{"id":6144,"date":"2026-05-17T17:23:07","date_gmt":"2026-05-17T07:23:07","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=6144"},"modified":"2026-05-17T17:23:08","modified_gmt":"2026-05-17T07:23:08","slug":"empowering-care-on-the-central-coast","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=6144","title":{"rendered":"Empowering Care on the Central Coast"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Hospital Renovation &amp; Infrastructure Upgrade<\/h2>\n\n\n\n<p><strong>Client:<\/strong> Central Coast Area Health Services<br><strong>Location:<\/strong> Woy Woy Hospital, NSW<br><strong>Project Value:<\/strong> AUD $3.5 million<br><strong>Project Duration:<\/strong> 4 months (2023)<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <\/h2>\n\n\n\n<p>Senior leaders within Central Coast Area Health Services were accountable for restoring comfort, safety, and operational reliability across an ageing, live healthcare facility\u2014while maintaining continuity of critical health services and protecting organisational reputation.<\/p>\n\n\n\n<p>The objective was not simply refurbishment, but the delivery of a defensible, well\u2011governed capital outcome that would support staff, patients, and ongoing clinical operations for years to come. <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need<\/h2>\n\n\n\n<p>The project was triggered by a growing volume of complaints from both staff and patrons who were experiencing significant discomfort due to the deteriorating condition of the hospital buildings. The aged roof, outdated air\u2011conditioning, and inadequate stormwater systems were impacting day\u2011to\u2011day operations and patient experience.<\/p>\n\n\n\n<p>Compounding this, the facility remained fully operational, increasing the visibility, risk, and scrutiny of every decision. Potential asbestos risks within the roof cavity added an additional layer of health, safety, and governance complexity\u2014where early missteps could have long\u2011term, irreversible consequences.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p>The works impacted key operational zones across the hospital, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Executive and senior nursing staff offices<\/li>\n\n\n\n<li>Drug and Alcohol Rehabilitation Centre<\/li>\n\n\n\n<li>Outpatient Centre<\/li>\n<\/ul>\n\n\n\n<p>The integrated scope included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Replacement of the existing tiled roof and renovation of the roof structure<\/li>\n\n\n\n<li>Installation of new Colorbond roofing and upgraded gutter systems<\/li>\n\n\n\n<li>Stormwater system upgrades, including additional downpipes and in\u2011ground drainage<\/li>\n\n\n\n<li>Upgrade of the central air\u2011conditioning system<\/li>\n\n\n\n<li>Hygienic cleaning of the roof cavity to mitigate potential asbestos risks<\/li>\n\n\n\n<li>Installation of new insulation within the ceiling void<\/li>\n\n\n\n<li>Complete internal repaint across impacted areas<\/li>\n\n\n\n<li>Access upgrades, including replacement of existing pathways and pathway shelters<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p>The role of the delivery team was to act as a stabilising guide\u2014bringing clarity, structure, and confidence to a complex capital upgrade within a live, regulated healthcare environment.<\/p>\n\n\n\n<p>A staged and carefully sequenced delivery strategy was adopted to ensure:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Critical hospital functions could continue uninterrupted<\/li>\n\n\n\n<li>Safety and hygiene risks were proactively managed<\/li>\n\n\n\n<li>Decisions were aligned with governance, operational, and reputational expectations<\/li>\n<\/ul>\n\n\n\n<p>Rather than adding noise, the focus was on simplifying complexity\u2014ensuring leaders could make informed, defensible decisions at each stage of the project lifecycle.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <em>(Decisions)<\/em><\/h2>\n\n\n\n<p>Key risks requiring deliberate executive\u2011level decision\u2011making included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Delivering construction works within an operational hospital environment<\/li>\n\n\n\n<li>Managing potential asbestos exposure during roof cavity works<\/li>\n\n\n\n<li>Coordinating weather\u2011dependent roofing activities within a fixed program<\/li>\n\n\n\n<li>Maintaining safe access and compliance during pathway upgrades<\/li>\n<\/ul>\n\n\n\n<p>These challenges were addressed through early investigation, disciplined risk management, and close collaboration with hospital stakeholders\u2014ensuring decisions reduced exposure rather than transferring risk downstream.