{"id":632,"date":"2015-12-29T08:57:12","date_gmt":"2015-12-29T08:57:12","guid":{"rendered":"http:\/\/www.q3ed.com\/?p=64"},"modified":"2015-12-29T08:57:12","modified_gmt":"2015-12-29T08:57:12","slug":"risk-structuring","status":"publish","type":"post","link":"https:\/\/murrayslatter.me\/?p=632","title":{"rendered":"Risk structuring"},"content":{"rendered":"<p>In project management language, risks include anything unplanned and unforeseen that can have a negative impact on the project\u2019s costs, timing or quality. A good project manager should be able to manage the risks effectively and get the project on track. One of the important tools available for managing risk is the Risk Breakdown Structure (RBS).RBS is an hierarchical representation of risks, starting from higher levels and going down to finer level risks. This is similar to the organization of the Work Breakdown Structure (WBS). For instance, at the top level you could split your risk into technical risk, management risk, scheduling risk and external risks (Level 1), then go on to finer levels such as design risks, funding risk etc (Level 2) and so on. You can keep subdividing the risks into deeper levels as long it makes sense.<br \/>\nHere is an example of a RBS structure taken from Risk Doctor.<br \/>\nAn RBS template is typically chosen for the entire organization and it helps making sure all the relevant points are covered. The RBS works like a checklist. During the risk identification stage, the PM works through each of the items and checks those that are applicable for the given project.<br \/>\nOnce all the risks are identified, the PM can begin scoring the risks. PMI (Project Management Institute) suggests a P-I scoring method where you multiply the Probability (P) of occurrence of a particular risk with the Impact (I) caused by the risk. This way we can objectively handle risk and prioritize them by the order of their scores.<br \/>\nThe scoring will help the PM understand the areas of the project which require more attention. For instance, if the technical risk has a higher risk score, then the PM must make sure he\/she has the right personnel and toolsets to handle the process.<br \/>\nThe RBS would help identify the concentration of risks in a certain category and dependencies among risks. The PM can also monitor &amp; evaluate the risk mitigation process over the course of the project. Even more broadly, the RBS can help in comparing competing tenders from different vendors as we now have a quantitative way to compare different project proposals.<br \/>\nConclusion<br \/>\nIf you want to get started, here is a generic RBS template that you can download.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In project management language, risks include anything unplanned and unforeseen that can have a negative impact on the project\u2019s costs, timing or quality. A good project manager should be able to manage the risks effectively and get the project on [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-632","post","type-post","status-publish","format-standard","hentry","category-risk","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Risk structuring - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?p=632\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Risk structuring - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"In project management language, risks include anything unplanned and unforeseen that can have a negative impact on the project\u2019s costs, timing or quality. A good project manager should be able to manage the risks effectively and get the project on [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?p=632\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:published_time\" content=\"2015-12-29T08:57:12+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/13a75364f9e525515f00e93f59c4fd10\"},\"headline\":\"Risk structuring\",\"datePublished\":\"2015-12-29T08:57:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632\"},\"wordCount\":384,\"commentCount\":0,\"articleSection\":[\"Risk\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=632#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632\",\"name\":\"Risk structuring - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"datePublished\":\"2015-12-29T08:57:12+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/13a75364f9e525515f00e93f59c4fd10\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=632\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=632#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Risk structuring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/13a75364f9e525515f00e93f59c4fd10\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?author=3\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Risk structuring - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?p=632","og_locale":"en_US","og_type":"article","og_title":"Risk structuring - Murray Slatter","og_description":"In project management language, risks include anything unplanned and unforeseen that can have a negative impact on the project\u2019s costs, timing or quality. A good project manager should be able to manage the risks effectively and get the project on [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?p=632","og_site_name":"Murray Slatter","article_published_time":"2015-12-29T08:57:12+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/murrayslatter.me\/?p=632#article","isPartOf":{"@id":"https:\/\/murrayslatter.me\/?p=632"},"author":{"name":"admin","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/13a75364f9e525515f00e93f59c4fd10"},"headline":"Risk structuring","datePublished":"2015-12-29T08:57:12+00:00","mainEntityOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=632"},"wordCount":384,"commentCount":0,"articleSection":["Risk"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/murrayslatter.me\/?p=632#respond"]}]},{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?p=632","url":"https:\/\/murrayslatter.me\/?p=632","name":"Risk