{"id":5981,"date":"2025-10-05T20:31:03","date_gmt":"2025-10-05T09:31:03","guid":{"rendered":"https:\/\/murrayslatter.me\/?p=5981"},"modified":"2025-10-05T20:32:25","modified_gmt":"2025-10-05T09:32:25","slug":"the-missing-decades-why-construction-lags-in-productivity","status":"publish","type":"post","link":"https:\/\/murrayslatter.me\/?p=5981","title":{"rendered":"The Missing Decades: Why Construction Lags in Productivity"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Executive Summary<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Why:<\/strong> For over three decades, Australia\u2019s construction industry has been trapped in stagnation. Productivity has flatlined, insolvencies are rising, and the sector consistently fails to deliver on its most fundamental obligation \u2014 building enough homes for Australians. This is not just market failure; it is the direct result of decades of poor policy, poor governance, and short-termism at the highest levels.<\/li>\n\n\n\n<li><strong>How:<\/strong> Transformation requires integrating leadership across the <strong>credit cycle, business cycle, and investment cycle<\/strong> with structured data, AI, and machine learning. Only by linking strategic foresight with operational execution can we break free from the status quo dysfunction.<\/li>\n\n\n\n<li><strong>What:<\/strong> The future belongs to leaders who treat data as the new foundation, leverage machine intelligence to anticipate risk, and redesign the industry\u2019s fragmented structures into scalable, resilient, whole-of-life systems. The construction industry cannot \u201creform at the margins\u201d \u2014 it must be rebuilt at its core.<\/li>\n\n\n\n<li><strong>Next Steps for Executives:<\/strong>\n<ol class=\"wp-block-list\">\n<li><strong>Acknowledge<\/strong> the dysfunction: denial of systemic failure is no longer an option.<\/li>\n\n\n\n<li><strong>Audit<\/strong> your organisational exposure: supply-side constraints, insolvency risk, and regulatory friction.<\/li>\n\n\n\n<li><strong>Invest<\/strong> in structured data and AI-enabled decision-making as the multiplier for productivity.<\/li>\n\n\n\n<li><strong>Engage<\/strong> with leaders who have lived the cycles and built the frameworks \u2014 and start the transformation conversation today.<\/li>\n<\/ol>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Backdrop <\/h2>\n\n\n\n<p>To fully benefit from this article and the rest of this series, it is also important to consider &#8216;how we got here&#8217; before we consider &#8216;a brighter future&#8217;. Whose familiar will remember the that the industry today, stands on the sholders, of the 1981-1983 recession, floating of the Australian Dollar in 1983, the Industrial Relations reforms of the Price and Income Accords I-VII, and transition to Enterprise agreements and collective bargining, coupled with decentralisation and deregulation of the undustry.<\/p>\n\n\n\n<p>Further, the 1991 recession that we had to have, the Sydney Olympic Games aspirational bid (and then win) and the subsequent construction industry reformation. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Australian Story: A Generation of Missteps<\/h2>\n\n\n\n<p>When I entered the industry in the 1990s, Australia was already falling behind. But what\u2019s unfolded since then has been nothing short of catastrophic: a combination of poor government policy, shortsighted industry leadership, and fragmented execution has created an industry that is, by almost any measure, <strong>uninvestable and unexecutable.<\/strong>  <\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Supply-Side Constraints (Capacity in Crisis)<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Labour Shortages:<\/strong> Across nearly every trade \u2014 electricians, plumbers, carpenters, engineers \u2014 we face shortages that drive up wages, delay projects, and compromise productivity.<\/li>\n\n\n\n<li><strong>Rising Construction Costs:<\/strong> Inflation, global supply chain disruptions, and energy shocks have driven steel, concrete, and brick prices to historic highs. Fixed-price contracts turned toxic overnight, sinking firms and projects alike.<\/li>\n\n\n\n<li><strong>Chronic Low Productivity:<\/strong> Unlike manufacturing or logistics, which doubled productivity in a generation, construction in Australia has been in decline. Too many small, fragmented firms, too little tech adoption, too many insolvencies, razor-thin margins, and no real investment in transformation.<\/li>\n\n\n\n<li><strong>Financial Instability:<\/strong> The surge in insolvencies is not a blip \u2014 it\u2019s a symptom. Companies locked into contracts that no longer cover costs collapse, leaving a trail of unfinished projects and eroded consumer confidence.<\/li>\n\n\n\n<li><strong>Planning and Regulatory Delays:<\/strong> Local and state approvals frameworks add years of delay and millions in costs. In a housing crisis, every month lost in red tape is another family without a home.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2. Failure to Meet Housing Targets<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>The 1.2 Million Home Target:<\/strong> Government projections are already slipping. At the current rate, Australia could fall <strong>hundreds of thousands of homes short<\/strong> by 2029.