Prodeco Stockpile Management System – Columbia

The Prodeco 10mtpa Stockpile Management System project in Colombia aimed to integrate a state-of-the-art Bulk Handling System into a coal preparation plant. Through innovative design, precise execution, and a multidisciplinary team, we optimized logistics, enhanced operational efficiency, and delivered a robust system within tight timelines and safety standards.

Project NameProdeco 10mtpa Stockpile Management System
Client CompanyProdeco (Glencore)
Project TypeCapital Project – Bulk Handling System Integration
Project Value$15.5 million
Project Start AND PROJECT FINISH2009 – 2009
Strategic ObjectiveTo design, construct, and integrate a Bulk Handling System into the coal preparation plant, enabling efficient export operations and optimizing plant performance.
The Challenge / NeedThe project required a fully integrated Bulk Handling System within a coal preparation plant to ensure seamless export operations. Site-specific design, complex logistics, and adherence to international safety standards were critical factors.
Our Approach– Conducted a comprehensive needs assessment and functional analysis.
– Assembled a multidisciplinary team covering design, engineering, construction, and safety.
– Applied modular design principles to simplify transportation and installation.
– Established clear communication with stakeholders and board-level oversight.
Solution & Key Deliverables– Fully integrated Bulk Handling System tailored to site-specific requirements.
– Delivered structural, mechanical, electrical, and instrumentation solutions.
– Installed advanced hazard prevention, fire detection, suppression, and evacuation systems.
– Executed procurement control, contractor evaluations, and contract negotiations.
– Delivered end-to-end project documentation and operational handover.
Risks and Challenges– Managing site-specific complexities and environmental constraints.
– Ensuring zero disruption during construction and commissioning phases.
– Coordinating multiple suppliers and contractors across functional disciplines.
Result / Outcome– Project successfully completed within 101,000 hours with ZERO LTIs and 1 FAI.
– Achieved operational efficiency targets and optimized material handling capacity.
– Seamless integration into the coal preparation plant, improving productivity and export capabilities.
Our Value-Added Differentiator– Expertise in integrating multidisciplinary engineering and construction services.
– Robust project management systems ensuring adherence to timelines and budgets.
– Strong focus on safety, achieving zero LTIs.
– Modular design reducing operational risks and optimizing logistics.