{"id":563,"date":"2018-06-28T12:47:35","date_gmt":"2018-06-28T02:47:35","guid":{"rendered":"http:\/\/www.q3ed.com\/?p=563"},"modified":"2018-06-28T12:47:35","modified_gmt":"2018-06-28T02:47:35","slug":"563","status":"publish","type":"post","link":"https:\/\/murrayslatter.me\/?p=563","title":{"rendered":"Best Practice Data Centre Engineering, Procurement, Construction, Management"},"content":{"rendered":"<p><em>In todays note, we are\u00a0focused on data center design. We\u2019ll look into design best practices, examine in depth some of the most interesting recent design trends, and talk with leading data center design experts.<\/em><br \/>\n<em>Below is the first part in a series on data center best practices by Steven Shapiro, an engineer with almost 25 years of experience in the mission critical industry.<\/em><br \/>\n<strong>T<\/strong>he data center is a dedicated space were your firm houses its most important information and relies on it being safe and accessible. Best practices ensure that you are doing everything possible to keep it that way.<br \/>\nBest practices mean different things to different people and organizations. This series of articles will focus on the major best practices applicable across all types of data centers, including enterprise, colocation, and internet facilities. We will review codes, design standards, and operational standards. We will discuss best practices with respect to facility conceptual design, space planning, building construction, and physical security, as well as mechanical, electrical, plumbing, and fire protection. Facility operations, maintenance, and procedures will be the final topics for the series.<br \/>\nFollowing appropriate codes and standards would seem to be an obvious direction when designing new or upgrading an existing data center. Data center design and infrastructure standards can range from national codes (required), like those of the NFPA, local codes (required), like the New York State Energy Conservation Construction Code, and performance standards like the Uptime Institute\u2019s Tier Standard (optional). Green certifications, such as LEED, Green Globes, and Energy Star are also considered optional.<br \/>\nCodes must be followed when designing, building, and operating your data center, but \u201ccode\u201d is the minimum performance requirement to ensure life safety and energy efficiency in most cases. A data center is going to probably be the most expensive facility your company ever builds or operates. Should it have the minimum required by code? It is clear from past history that code minimum is not the best practice. Code minimum fire suppression would involve having wet pipe sprinklers in your data center. That is definitely not best practice.<\/p>\n<h3>The Big Three<\/h3>\n<p>The three major data center design and infrastructure standards developed for the industry include:<br \/>\n<strong>Uptime Institute&#8217;s Tier Standard<\/strong><br \/>\n<a href=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/Uptime-Institute-logo.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"old-inline-image\" src=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/Uptime-Institute-logo.jpg?resize=355%2C51\" alt=\"Uptime Institute logo\" width=\"355\" height=\"51\" \/><\/a><br \/>\nThis standard develops a performance-based methodology for the data center during the design, construction, and commissioning phases to determine the resiliency of the facility with respect to four Tiers or levels of redundancy\/reliability. The Tiers are compared in the table below and can be found in greater definition in UI\u2019s white paper TUI3026E. The origins of the Uptime Institute as a data center users group established it as the first group to measure and compare a data center\u2019s reliability. It is a for-profit entity that will certify a facility to its standard, for which the standard is often criticized.<br \/>\n<a href=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/Uptime-tier-chart-e1452048268125.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"old-inline-image\" src=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/Uptime-tier-chart-e1452048268125.jpg?resize=470%2C125\" alt=\"Uptime tier chart\" width=\"470\" height=\"125\" \/><\/a><br \/>\n<strong>ANSI\/BICSI <a href=\"tel:002-2014\">002-2014<\/a><\/strong><br \/>\n<a href=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/Ansi-bicsi-image.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"old-inline-image\" src=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/Ansi-bicsi-image.jpg?resize=183%2C238\" alt=\"Ansi bicsi image\" width=\"183\" height=\"238\" \/><\/a><br \/>\nData Center Design and Implementation Best Practices: This standard covers the major aspects of planning, design, construction, and commissioning of the MEP building trades, as well as fire protection, IT, and maintenance. It is arranged as a guide for data center design, construction, and operation. Ratings\/Reliability is defined by Class 0 to 4 and certified by BICSI-trained and certified professionals.<br \/>\n<strong>ANSI\/TIA 942-A 2014 <\/strong><br \/>\n<a href=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/TIA-logo.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"old-inline-image\" src=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/TIA-logo.jpg?resize=241%2C64\" alt=\"TIA logo\" width=\"241\" height=\"64\" \/><\/a><br \/>\nTelecommunication Infrastructure Standard for Data Centers: This standard is more IT cable and network oriented and has various infrastructure redundancy and reliability concepts based on the Uptime Institute\u2019s Tier Standard. In 2013, UI requested that TIA stop using the Tier system to describe reliability levels, and TIA switched to using the word \u201cRated\u201d in lieu of \u201cTiers,\u201d defined as Rated 1-4. TIA uses tables within the standard to easily identify the ratings for telecommunications, architectural, electrical, and mechanical systems. Here\u2019s a sample from the 2005 standard (click the image to enlarge):<br \/>\n<a href=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/TIA-sample-chart.