<\/li>\n\n\n\n<li><strong>Collapse in Approvals:<\/strong> Apartment approvals \u2014 essential for urban density \u2014 have collapsed. High construction costs and low margins have drained investor appetite, precisely when we need scale the most.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">The Root Cause: Policy, Governance, and Leadership Failures<\/h2>\n\n\n\n<p>The dysfunction is not an accident. It is the compound effect of <strong>three decades of systemic failure<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Regulation Mismanaged:<\/strong> Deregulation and poor enforcement created uneven standards and weak accountability.<\/li>\n\n\n\n<li><strong>Industrial Relations Bias:<\/strong> Decisions favoured short-term players and unions over society-wide outcomes, entrenching inefficiency.<\/li>\n\n\n\n<li><strong>Governance Failures:<\/strong> Authorities approvals and controls are slow, opaque, and inconsistent \u2014 introducing execution risk into every project.<\/li>\n\n\n\n<li><strong>Policy Drift to Short-Termism:<\/strong> Successive governments pursued political wins rather than whole-of-society outcomes, prioritising headlines over housing delivery.<\/li>\n<\/ul>\n\n\n\n<p>The result is an industry crippled by <strong>authorities risk, capital risk, implementation risk, and inadequate returns on investment.<\/strong> Australia needs millions of homes to meet a basic societal need \u2014 and yet we have an industry incapable of delivering them.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Transformation Happens (The Recipe)<\/h2>\n\n\n\n<p>The future of construction will not be unlocked by tinkering. It requires <strong>systemic re-architecture<\/strong>, built on three pillars:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Structured Data as a Strategic Asset<\/strong>\n<ul class=\"wp-block-list\">\n<li>Move from fragmented spreadsheets to integrated, lifecycle-oriented data structures. Data must be treated as the \u201cnew concrete\u201d \u2014 the foundation of resilience and foresight.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>AI and Machine Learning for Predictive Foresight<\/strong>\n<ul class=\"wp-block-list\">\n<li>Use ML to forecast cost overruns, labour bottlenecks, and safety incidents months before they materialise. This is standard in finance and healthcare; construction can no longer ignore it.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Leadership Across Cycles<\/strong>\n<ul class=\"wp-block-list\">\n<li>Only leaders who understand the <strong>credit cycle, business cycle, and investment cycle<\/strong> can guide organisations to sustainable success. Operational leverage comes not from squeezing subcontractors but from orchestrating capital, technology, and human resources intelligently.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">What Executives Must Do Now<\/h2>\n\n\n\n<p>If you\u2019re responsible for capital projects, property development, or infrastructure delivery, the message is simple: <strong>the status quo is finished.<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Audit your exposure<\/strong> \u2014 where are supply chain shocks, labour shortages, and insolvency risks undermining your projects?<\/li>\n\n\n\n<li><strong>Challenge your governance<\/strong> \u2014 where do regulatory processes add unnecessary drag and capital risk?<\/li>\n\n\n\n<li><strong>Invest in intelligence<\/strong> \u2014 build the data foundation and AI-enabled foresight that will multiply your margins and resilience.<\/li>\n\n\n\n<li><strong>Lead differently<\/strong> \u2014 no longer as a project manager, but as a systems integrator who aligns boardroom strategy with site execution.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Closing Thought<\/h2>\n\n\n\n<p>The missing decades are behind us \u2014 but they cannot be repeated. For too long, construction leaders accepted dysfunction as \u201cnormal.\u201d That era is over.<\/p>\n\n\n\n<p>We stand at an inflection point: either continue down the path of stagnation, insolvencies, and housing shortfalls, or choose transformation built on structured data, predictive foresight, and whole-of-cycle leadership.<\/p>\n\n\n\n<p>I know this industry intimately \u2014 from site sheds to boardrooms, from credit cycles to capital markets. I have seen the dysfunction up close, and I have built the frameworks that can break it.<\/p>\n\n\n\n<p>\ud83d\udc49 Let\u2019s start the conversation. If you\u2019re ready to move beyond survival and lead the next decade of transformation, I\u2019d welcome a one-on-one discussion to explore your organisation\u2019s specific needs and opportunities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-c8e06f2a-d025-4901-a029-b3214535fe25\">Connect<\/h2>\n\n\n\n<p id=\"block-ffe48e46-bbfa-4d1e-9d89-e94b29b3dbe3\">Connect and discuss how these principles can transform your business.