{"id":2226,"date":"2024-01-20T07:53:23","date_gmt":"2024-01-20T07:53:23","guid":{"rendered":"https:\/\/murrayslatter.me\/?p=2226"},"modified":"2024-07-18T07:14:52","modified_gmt":"2024-07-17T21:14:52","slug":"series-program-management-fundamentals-3-managing-risks-in-capital-programs","status":"publish","type":"post","link":"https:\/\/murrayslatter.me\/?p=2226","title":{"rendered":"PMF #3 of 12: Managing Risks in Capital Programs"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Managing Risks in Capital Programs: Best Practices and Tools<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Effective risk management is an essential part of successful capital program management. Risks can cause significant disruptions to the program, leading to delays, cost overruns, and even project failure. Continuing on in the <a href=\"https:\/\/murrayslatter.me\/?p=2211\">series<\/a>, we will explore the best practices and tools for managing risks in capital programs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Plan for the Worst, Manage to the Best<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A key factor of Progam Management is to ENSURE that you are thorough in &#8216;Planning for the Worst, Managing to the best&#8221;. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Taking a <em>Risk-Based Approach<\/em> is crucial to being successful in Program Management &#8211; using the SWOT technique to Identify the Opportunities and the threats (Risks). By taking a Risk-based approach you are best placed to be able to leverage the opportunities, minimizing the risks and delivering outsized returns without outsized systemic or idiosyncratic risk.  <\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Identify Opportunities and Risks<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The first step in managing risks in capital programs is to conduct a thorough Risk Assessment, identifying both the potential risks AND most importantly the Opportunities. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This can be done through a risk assessment process that involves stakeholders from across the program. A risk register should be created to document all identified risks, along with their likelihood of occurrence, impact, and mitigations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Evaluate Risks<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once risks are identified, they must be evaluated to determine their potential impact on the program. This evaluation should include the probability of the risk occurring, the severity of the consequences, and the effectiveness of current mitigations. The risk register can be used to prioritize risks and determine which require immediate attention.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Develop Mitigation Strategies<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">After risks are evaluated, mitigation strategies should be developed. Mitigations can be proactive or reactive, and can include risk avoidance, risk transfer, risk reduction, or risk acceptance. The mitigation strategies should be included in the program plan, with assigned responsibilities and timelines.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>What separates great from good risk managers is the ability to use a holistic approach that considers the full range of risks, and their potential impact, + data backed supported with quantitative techniques to inform decision-making<\/p><cite>Murray Slatter &#8211; <a href=\"https:\/\/murrayslatter.me\/?p=2183\">CoE Best Practice Risk in Programmes Series<\/a> <\/cite><\/blockquote><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Managing Risks in Capital Programs: Monitor and Control Risks <\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Risks should be monitored and controlled throughout the program to ensure that the mitigation strategies are effective. The risk register should be regularly reviewed, and new risks should be added as they arise. The effectiveness of mitigation strategies should be evaluated, and adjustments made as necessary.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-amazon wp-block-embed-amazon\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"The Standard for Program Management\" type=\"text\/html\" width=\"640\" height=\"550\" frameborder=\"0\" allowfullscreen style=\"max-width:100%\" src=\"https:\/\/read.amazon.com.au\/kp\/card?preview=inline&#038;linkCode=ll1&#038;ref_=k4w_oembed_s6mPbEySFOku2F&#038;asin=1628251964&#038;tag=bywineexecu09-22\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Use Risk Management Tools<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There are many tools available to help manage risks in capital programs, including Monte Carlo simulation, decision trees, and sensitivity analysis. These tools can be used to model the potential impact of risks, and to evaluate the effectiveness of different mitigation strategies. They can also help in identifying potential risks that may not have been previously identified.