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"old-inline-image\" src=\"https:\/\/i0.wp.com\/www.datacenterknowledge.com\/sites\/datacenterknowledge.com\/files\/wp-content\/uploads\/2016\/01\/TIA-sample-chart.jpg?resize=470%2C261\" alt=\"TIA sample chart\" width=\"470\" height=\"261\" \/><\/a><br \/>\nTIA has a certification system in place with dedicated vendors that can be retained to provide facility certification.<\/p>\n<h3>EN 50600: an International Standard<\/h3>\n<p>An international series of data center standards in continuous development is the EN 50600 series. Many aspects of this standard reflect the UI, TIA, and BCSI standards. Facility ratings are based on Availability Classes, from 1 to 4. The standard breaks down as follows:<\/p>\n<ul>\n<li>EN 50600-1 General concepts<\/li>\n<li>EN 50600-2-1 Building construction<\/li>\n<li>EN 50600-2-2 Power distribution<\/li>\n<li>EN 50600-2-3 Environmental control<\/li>\n<li>EN 50600-2-4 Telecommunications cabling infrastructure<\/li>\n<li>EN 50600-2-5 Security systems<\/li>\n<li>EN 50600-2-6 Management and operational information systems<\/li>\n<\/ul>\n<h3>Regulatory Standards<\/h3>\n<p>Government regulations for data centers will depend on the nature of the business and can include HIPPA (Health Insurance Portability and Accountability Act), SOX (Sarbanes Oxley) 2002, SAS 70 Type I or II, GLBA (Gramm-Leach Bliley Act), as well as new regulations that may be implemented depending on the nature of your business and the present security situation.<\/p>\n<h3>Operational Standards<\/h3>\n<p>There are also many operational standards to choose from. These are standards that guide your day-to-day processes and procedures once the data center is built:<\/p>\n<ul>\n<li>Uptime Institute: Operational Sustainability (with and without Tier certification)<\/li>\n<li>ISO 9000 &#8211; Quality System<\/li>\n<li>ISO 14000 &#8211; Environmental Management System<\/li>\n<li>ISO 27001 &#8211; Information Security<\/li>\n<li>PCI \u2013 Payment Card Industry Security Standard<\/li>\n<li>SOC, SAS70 &amp; ISAE 3402 or SSAE16, FFIEC (USA) &#8211; Assurance Controls<\/li>\n<li>AMS-IX \u2013 Amsterdam Internet Exchange &#8211; Data Centre Business Continuity Standard<\/li>\n<li>EN50600-2-6 Management and Operational Information<\/li>\n<\/ul>\n<p>These standards will also vary based on the nature of the business and include guidelines associated with detailed operations and maintenance procedures for all of the equipment in the data center.<\/p>\n<h3>Consistency and Documentation are Key<\/h3>\n<p>The nature of your business will determine which standards are appropriate for your facility. If you have multiple facilities across the US, then the US standards may apply. For those with international facilities or a mix of both, an international standard may be more appropriate. The key is to choose a standard and follow it. If deviations are necessary because of site limitations, financial limitations, or availability limitations, they should be documented and accepted by all stakeholders of the facility.<\/p>\n<div class=\"article-banner dfp-ad-hideempty\">\n<div data-dfp-position=\"inarticle4\">\n<div id=\"3dva2ck9jho000003dva2ck9jho000003dva2ck9\" class=\"dfp-tags\" data-size=\"300*250,300*600\" data-adunit=\"\/3834\/dcknowledge.home\/article\/design\" data-name=\"article_300_4_rht_infinite\" data-targeting=\"pos=300_4_rht|article_number=1|ptype=Article|nid=143851|pterm=design|sterm=how_to|author=steven_shapiro|reg=registered\" data-mapping=\"0*0=300*250|779*0=300*250,300*600\" data-adsensecolor=\"background=|border=|link=|text=|url=\" data-google-query-id=\"CLTCs6Wp9dsCFVJevQodugkFog\">\n<div id=\"google_ads_iframe_\/3834\/dcknowledge.home\/article\/design_10__container__\">Regardless of the standard followed, documentation and record keeping of your operation and maintenance activities is one of the most important parts of the process. Software management tools such as DCIM (Data Center Infrastructure Management), CMMS (Computerized Maintenance Management System), EPMS (Electrical Power Monitoring System), and DMS (Document Management System) for operations and maintenance can provide a \u201csingle pane of glass\u201d to view all required procedures, infrastructure assets, maintenance activities, and operational issues.<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>Your facility must meet the business mission. Data center design, construction, and operational standards should be chosen based on definition of that mission. Not all facilities supporting your specific industry will meet your defined mission, so your facility may not look or operate like another, even in the same industry.<br \/>\n<em><strong>About the author:<\/strong> Murray Slatter has been and Engineer and Project Professional in the critical environments industry since 1994 and has a diverse background in the study, reporting, design, commissioning, development and management of reliable electrical distribution, emergency power, lighting, and fire protection systems for high tech environments. His experience also includes providing analysis of critical application support facilities. Murray has extensive experience in the design and management of corporate and mission critical facilities projects with global experience from Australia to London, throughout Asia, Africa, India, Middle East.