structuring - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"datePublished":"2015-12-29T08:57:12+00:00","author":{"@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/13a75364f9e525515f00e93f59c4fd10"},"breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?p=632#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?p=632"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?p=632#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Risk structuring"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Person","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/13a75364f9e525515f00e93f59c4fd10","name":"admin","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/murrayslatter.me\/?author=3"}]}},"jetpack_featured_media_url":"","jetpack-related-posts":[{"id":2183,"url":"https:\/\/murrayslatter.me\/?p=2183","url_meta":{"origin":632,"position":0},"title":"CoE Risk #1: Fundamentals of Risk Management","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"What Great Looks Like: A Guide for Project and Program Managers Risk management is a crucial function of any successful project or program. Effective risk management enables project and program managers to identify potential risks, assess their likelihood and impact, develop strategies to mitigate or respond to those risks, and\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2665,"url":"https:\/\/murrayslatter.me\/?p=2665","url_meta":{"origin":632,"position":1},"title":"#7 of 12: So you want to be a Project Manager","author":"Murray Slatter","date":"January 27, 2024","format":false,"excerpt":"Managing Project Risks Identifying, analyzing, and mitigating potential risks that could impact project outcomes. As a project manager, one of your primary responsibilities is to ensure that the project you are managing is completed on time, within budget, and meets the desired quality standards. However, achieving these objectives is not\u2026","rel":"","context":"In &quot;Project management&quot;","block_context":{"text":"Project management","link":"https:\/\/murrayslatter.me\/?cat=18"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/Slide7.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/Slide7.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/Slide7.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/Slide7.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/Slide7.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2385,"url":"https:\/\/murrayslatter.me\/?p=2385","url_meta":{"origin":632,"position":2},"title":"CoE Risk #10: Managing Risks in Complex Programs","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"Lessons Learned from Large-Scale Projects Complex programs bring a multifaceted array of risks, and managing these effectively is what separates exceptional project managers from the rest. In this blog, we explore the distilled wisdom gleaned from large-scale projects and the thought leaders whose insights can transform the practice of risk\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3142,"url":"https:\/\/murrayslatter.me\/?p=3142","url_meta":{"origin":632,"position":3},"title":"Risk Management: Strategies Employed by Contract Administrators to Safeguard Construction Projects","author":"Murray Slatter","date":"July 25, 2024","format":false,"excerpt":"Risk management in construction is an essential practice that involves the identification, assessment, and mitigation of risks throughout the project lifecycle. Given the complexity and dynamic nature of construction projects, risks can arise from a multitude of sources, including financial uncertainties, legal issues, safety hazards, and environmental factors. Contract Administrators\u2026","rel":"","context":"In &quot;Contract Administrator&quot;","block_context":{"text":"Contract Administrator","link":"https:\/\/murrayslatter.me\/?cat=67"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/07\/contracts-administrator-module.png?fit=461%2C260&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2196,"url":"https:\/\/murrayslatter.me\/?p=2196","url_meta":{"origin":632,"position":4},"title":"CoE Risk #2: Risk Identification and Assessment Techniques","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"What Great Looks Like: Best Practices and Tools for Successful Risk Management Risk management is a critical aspect of program management. In order to ensure the success of a program, project managers must be able to identify and assess potential risks, and implement effective risk management strategies to mitigate those\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2382,"url":"https:\/\/murrayslatter.me\/?p=2382","url_meta":{"origin":632,"position":5},"title":"CoE Risk #7: Risk and Program Governance","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"Best Practices and Examples from Leading Organizations The world of project and program management is fraught with uncertainties that can jeopardize even the most well-planned projects. Understanding the fundamentals of Risk and Program Governance is not merely about being cautious but about being smart and strategic in anticipating, analyzing, and\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide8.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide8.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide8.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide8.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide8.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=632"}],"version-history":[{"count":0,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/632\/revisions"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}