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-941c53e2-2411-4ed9-a0cd-bc0582b1c482\">Thought Leadership: Managing Risks in Capital Programs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\" id=\"block-63b47c5a-4dea-4b5b-9d0e-df3fdad941c5\">As always, my material is science and researched backed, therefore I have prepared for your reflection, the thought leaders that I look to in this space:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here are some authors and their relevant books that you could reference in your blog post:<\/p>\n\n\n\n<ol class=\"wp-block-list\" type=\"1\">\n<li>Carl L. Pritchard &#8211; &#8220;<a href=\"https:\/\/www.amazon.com.au\/Risk-Management-Concepts-Guidance-Third\/dp\/1890367397?crid=37P30LCPVUDRD&amp;keywords=Risk+Management%3A+Concepts+and+Guidance%2C+6th+Edition&amp;qid=1705294261&amp;sprefix=risk+management+concepts+and+guidance+6th+edition%2Caps%2C363&amp;sr=8-3&amp;linkCode=ll1&amp;tag=bywineexecu09-22&amp;linkId=422c8bc0b5c6dbe78222bf74bd68d7cd&amp;language=en_AU&amp;ref_=as_li_ss_tl\">Risk Management: Concepts and Guidance, 6th Edition<\/a>&#8220;<\/li>\n\n\n\n<li>David Hillson &#8211; &#8220;<a href=\"https:\/\/www.amazon.com.au\/Managing-Risk-Projects-David-Hillson\/dp\/0566088673?crid=2JDA9W5QQ8AS6&amp;keywords=Managing+Risk+in+Projects&amp;qid=1705294663&amp;sprefix=managing+risk+in+projects%2Caps%2C437&amp;sr=8-1&amp;linkCode=ll1&amp;tag=bywineexecu09-22&amp;linkId=301f55a89a82e4064112839b60aee4cc&amp;language=en_AU&amp;ref_=as_li_ss_tl\">Managing Risk in Projects<\/a>&#8220;<\/li>\n\n\n\n<li>Gregory Balestrero and Nathalie Udo &#8211; &#8220;<a href=\"https:\/\/www.amazon.com.au\/Integrated-Project-Management-Control-Professionals-ebook\/dp\/B00IPA42FQ?crid=11R3SIG2JWRS7&amp;keywords=Integrated+Project+Management+and+Control%3A+First+Comes+the+Theory%2C+then+the+Practice&amp;qid=1705294686&amp;sprefix=integrated+project+management+and+control+first+comes+the+theory+then+the+practice%2Caps%2C223&amp;sr=8-1&amp;linkCode=ll1&amp;tag=bywineexecu09-22&amp;linkId=26a89e93b43b937f170f3962c9c3e0c6&amp;language=en_AU&amp;ref_=as_li_ss_tl\">Integrated Project Management and Control: First Comes the Theory, then the Practice<\/a>&#8220;<\/li>\n\n\n\n<li>Project Management Institute &#8211; &#8220;<a href=\"https:\/\/www.amazon.com.au\/Standard-Program-Management-MANAGEMENT-INSTITUTE\/dp\/1628251964?keywords=Program+Management&amp;qid=1702595484&amp;sr=8-1&amp;linkCode=ll1&amp;tag=bywineexecu09-22&amp;linkId=cb55dd6c732b3cd138bc9eb6518612b8&amp;ref_=as_li_ss_tl\">The Standard for Program Management, 4th Edition<\/a>&#8220;<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">These books offer valuable insights into the best practices and tools for managing risks in capital programs, and can help illustrate the differences between great and good risk management approaches.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Key Takeaways<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Managing risks in capital programs is critical to the success of the program. By identifying and evaluating risks, developing mitigation strategies, monitoring and controlling risks, and using risk management tools, program managers can minimize the impact of risks on the program. With effective risk management, capital programs can be completed on time and within budget, while meeting the objectives of the program.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is so much more that i can share with you on taking a Risk-based approach in being successful (maximizing return leveraging opportunities, minimizing the impacts of risk through expert mitigation and control) in Program Management: I have a course to equip you with the best practice tools.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Connect today: Managing Risks in Capital Programs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Connect today to learn more, <a href=\"https:\/\/share.hsforms.com\/1BOVrPBN0SZSyE6N4ppjRqAeiskf\">register for training<\/a>, or stay in touch with the best practice thinking in this space. <\/p>\n\n\n<div class=\"wp-block-jetpack-contact-form is-layout-flex wp-container-jetpack-contact-form-is-layout-53c17e14 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?p=2226\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.<\/p>\n","protected":false},"author":2,"featured_media":2588,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[34],"tags":[87,51],"class_list":["post-2226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-coe-program-management-fundimentals","tag-coerisk","tag-series","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PMF #3 of 12: Managing Risks in Capital Programs - Murray Slatter<\/title>\n<meta name=\"description\" content=\"Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?p=2226\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PMF #3 of 12: Managing Risks in Capital Programs - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?p=2226\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-20T07:53:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-17T21:14:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Murray Slatter\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Murray Slatter\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226\"},\"author\":{\"name\":\"Murray Slatter\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/9774d7f727e6b917f43267614574f6d5\"},\"headline\":\"PMF #3 of 12: Managing Risks in Capital