{"id":6121,"date":"2026-05-16T16:48:33","date_gmt":"2026-05-16T06:48:33","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=6121"},"modified":"2026-05-17T16:38:58","modified_gmt":"2026-05-17T06:38:58","slug":"japara_casestudy","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=6121","title":{"rendered":"Empowering Care: Aged Care Upgrade"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Client<\/strong>: Japara HealthCare<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Location<\/strong>: South West Rocks, NSW<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project Value<\/strong>: ~$2.5 million<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project Duration<\/strong>: March 2019 \u2013 May 2019<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project Type<\/strong>: Live Aged Care Facility Upgrade<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, staff amenity, and compliance with contemporary Australian standards following the Royal Commission into Aged Care, while maintaining continuity of care and daily operations at Japara HealthCare&#8217; Northern New South Wales jewel.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Sawtelle project was delivered within a fully operational aged\u2011care facility, presenting the inherent complexities of working around vulnerable residents, clinical staff, visitors, and multiple internal stakeholders.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond the typical challenges of healthcare construction in an active environment, the project faced two significant constraints:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulatory pressure: Works needed to address identified risks and compliance gaps highlighted by the Royal Commission into Aged Care, requiring precision, diligence, and sensitivity.<\/li>\n\n\n\n<li>Regional resourcing limitations: Sawtelle\u2019s remote location meant there were limited local trades with the required level of competency for specialist healthcare works, necessitating careful sourcing and coordination of skilled contractors from other regional centres.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Our approach was grounded in risk management, stakeholder engagement, and meticulous staging.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Delivering works in clearly defined stages to minimise disruption to residents and staff.<\/li>\n\n\n\n<li>Close coordination with facility management to align construction activities with daily care routines.<\/li>\n\n\n\n<li>Proactive engagement with specialist regional trades, ensuring the right skills were available at the right time despite geographic constraints.<\/li>\n\n\n\n<li>Maintaining strict site controls to uphold safety, infection control, and operational continuity in a healthcare setting.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered a comprehensive upgrade across multiple areas of the facility, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Renovation of staff kitchen and staff meals areas, significantly improving staff amenity and functionality.<\/li>\n\n\n\n<li>Upgrade of the multi\u2011purpose centre, enhancing a shared space used by tenants for daily activities and community engagement.<\/li>\n\n\n\n<li>Provision and installation of new lifts, improving accessibility and movement throughout the facility.<\/li>\n\n\n\n<li>Renovation of the dementia ward, including targeted upgrades to meet current Australian standards and mitigate identified risks.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">All works were completed while the facility remained operational, with no compromise to resident care.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges Managed<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Operating within a live healthcare environment with vulnerable residents.<\/li>\n\n\n\n<li>Coordinating multiple stakeholder groups with competing priorities.<\/li>\n\n\n\n<li>Managing workforce availability and logistics in a remote regional location.<\/li>\n\n\n\n<li>Ensuring full compliance with evolving aged\u2011care standards and regulatory expectations.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiators<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Healthcare expertise in live environments: Proven ability to deliver complex upgrades without disrupting care delivery.<\/li>\n\n\n\n<li>Regional delivery capability: Access to, and coordination of, skilled trades across regional NSW where local capacity is limited.<\/li>\n\n\n\n<li>Regulatory insight: Deep understanding of aged\u2011care compliance requirements post\u2011Royal Commission.<\/li>\n\n\n\n<li>Stakeholder\u2011first mindset: Clear communication and collaboration with client representatives and facility staff throughout the project lifecycle.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Sawtelle project was successfully delivered on time and within scope, resulting in safer, more compliant facilities and significantly improved environments for both residents and staff. The upgrades strengthened the client\u2019s readiness for regulatory scrutiny while enhancing day\u2011to\u2011day functionality in a challenging operational setting.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Connect here to find out more<\/h2>\n\n\n\n<div class=\"wp-block-leadin-hubspot-form-block\">\n\t\t\t\t\t\t<script>\n\t\t\t\t\t\t\twindow.hsFormsOnReady = window.hsFormsOnReady || [];\n\t\t\t\t\t\t\twindow.hsFormsOnReady.push(()=>{\n\t\t\t\t\t\t\t\thbspt.forms.create({\n\t\t\t\t\t\t\t\t\tportalId: 24391455,\n\t\t\t\t\t\t\t\t\tformId: \"04e56b3c-1374-4994-b213-a378a698d1a8\",\n\t\t\t\t\t\t\t\t\ttarget: \"#hbspt-form-1782935599000-8521651100\",\n\t\t\t\t\t\t\t\t\tregion: \"na1\",\n\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t})});\n\t\t\t\t\t\t<\/script>\n\t\t\t\t\t\t<div class=\"hbspt-form\" id=\"hbspt-form-1782935599000-8521651100\"><\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">More <a href=\"https:\/\/murrayslatter.me\/?page_id=6114\">Health Case Studies here<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client: Japara HealthCare Location: South West Rocks, NSW Project Value: ~$2.5 million Project Duration: March 2019 \u2013 May 2019 Project Type: Live Aged Care Facility Upgrade Strategic Objective To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6122,"parent":0,"menu_order":-291,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-6121","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Care: Aged Care Upgrade - Murray Slatter<\/title>\n<meta name=\"description\" content=\"To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, amenity, and compliance with contemporary Australian standards\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=6121\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Care: Aged Care Upgrade - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, amenity, and compliance with contemporary Australian standards\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=6121\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-17T06:38:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"643\" \/>\n\t<meta property=\"og:image:height\" content=\"288\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121\",\"name\":\"Empowering