<\/em><br \/>\n&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In todays note, we are\u00a0focused on data center design. We\u2019ll look into design best practices, examine in depth some of the most interesting recent design trends, and talk with leading data center design experts. Below is the first part in [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":230,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-563","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-leadership","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Best Practice Data Centre Engineering, Procurement, Construction, Management - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?p=563\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Best Practice Data Centre Engineering, Procurement, Construction, Management - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"In todays note, we are\u00a0focused on data center design. We\u2019ll look into design best practices, examine in depth some of the most interesting recent design trends, and talk with leading data center design experts. Below is the first part in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?p=563\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:published_time\" content=\"2018-06-28T02:47:35+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/13a75364f9e525515f00e93f59c4fd10\"},\"headline\":\"Best Practice Data Centre Engineering, Procurement, Construction, Management\",\"datePublished\":\"2018-06-28T02:47:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563\"},\"wordCount\":1206,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#primaryimage\"},\"thumbnailUrl\":\"\",\"articleSection\":[\"Business Leadership\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=563#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563\",\"name\":\"Best Practice Data Centre Engineering, Procurement, Construction, Management - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#primaryimage\"},\"thumbnailUrl\":\"\",\"datePublished\":\"2018-06-28T02:47:35+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/13a75364f9e525515f00e93f59c4fd10\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=563\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#primaryimage\",\"url\":\"\",\"contentUrl\":\"\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=563#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Best Practice Data Centre Engineering, Procurement, Construction, Management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/13a75364f9e525515f00e93f59c4fd10\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?author=3\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Best Practice Data Centre Engineering, Procurement, Construction, Management - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?p=563","og_locale":"en_US","og_type":"article","og_title":"Best Practice Data Centre Engineering, Procurement, Construction, Management - Murray Slatter","og_description":"In todays note, we are\u00a0focused on data center design. We\u2019ll look into design best practices, examine in depth some of the most interesting recent design trends, and talk with leading data center design experts. Below is the first part in [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?p=563","og_site_name":"Murray Slatter","article_published_time":"2018-06-28T02:47:35+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/murrayslatter.me\/?p=563#article","isPartOf":{"@id":"https:\/\/murrayslatter.me\/?p=563"},"author":{"name":"admin","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/13a75364f9e525515f00e93f59c4fd10"},"headline":"Best Practice Data Centre Engineering, Procurement, Construction, Management","datePublished":"2018-06-28T02:47:35+00:00","mainEntityOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=563"},"wordCount":1206,"commentCount":0,"image":{"@id":"https:\/\/murrayslatter.me\/?p=563#primaryimage"},"thumbnailUrl":"","articleSection":["Business Leadership"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/murrayslatter.me\/?p=563#respond"]}]},{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?p=563","url":"https:\/\/murrayslatter.me\/?p=563","name":"Best Practice Data Centre Engineering, Procurement, Construction, Management - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=563#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?p=563#primaryimage"},"thumbnailUrl":"","datePublished":"2018-06-28T02:47:35+00:00","author":{"@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/13a75364f9e525515f00e93f59c4fd10"},"breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?p=563#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?p=563"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?p=563#primaryimage","url":"","contentUrl":""},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?p=563#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Best Practice Data Centre Engineering, Procurement, Construction, Management"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Person","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/13a75364f9e525515f00e93f59c4fd10","name":"admin","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/murrayslatter.me\/?author=3"}]}},"jetpack_featured_media_url":"","jetpack-related-posts":[{"id":4346,"url":"https:\/\/murrayslatter.me\/?p=4346","url_meta":{"origin":563,"position":0},"title":"Paul Teicholz","author":"Murray Slatter","date":"December 6, 2024","format":false,"excerpt":"Paul Teicholz is a distinguished figure in the fields of life cycle costing (LCC) and Building Information Modeling (BIM). His research has significantly advanced the integration of these technologies in the construction industry, particularly focusing on improving project management and sustainability. This essay explores five key findings from Teicholz's extensive\u2026","rel":"","context":"In &quot;Facilities Management and Asset Management&quot;","block_context":{"text":"Facilities Management and Asset Management","link":"https:\/\/murrayslatter.me\/?cat=103"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asset-Management-1-780x345-1.