Programs\",\"datePublished\":\"2024-01-20T07:53:23+00:00\",\"dateModified\":\"2024-07-17T21:14:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226\"},\"wordCount\":777,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1\",\"keywords\":[\"#CoERisk\",\"#Series\"],\"articleSection\":[\"CoE - Program Management Fundimentals\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226\",\"name\":\"PMF #3 of 12: Managing Risks in Capital Programs - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1\",\"datePublished\":\"2024-01-20T07:53:23+00:00\",\"dateModified\":\"2024-07-17T21:14:52+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/9774d7f727e6b917f43267614574f6d5\"},\"description\":\"Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?p=2226\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1\",\"width\":1280,\"height\":720,\"caption\":\"Risks can cause significant disruptions to the program, leading to delays, cost overruns, and even project failure. Continuing on in the series, we will explore the best practices and tools for managing risks in capital programs.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?p=2226#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PMF #3 of 12: Managing Risks in Capital Programs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#\\\/schema\\\/person\\\/9774d7f727e6b917f43267614574f6d5\",\"name\":\"Murray Slatter\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g\",\"caption\":\"Murray Slatter\"},\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?author=2\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PMF #3 of 12: Managing Risks in Capital Programs - Murray Slatter","description":"Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?p=2226","og_locale":"en_US","og_type":"article","og_title":"PMF #3 of 12: Managing Risks in Capital Programs - Murray Slatter","og_description":"Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.","og_url":"https:\/\/murrayslatter.me\/?p=2226","og_site_name":"Murray Slatter","article_published_time":"2024-01-20T07:53:23+00:00","article_modified_time":"2024-07-17T21:14:52+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg","type":"image\/jpeg"}],"author":"Murray Slatter","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Murray Slatter","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/murrayslatter.me\/?p=2226#article","isPartOf":{"@id":"https:\/\/murrayslatter.me\/?p=2226"},"author":{"name":"Murray Slatter","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/9774d7f727e6b917f43267614574f6d5"},"headline":"PMF #3 of 12: Managing Risks in Capital Programs","datePublished":"2024-01-20T07:53:23+00:00","dateModified":"2024-07-17T21:14:52+00:00","mainEntityOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=2226"},"wordCount":777,"commentCount":0,"image":{"@id":"https:\/\/murrayslatter.me\/?p=2226#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1","keywords":["#CoERisk","#Series"],"articleSection":["CoE - Program Management Fundimentals"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/murrayslatter.me\/?p=2226#respond"]}]},{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?p=2226","url":"https:\/\/murrayslatter.me\/?p=2226","name":"PMF #3 of 12: Managing Risks in Capital Programs - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?p=2226#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?p=2226#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1","datePublished":"2024-01-20T07:53:23+00:00","dateModified":"2024-07-17T21:14:52+00:00","author":{"@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/9774d7f727e6b917f43267614574f6d5"},"description":"Great Risk management is foundation in capital program management. Risks can cause major disruptions leading project and program failure.","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?p=2226#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?p=2226"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?p=2226#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1","width":1280,"height":720,"caption":"Risks can cause significant disruptions to the program, leading to delays, cost overruns, and even project failure. Continuing on in the series, we will explore the best practices and tools for managing risks in capital programs."},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?p=2226#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"PMF #3 of 12: Managing Risks in Capital Programs"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Person","@id":"https:\/\/murrayslatter.me\/#\/schema\/person\/9774d7f727e6b917f43267614574f6d5","name":"Murray Slatter","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aa0f1751d211918ccc2037a8b3ce22431cec7bef7edf9c993cee70e20717c88?s=96&d=mm&r=g","caption":"Murray Slatter"},"url":"https:\/\/murrayslatter.me\/?author=2"}]}},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-ManagementSlide4.jpg?fit=1280%2C720&ssl=1","jetpack-related-posts":[{"id":2183,"url":"https:\/\/murrayslatter.me\/?p=2183","url_meta":{"origin":2226,"position":0},"title":"CoE Risk #1: Fundamentals of Risk Management","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"What Great Looks Like: A Guide for Project and Program Managers Risk management is a crucial function of any successful project or program. Effective risk management enables project and program managers to identify potential risks, assess their likelihood and impact, develop strategies to mitigate or respond to those risks, and\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide1.