<\/p>\n\n\n\n<div class=\"wp-block-leadin-hubspot-form-block\">\n\t\t\t\t\t\t<script>\n\t\t\t\t\t\t\twindow.hsFormsOnReady = window.hsFormsOnReady || [];\n\t\t\t\t\t\t\twindow.hsFormsOnReady.push(()=>{\n\t\t\t\t\t\t\t\thbspt.forms.create({\n\t\t\t\t\t\t\t\t\tportalId: 24391455,\n\t\t\t\t\t\t\t\t\tformId: \"03fd50b1-a049-4bdb-b064-cff39a5f75dd\",\n\t\t\t\t\t\t\t\t\ttarget: \"#hbspt-form-1777522437000-9361795930\",\n\t\t\t\t\t\t\t\t\tregion: \"na1\",\n\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t})});\n\t\t\t\t\t\t<\/script>\n\t\t\t\t\t\t<div class=\"hbspt-form\" id=\"hbspt-form-1777522437000-9361795930\"><\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-71a3c6d5-35f0-4e00-ade1-88706f35b682\">Do you want to 2x, 5x or 10x your Profits?<\/h2>\n\n\n\n<p id=\"block-20be4dda-b1e9-4645-aa86-83674fa9fad8\"><a href=\"https:\/\/outlook-sdf.office.com\/bookwithme\/user\/ffef0aaaf9ce4fa9bc29e062d1cb0d0f@qfactor.com.au\/meetingtype\/Pm-jEq3270-FEyHgAHjEmw2?anonymous&amp;ep=mcard\">Download the Playbook and connect to tailor <\/a>or Join our Master Class Club: <a href=\"https:\/\/share.hsforms.com\/1BOVrPBN0SZSyE6N4ppjRqAeiskf\"><strong>Join for free<\/strong><\/a><\/p>\n\n\n\n<p id=\"block-2bc74fc7-1bdb-47cf-96ff-758e29419050\"><strong>Want More:<\/strong><\/p>\n\n\n\n<ul id=\"block-08344bc8-9b6d-4019-b200-5641f4fd11a4\" class=\"wp-block-list\">\n<li>Connect for <a href=\"http:\/\/www.qfactor.com.au\/\">more<\/a>.<\/li>\n\n\n\n<li>Connect on <a href=\"https:\/\/www.linkedin.com\/in\/murrayslatter\/\">LinkedIn<\/a><\/li>\n\n\n\n<li>Checkout more <a href=\"https:\/\/murrayslatter.me\/?p=4039\">on this Pricing Series<\/a><\/li>\n\n\n\n<li>Checkout more <a href=\"https:\/\/murrayslatter.me\/?cat=22\">Book Review in this series<\/a><\/li>\n\n\n\n<li>Connect for more free <a href=\"https:\/\/share.hsforms.com\/1BOVrPBN0SZSyE6N4ppjRqAeiskf\">material and coaching<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Executive Summary Backdrop To fully benefit from this article and the rest of this series, it is also important to consider &#8216;how we got here&#8217; before we consider &#8216;a brighter future&#8217;. Whose familiar will remember the that the industry today, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5982,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[123,30],"tags":[81],"class_list":["post-5981","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-industry-transformation","category-series","tag-transformingindustry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Missing Decades: Why Construction Lags in Productivity - Murray Slatter<\/title>\n<meta name=\"description\" content=\"Three decades, Australia\u2019s construction industry has been trapped in stagnation. decades of poor policy &amp; governance = lags in productivity\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?p=5981\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Missing Decades: Why Construction Lags in Productivity - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Three decades, Australia\u2019s construction industry has been trapped in stagnation. decades of poor policy &amp; governance = lags in productivity\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?p=5981\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-05T09:31:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-05T09:32:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1209\" \/>\n\t<meta property=\"og:image:height\" content=\"808\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Murray Slatter\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Murray Slatter\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981\"},\"author\":{\"name\":\"Murray Slatter\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/9774d7f727e6b917f43267614574f6d5\"},\"headline\":\"The Missing Decades: Why Construction Lags in Productivity\",\"datePublished\":\"2025-10-05T09:31:03+00:00\",\"dateModified\":\"2025-10-05T09:32:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981\"},\"wordCount\":1135,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Stagnation.png?fit=1209%2C808&ssl=1\",\"keywords\":[\"#TransformingIndustry\"],\"articleSection\":[\"Construction Industry Transformation\",\"Series\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981\",\"name\":\"The Missing Decades: Why Construction Lags in Productivity - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Stagnation.png?fit=1209%2C808&ssl=1\",\"datePublished\":\"2025-10-05T09:31:03+00:00\",\"dateModified\":\"2025-10-05T09:32:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/9774d7f727e6b917f43267614574f6d5\"},\"description\":\"Three decades, Australia\u2019s construction industry has been trapped in stagnation. decades of poor policy & governance = lags in productivity\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=5981\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Stagnation.png?fit=1209%2C808&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Stagnation.png?fit=1209%2C808&ssl=1\",\"width\":1209,\"height\":808},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=5981#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Missing Decades: Why Construction Lags in Productivity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/9774d7f727e6b917f43267614574f6d5\",\"name\":\"Murray Slatter\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"caption\":\"Murray Slatter\"},\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?author=2\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Missing Decades: Why Construction Lags in Productivity - Murray Slatter","description":"Three decades, Australia\u2019s construction industry has been trapped in stagnation. decades of poor policy & governance = lags in productivity","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?p=5981","og_locale":"en_US","og_type":"article","og_title":"The Missing Decades: Why Construction Lags in Productivity - Murray Slatter","og_description":"Three decades, Australia\u2019s construction industry has been trapped in stagnation. decades of poor policy & governance = lags in productivity","og_url":"https:\/\/murrayslatter.me\/?p=5981","og_site_name":"Murray Slatter","article_published_time":"2025-10-05T09:31:03+00:00","article_modified_time":"2025-10-05T09:32:25+00:00","og_image":[{"width":1209,"height":808,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png","type":"image\/png"}],"author":"Murray Slatter","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Murray Slatter","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/murrayslatter.me\/?p=5981#article","isPartOf":{"@id":"https:\/\/murrayslatter.me\/?p=5981"},"author":{"name":"Murray Slatter","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/9774d7f727e6b917f43267614574f6d5"},"headline":"The Missing Decades: Why Construction Lags in Productivity","datePublished":"2025-10-05T09:31:03+00:00","dateModified":"2025-10-05T09:32:25+00:00","mainEntityOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=5981"},"wordCount":1135,"commentCount":0,"image":{"@id":"https:\/\/murrayslatter.me\/?p=5981#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1209%2C808&ssl=1","keywords":["#TransformingIndustry"],"articleSection":["Construction Industry Transformation","Series"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/murrayslatter.me\/?p=5981#respond"]}]},{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?p=5981","url":"https:\/\/murrayslatter.me\/?p=5981","name":"The Missing Decades: Why Construction Lags in Productivity - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=5981#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?p=5981#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1209%2C808&ssl=1","datePublished":"2025-10-05T09:31:03+00:00","dateModified":"2025-10-05T09:32:25+00:00","author":{"@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/9774d7f727e6b917f43267614574f6d5"},"description":"Three decades, Australia\u2019s construction industry has been trapped in stagnation. decades of poor policy & governance = lags in productivity","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?p=5981#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?p=5981"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?p=5981#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1209%2C808&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1209%2C808&ssl=1","width":1209,"height":808},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?p=5981#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"The Missing Decades: Why Construction Lags in Productivity"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Person","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/9774d7f727e6b917f43267614574f6d5","name":"Murray Slatter","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","caption":"Murray Slatter"},"url":"https:\/\/murrayslatter.me\/?author=2"}]}},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1209%2C808&ssl=1","jetpack-related-posts":[{"id":5983,"url":"https:\/\/murrayslatter.me\/?p=5983","url_meta":{"origin":5981,"position":0},"title":"Transforming the Construction Industry: The Leadership, Data, and AI Revolution","author":"Murray Slatter","date":"October 5, 2025","format":false,"excerpt":"Executive Summary Why: Australia\u2019s construction industry has reached a breaking point. Productivity has flatlined for decades, insolvencies are rising, housing targets are failing, and projects are plagued by cost blowouts and poor delivery. The status quo models are no longer fit for purpose \u2014 they are structurally broken. How: The\u2026","rel":"","context":"In &quot;Construction Industry Transformation&quot;","block_context":{"text":"Construction Industry Transformation","link":"https:\/\/murrayslatter.me\/?cat=123"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1200%2C802&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1200%2C802&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1200%2C802&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1200%2C802&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/10\/Stagnation.png?fit=1200%2C802&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2164,"url":"https:\/\/murrayslatter.me\/?p=2164","url_meta":{"origin":5981,"position":1},"title":"CoE #11: COST &#8211; Leveraging Technology for Efficient Program Cost Management","author":"Murray Slatter","date":"December 17, 2023","format":"aside","excerpt":"Leveraging Technology for Efficient Program Cost Management In today's fast-paced business environment, program managers are under constant pressure to manage costs efficiently while maintaining program quality. One way to achieve this is by leveraging technology to streamline program cost management processes. Series Over the next few weeks, I shall share\u2026","rel":"","context":"In &quot;CoE - Program Management&quot;","block_context":{"text":"CoE - Program Management","link":"https:\/\/murrayslatter.me\/?cat=32"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide12.