
  • 1 x Contracts Manager
  • 1 x Quality Manager
  • 1 x Safety Manager
  • 15 x Sub contractors (Various)
  • 23 x Functional Suppliers (Various)
  • 1 x Construction Manager

Project was completed with 126,000 hrs with ZERO LTI and 1 x FAI