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p>The project delivered a coordinated set of infrastructure and amenity upgrades that addressed both visible and latent issues within the facility:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A renewed building envelope improving weather protection and thermal performance<\/li>\n\n\n\n<li>Enhanced indoor comfort and air quality through upgraded central air\u2011conditioning<\/li>\n\n\n\n<li>Reduced maintenance and water ingress risk via modern stormwater infrastructure<\/li>\n\n\n\n<li>Improved safety and accessibility through upgraded pathways and shelters<\/li>\n\n\n\n<li>A refreshed internal environment supporting staff wellbeing and patient experience<\/li>\n<\/ul>\n\n\n\n<p>All works were completed within the four\u2011month program and the approved $3.5 million budget,<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<p>The distinguishing value of this project lay in its holistic, governance\u2011aware approach. Rather than treating the works as isolated upgrades, roofing, mechanical, safety, and access improvements were integrated into a single, coherent delivery strategy.<\/p>\n\n\n\n<p>This ensured that capital investment translated into real operational benefit\u2014reducing future risk, extending asset life, and supporting healthcare delivery from day one. <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p>The renovation significantly improved comfort, safety, and functionality for both staff and visitors, while mitigating long\u2011standing infrastructure and health risks.<\/p>\n\n\n\n<p>Most importantly, senior leaders were able to demonstrate a clear, defensible capital outcome\u2014delivered with control, confidence, and minimal disruption\u2014extending the service life of a critical regional healthcare asset and reinforcing trust in the organisation\u2019s capital decision\u2011making.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">onnect here to find out more<\/h2>\n\n\n\n<div class=\"wp-block-leadin-hubspot-form-block\">\n\t\t\t\t\t\t<script>\n\t\t\t\t\t\t\twindow.hsFormsOnReady = window.hsFormsOnReady || [];\n\t\t\t\t\t\t\twindow.hsFormsOnReady.push(()=>{\n\t\t\t\t\t\t\t\thbspt.forms.create({\n\t\t\t\t\t\t\t\t\tportalId: 24391455,\n\t\t\t\t\t\t\t\t\tformId: \"04e56b3c-1374-4994-b213-a378a698d1a8\",\n\t\t\t\t\t\t\t\t\ttarget: \"#hbspt-form-1779008544000-8828091235\",\n\t\t\t\t\t\t\t\t\tregion: \"na1\",\n\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t})});\n\t\t\t\t\t\t<\/script>\n\t\t\t\t\t\t<div class=\"hbspt-form\" id=\"hbspt-form-1779008544000-8828091235\"><\/div><\/div>\n\n\n\n<p>For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hospital Renovation &amp; Infrastructure Upgrade Client: Central Coast Area Health ServicesLocation: Woy Woy Hospital, NSWProject Value: AUD $3.5 millionProject Duration: 4 months (2023) Strategic Objective Senior leaders within Central Coast Area Health Services were accountable for restoring comfort, safety, and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6145,"parent":0,"menu_order":-296,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-6144","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Care on the Central Coast - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=6144\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Care on the Central Coast - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Hospital Renovation &amp; Infrastructure Upgrade Client: Central Coast Area Health ServicesLocation: Woy Woy Hospital, NSWProject Value: AUD $3.5 millionProject Duration: 4 months (2023) Strategic Objective Senior leaders within Central Coast Area Health Services were accountable for restoring comfort, safety, and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=6144\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-17T07:23:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"483\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144\",\"name\":\"Empowering Care on the Central Coast - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1\",\"datePublished\":\"2026-05-17T07:23:07+00:00\",\"dateModified\":\"2026-05-17T07:23:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1\",\"width\":750,\"height\":483},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6144#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Care on the Central Coast\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Care on the Central Coast - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=6144","og_locale":"en_US","og_type":"article","og_title":"Empowering Care on the Central Coast - Murray Slatter","og_description":"Hospital Renovation &amp; Infrastructure Upgrade Client: Central Coast Area Health ServicesLocation: Woy Woy Hospital, NSWProject Value: AUD $3.5 millionProject Duration: 4 months (2023) Strategic Objective Senior leaders within Central Coast Area Health Services were accountable for restoring comfort, safety, and [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=6144","og_site_name":"Murray Slatter","article_modified_time":"2026-05-17T07:23:08+00:00","og_image":[{"width":750,"height":483,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=6144","url":"https:\/\/murrayslatter.me\/?page_id=6144","name":"Empowering Care on the Central Coast - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=6144#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=6144#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1","datePublished":"2026-05-17T07:23:07+00:00","dateModified":"2026-05-17T07:23:08+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=6144#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=6144"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=6144#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1","width":750,"height":483},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=6144#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Care on the Central Coast"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":1279,"url":"https:\/\/murrayslatter.me\/?page_id=1279","url_meta":{"origin":6144,"position":0},"title":"Central Coast Council","author":"Murray Slatter","date":"March 8, 2020","format":false,"excerpt":"","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":785,"url":"https:\/\/murrayslatter.me\/?page_id=785","url_meta":{"origin":6144,"position":1},"title":"Healthcare &#8211; Empowering Health, Rest and Recovery","author":"Murray Slatter","date":"January 30, 2019","format":false,"excerpt":"La Trobe Hospital serves over 100,000 patients annually, delivering essential healthcare services with a focus on excellence and innovation. To enhance surgical outcomes and recovery efficiency, the hospital invested in a state-of-the-art eye surgery unit, integrating advanced technologies and modern facilities to meet evolving healthcare standards. Project NameLa Trobe Hospital\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6114,"url":"https:\/\/murrayslatter.me\/?page_id=6114","url_meta":{"origin":6144,"position":2},"title":"Health &amp; Allied Health Sector","author":"Murray Slatter","date":"May 16, 2026","format":false,"excerpt":"Capital Construction & Health Infrastructure Delivery Delivering capital construction in Health and Allied Health environments is fundamentally different to building anywhere else. Leaders responsible for health infrastructure are accountable not only for time, cost and scope, but for patient safety, clinical continuity, compliance, workforce impact and long\u2011term operational performance \u2014\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Health_Allied_Health.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Health_Allied_Health.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Health_Allied_Health.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Health_Allied_Health.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Health_Allied_Health.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":788,"url":"https:\/\/murrayslatter.me\/?page_id=788","url_meta":{"origin":6144,"position":3},"title":"Defence &#8211; Empowering Safer defence facilities","author":"Murray Slatter","date":"January 6, 2019","format":false,"excerpt":"Project NameMilitary Police Central Administration Fit-OutClient CompanyDefence \u2013 Holsworthy, NSWProject TypeCapital Project \u2013 RenovationProject Value$5mProject Start and FinishJune 2003 - December 2004Strategic ObjectiveTo design and construct a state-of-the-art central administration facility for the Military Police (MP), supporting rehabilitation-focused operations, integrating advanced security systems, and creating a functional yet aesthetically empowering\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Holsworthy-Army-Barracks-171-Squadron-1-e1734164882382.jpg?fit=478%2C294&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":22,"url":"https:\/\/murrayslatter.me\/","url_meta":{"origin":6144,"position":4},"title":"A little about me!","author":"Murray Slatter","date":"October 10, 2018","format":false,"excerpt":"Empowering Good Companies to be Great, transforming lives! With over 25 years of experience, I've had the privilege of leading and collaborating with hundreds of teams across a rich tapestry of cultures, shaping and advancing some of the world\u2019s most challenging projects and transformative ideas. Whether orchestrating the integration of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/03\/Murray-SlatterJPEG.jpg?fit=200%2C200&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4625,"url":"https:\/\/murrayslatter.me\/?page_id=4625","url_meta":{"origin":6144,"position":5},"title":"Equipping the Digital Television Era","author":"Murray Slatter","date":"December 22, 2024","format":false,"excerpt":"Following 46 Years of analogue television creation, aggregation and transimission, delivering 24x7 News and entertainment to millions of Australians, My team led the development of Digital Television: Design & Constuction of Upgrades to 11 operational critical enviroments doubling the size of the floorplate, whilst integrating into the existing Transmission stacks\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/6144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6144"}],"version-history":[{"count":1,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/6144\/revisions"}],"predecessor-version":[{"id":6146,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/6144\/revisions\/6146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/6145"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}