Care: Aged Care Upgrade - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1\",\"datePublished\":\"2026-05-16T06:48:33+00:00\",\"dateModified\":\"2026-05-17T06:38:58+00:00\",\"description\":\"To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, amenity, and compliance with contemporary Australian standards\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1\",\"width\":643,\"height\":288},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=6121#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Care: Aged Care Upgrade\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Care: Aged Care Upgrade - Murray Slatter","description":"To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, amenity, and compliance with contemporary Australian standards","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=6121","og_locale":"en_US","og_type":"article","og_title":"Empowering Care: Aged Care Upgrade - Murray Slatter","og_description":"To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, amenity, and compliance with contemporary Australian standards","og_url":"https:\/\/murrayslatter.me\/?page_id=6121","og_site_name":"Murray Slatter","article_modified_time":"2026-05-17T06:38:58+00:00","og_image":[{"width":643,"height":288,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=6121","url":"https:\/\/murrayslatter.me\/?page_id=6121","name":"Empowering Care: Aged Care Upgrade - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=6121#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=6121#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1","datePublished":"2026-05-16T06:48:33+00:00","dateModified":"2026-05-17T06:38:58+00:00","description":"To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, amenity, and compliance with contemporary Australian standards","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=6121#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=6121"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=6121#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1","width":643,"height":288},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=6121#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Care: Aged Care Upgrade"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":6144,"url":"https:\/\/murrayslatter.me\/?page_id=6144","url_meta":{"origin":6121,"position":0},"title":"Empowering Care on the Central Coast","author":"Murray Slatter","date":"May 17, 2026","format":false,"excerpt":"Hospital Renovation & Infrastructure Upgrade Client: Central Coast Area Health ServicesLocation: Woy Woy Hospital, NSWProject Value: AUD $3.5 millionProject Duration: 4 months (2023) Strategic Objective Senior leaders within Central Coast Area Health Services were accountable for restoring comfort, safety, and operational reliability across an ageing, live healthcare facility\u2014while maintaining continuity\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/WoyWoy-Hospital1.jpg?fit=750%2C483&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":243,"url":"https:\/\/murrayslatter.me\/?page_id=243","url_meta":{"origin":6121,"position":1},"title":"Empowering the Brightest minds lead the future &#8211; Charles Sturt Uni","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"Client: University (HUBCentral)Location: New South Wales, AustraliaProject Type: Capital Upgrade \u2013 Live Operational EnvironmentProject Value: $3.5mProject Duration:2014Role: Program Leadership & Project Management Strategic Objective HUBCentral is a highly utilised, multi\u2011functional campus facility supporting students, staff, and visitors. As the building aged, its functionality, atmosphere, and building services no longer supported\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":785,"url":"https:\/\/murrayslatter.me\/?page_id=785","url_meta":{"origin":6121,"position":2},"title":"Healthcare &#8211; Empowering Health, Rest and Recovery","author":"Murray Slatter","date":"January 30, 2019","format":false,"excerpt":"La Trobe Hospital Eye Surgery Fit-out Client: La Trobe Hospital Location: La Trobe Valley, VIC Project Type: Specialist Eye Surgery Fitout Project Value: $11.5m Project Duration: June 2017 - Nov 2017 Strategic Objective La Trobe Hospital serves more than 100,000 patients annually and is recognised for its commitment to clinical\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/VHHSBA-Health-2.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":246,"url":"https:\/\/murrayslatter.me\/?page_id=246","url_meta":{"origin":6121,"position":3},"title":"Empowering Brighter Smiles &#8211; Charles Sturt Uni &#8211; Dentistry School","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"Client: Charles Sturt UniversityLocation: NSW, AustraliaProject Type: Clinical Facility Upgrade | Electrical & Lighting Systems RemediationProject Value: $15.7mProject Duration: 2014Role: Program Leadership, Design Coordination & Delivery Strategic Objective Following the construction of a first\u2011class dentistry school, Charles Sturt University identified growing issues with the electrical and lighting systems that were\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6133,"url":"https:\/\/murrayslatter.me\/?page_id=6133","url_meta":{"origin":6121,"position":4},"title":"Live\u2011Environment Kitchen &amp; Dining Reconstruction","author":"Murray Slatter","date":"May 17, 2026","format":false,"excerpt":"Project Overview Client: Evergreen LivingLocation: Gosford, NSWFacility Type: Hospice Care FacilityProject Type: Commercial Kitchen & Dining Facility ReconstructionProject Value: Approximately AUD $3.5 millionProject Duration: February 2022 \u2013 June 2022 Evergreen Living\u2019s executive and operational leadership were accountable for the performance of critical catering infrastructure within a live, regulated healthcare environment.\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/EverGreen.png?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/EverGreen.png?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/EverGreen.png?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/EverGreen.png?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/EverGreen.png?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":237,"url":"https:\/\/murrayslatter.me\/?page_id=237","url_meta":{"origin":6121,"position":5},"title":"Empowering the Minds of the Future &#8211; Charles Sturt Uni","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"With a strategic Focus on reducing their carbon foot print, Charles Sturt Uni's Engineering team undertook an Energy Efficiency Charles Sturt University \u2013 Energy Efficiency & Lighting Upgrade Program Client: Charles Sturt UniversityLocation: New South Wales, AustraliaProject Type: Energy Efficiency Program | Operational Facility UpgradeProject Duration:[Program Year]Role: Program Leadership &\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/6121","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6121"}],"version-history":[{"count":2,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/6121\/revisions"}],"predecessor-version":[{"id":6128,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/6121\/revisions\/6128"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/6122"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}