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2211,"url":"https:\/\/murrayslatter.me\/?p=2211","url_meta":{"origin":2226,"position":1},"title":"Program Management Fundamentals","author":"Murray Slatter","date":"January 20, 2024","format":false,"excerpt":"Test yourself: are your actions & outcomes driving success in capital projects? Are you embasing program management fundamentals and winning? Welcome to a 12-part blog series on the best practices, thought leadership, and skills of program management in project-oriented organizations. As a senior executive with extensive experience in having delivered\u2026","rel":"","context":"In &quot;CoE - Program Management Fundimentals&quot;","block_context":{"text":"CoE - Program Management Fundimentals","link":"https:\/\/murrayslatter.me\/?cat=34"},"img":{"alt_text":"Establishing and Leading Programs","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-Management-Slide1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-Management-Slide1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-Management-Slide1.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-Management-Slide1.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/01\/QF-002-1-401-Linkedin-Brand-Slide-Program-Management-Slide1.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2380,"url":"https:\/\/murrayslatter.me\/?p=2380","url_meta":{"origin":2226,"position":2},"title":"CoE Risk #5: Risk Mitigation and Response Strategies","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"Lessons Learned from Successful Programs When it comes to risk mitigation and response strategies, the difference between a good program and a great one often comes down to the depth of understanding and the application of learned lessons. This blog aims to stretch the professional acumen of project managers by\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide6.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide6.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide6.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide6.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide6.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2385,"url":"https:\/\/murrayslatter.me\/?p=2385","url_meta":{"origin":2226,"position":3},"title":"CoE Risk #10: Managing Risks in Complex Programs","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"Lessons Learned from Large-Scale Projects Complex programs bring a multifaceted array of risks, and managing these effectively is what separates exceptional project managers from the rest. In this blog, we explore the distilled wisdom gleaned from large-scale projects and the thought leaders whose insights can transform the practice of risk\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide11.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2147,"url":"https:\/\/murrayslatter.me\/?p=2147","url_meta":{"origin":2226,"position":4},"title":"CoE #5 : COST &#8211; The Role of Risk Management in Program Cost Control","author":"Murray Slatter","date":"November 13, 2023","format":false,"excerpt":"Program cost control is an essential aspect of project management, and risk management plays a vital role in ensuring that program costs are effectively controlled. The process of identifying and assessing risks, and developing strategies to mitigate those risks, can help to minimize cost overruns and keep programs on track.\u2026","rel":"","context":"In &quot;CoE - Program Management&quot;","block_context":{"text":"CoE - Program Management","link":"https:\/\/murrayslatter.me\/?cat=32"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide6.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide6.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide6.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide6.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/11\/Cost-Excellence-in-Program-Management-Slide6.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2196,"url":"https:\/\/murrayslatter.me\/?p=2196","url_meta":{"origin":2226,"position":5},"title":"CoE Risk #2: Risk Identification and Assessment Techniques","author":"Murray Slatter","date":"January 14, 2024","format":false,"excerpt":"What Great Looks Like: Best Practices and Tools for Successful Risk Management Risk management is a critical aspect of program management. In order to ensure the success of a program, project managers must be able to identify and assess potential risks, and implement effective risk management strategies to mitigate those\u2026","rel":"","context":"In &quot;CoE - Risk Management&quot;","block_context":{"text":"CoE - Risk Management","link":"https:\/\/murrayslatter.me\/?cat=33"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2023\/12\/Risk-CoE-Slide3.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/2226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2226"}],"version-history":[{"count":5,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/2226\/revisions"}],"predecessor-version":[{"id":3707,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/posts\/2226\/revisions\/3707"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/2588"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}