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide12.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide12.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide12.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide12.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3564,"url":"https:\/\/murrayslatter.me\/?p=3564","url_meta":{"origin":5981,"position":2},"title":"Transforming the Building and Construction Industry in Australia and New Zealand","author":"Murray Slatter","date":"July 6, 2024","format":false,"excerpt":"The construction industry in Australia and New Zealand stands at a pivotal juncture. As we face challenges ranging from quality assurance and sustainability to skill shortages and process inefficiencies, it is imperative to explore innovative solutions that can transform the industry. This series aims to delve deep into the core\u2026","rel":"","context":"In \"#Series\"","block_context":{"text":"#Series","link":"https:\/\/murrayslatter.me\/?tag=series"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/06\/Construction-digitisation.jpg?fit=1200%2C600&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/06\/Construction-digitisation.jpg?fit=1200%2C600&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/06\/Construction-digitisation.jpg?fit=1200%2C600&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/06\/Construction-digitisation.jpg?fit=1200%2C600&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/06\/Construction-digitisation.jpg?fit=1200%2C600&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4346,"url":"https:\/\/murrayslatter.me\/?p=4346","url_meta":{"origin":5981,"position":3},"title":"Paul Teicholz","author":"Murray Slatter","date":"December 6, 2024","format":false,"excerpt":"Paul Teicholz is a distinguished figure in the fields of life cycle costing (LCC) and Building Information Modeling (BIM). His research has significantly advanced the integration of these technologies in the construction industry, particularly focusing on improving project management and sustainability. This essay explores five key findings from Teicholz's extensive\u2026","rel":"","context":"In &quot;Facilities Management and Asset Management&quot;","block_context":{"text":"Facilities Management and Asset Management","link":"https:\/\/murrayslatter.me\/?cat=103"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6093,"url":"https:\/\/murrayslatter.me\/?p=6093","url_meta":{"origin":5981,"position":4},"title":"Managing Transitions","author":"Murray Slatter","date":"April 27, 2026","format":false,"excerpt":"How to lead people\u2014not just projects\u2014through transformation Managing Transitions by William Bridges: A Practical Guide for Leaders Driving Change is a fantasitic book of the collective insights of William and Susan Bridges as they have led and managed transitions across their careers. Introduction: Why \u201cManaging Transitions\u201d Matters More Than Ever\u2026","rel":"","context":"In &quot;Business Leadership&quot;","block_context":{"text":"Business Leadership","link":"https:\/\/murrayslatter.me\/?cat=16"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/04\/Bridges-Transition-Model.png?fit=953%2C746&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/04\/Bridges-Transition-Model.png?fit=953%2C746&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/04\/Bridges-Transition-Model.png?fit=953%2C746&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/04\/Bridges-Transition-Model.png?fit=953%2C746&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4022,"url":"https:\/\/murrayslatter.me\/?p=4022","url_meta":{"origin":5981,"position":5},"title":"How the Economic Machine Works","author":"Murray Slatter","date":"September 27, 2024","format":false,"excerpt":"Understanding the Drivers Behind Market Cycles In a world where market cycles are influenced by a variety of factors, understanding the underlying mechanics of the economy is crucial for making informed investment decisions. Economic conditions, interest rates, investor sentiment, and global events all play a role in driving bull and\u2026","rel":"","context":"In &quot;Investing&quot;","block_context":{"text":"Investing","link":"https:\/\/murrayslatter.me\/?cat=11"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/08\/Social-Impact-Fund.jpg?fit=720%2C405&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/08\/Social-Impact-Fund.jpg?fit=720%2C405&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/08\/Social-Impact-Fund.jpg?fit=720%2C405&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/08\/Social-Impact-Fund.jpg?fit=720%2C405&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/5981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5981"}],"version-history":[{"count":2,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/5981\/revisions"}],"predecessor-version":[{"id":5990,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/5981\/revisions\/5990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/5982"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}