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2386,"url":"https:\/\/murrayslatter.me\/?p=2386","url_meta":{"origin":563,"position":1},"title":"CoE Risk #11: The Role of Data and Analytics in Risk Management","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"In this blog, we will explore the cutting-edge practices and tools that harness data analytics for risk assessment, drawing on the expertise of leading thinkers in the field to significantly enhance the project management landscape.","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide12.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide12.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide12.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide12.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide12.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4321,"url":"https:\/\/murrayslatter.me\/?p=4321","url_meta":{"origin":563,"position":2},"title":"Brian Atkin","author":"Murray Slatter","date":"December 6, 2024","format":false,"excerpt":"Brian Atkin is a distinguished expert in the fields of project management and asset management within the construction industry. His work has significantly influenced contemporary practices in these areas, emphasizing the integration of technology, stakeholder engagement, and efficient management methodologies. This essay highlights five key research-backed findings from Atkin's extensive\u2026","rel":"","context":"In &quot;Facilities Management and Asset Management&quot;","block_context":{"text":"Facilities Management and Asset Management","link":"https:\/\/murrayslatter.me\/?cat=103"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/services-facilities-asset-mgmt.jpg?fit=1024%2C541&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/services-facilities-asset-mgmt.jpg?fit=1024%2C541&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/services-facilities-asset-mgmt.jpg?fit=1024%2C541&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/services-facilities-asset-mgmt.jpg?fit=1024%2C541&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2196,"url":"https:\/\/murrayslatter.me\/?p=2196","url_meta":{"origin":563,"position":3},"title":"CoE Risk #2: Risk Identification and Assessment Techniques","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"What Great Looks Like: Best Practices and Tools for Successful Risk Management Risk management is a critical aspect of program management. In order to ensure the success of a program, project managers must be able to identify and assess potential risks, and implement effective risk management strategies to mitigate those\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2143,"url":"https:\/\/murrayslatter.me\/?p=2143","url_meta":{"origin":563,"position":4},"title":"CoE #1 Cost &#8211; Best Practices for Developing a Program Budget","author":"Murray Slatter","date":"November 5, 2023","format":false,"excerpt":"Program budgeting is an essential component of program management, and developing a comprehensive and accurate budget is critical to the success of any program. In this blog, we will explore the importance of best practices for developing a program budget and provide some practical guidance on how to develop an\u2026","rel":"","context":"In &quot;CoE - Program Management&quot;","block_context":{"text":"CoE - Program Management","link":"https:\/\/murrayslatter.me\/?cat=32"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide2.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide2.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide2.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide2.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide2.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3538,"url":"https:\/\/murrayslatter.me\/?p=3538","url_meta":{"origin":563,"position":5},"title":"Mastering Construction Project Estimation","author":"Murray Slatter","date":"May 25, 2017","format":false,"excerpt":"A Comprehensive Guide for Graduate Engineers\/Estimators and Project Managers Welcome to \"Mastering Construction Project Estimation: A Comprehensive Guide for Graduate Engineers.\" In the dynamic and ever-evolving world of construction, accurate cost estimation is a critical skill that can determine the success of a project. As a graduate engineer stepping into\u2026","rel":"","context":"In &quot;Construction Project Estimating&quot;","block_context":{"text":"Construction Project Estimating","link":"https:\/\/murrayslatter.me\/?cat=79"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/05\/construction-cost-estimates-types.webp?fit=800%2C420&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/05\/construction-cost-estimates-types.webp?fit=800%2C420&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/05\/construction-cost-estimates-types.webp?fit=800%2C420&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/05\/construction-cost-estimates-types.webp?fit=800%2C420&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/563","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=563"}],"version-history":[{"count":0,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/563\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}