{"id":592,"date":"2018-07-10T08:03:29","date_gmt":"2018-07-09T22:03:29","guid":{"rendered":"http:\/\/www.q3ed.com\/?page_id=592"},"modified":"2024-12-22T20:16:28","modified_gmt":"2024-12-22T09:16:28","slug":"rtio-hco-fuel-farm","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=592","title":{"rendered":"RTIO &#8211; HCO Fuel Farm"},"content":{"rendered":"\n<p>RTIO engaged our team to Project Manager, Design, Install, Test and Commission&nbsp;the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, bund installation, water treatment and tailing ponds, heavy Mechanical, Electrical, complex Electronic and Instrumentation\/communications systems.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td>HCO Fuel Farm Facility Development<\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>Rio Tinto Iron Ore (RTIO)<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Industrial Infrastructure \u2013 Fuel Farm Construction<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>$10.5m<\/td><\/tr><tr><td><strong>Project Start and Finish<\/strong><\/td><td>September 2012 &#8211; December 2013<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To design, construct, install, test, and commission a fully operational fuel farm facility at Rio Tinto Cape Lambert, ensuring seamless integration of mechanical, electrical, and safety systems for sustainable and reliable operations.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>&#8211; Develop a large-scale fuel farm facility with integrated mechanical, electrical, and instrumentation systems.<br>&#8211; Manage complex piping networks, bund installations, and water treatment systems.<br>&#8211; Maintain uninterrupted operations during phased construction and commissioning.<br>&#8211; Uphold stringent safety and environmental compliance standards.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>&#8211; <strong>Engineering Leadership:<\/strong> Led by a team of designers, engineers, and PLC\/SCADA specialists.<br>&#8211; <strong>Stakeholder Alignment:<\/strong> Ensured alignment across RTIO leadership and operational teams.<br>&#8211; <strong>Safety and Compliance:<\/strong> Designed robust safety systems and implemented stringent monitoring processes.<br>&#8211; <strong>Program Management:<\/strong> Oversaw procurement control, contractor evaluations, and adherence to delivery milestones.<br>&#8211; <strong>Phased Execution:<\/strong> Managed staged construction to ensure operational continuity.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Construction of Fuel Farm Infrastructure with eight diesel fuel tanks.<br>&#8211; Installation of MEP Pipe Reticulation and Pipe Bridge Systems.<br>&#8211; Deployment of Oily Water Separator and Water Treatment Facilities.<br>&#8211; Construction of Bund Installation and Tailings Ponds.<br>&#8211; Integration of Heavy Mechanical, Electrical, and Instrumentation Systems.<br>&#8211; Comprehensive BIM-referenced documentation and integration with DCM systems.<br>&#8211; Operational Training and Handover Documentation.<\/td><\/tr><tr><td><strong>Risks and Challenges<\/strong><\/td><td>&#8211; Ensuring safety compliance across 111,000 work hours.<br>&#8211; Managing environmental and operational risks during construction phases.<br>&#8211; Coordinating multidisciplinary teams and contractors across complex tasks.<br>&#8211; Adhering to strict timelines while maintaining operational continuity.<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>&#8211; Delivered a fully operational fuel farm facility on time and within scope.<br>&#8211; Achieved <strong>Zero Lost Time Injuries (LTI)<\/strong> across 111,000 work hours.<br>&#8211; Successfully integrated advanced safety, instrumentation, and operational systems.<br>&#8211; Provided comprehensive documentation and training, ensuring seamless operational handover.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; <strong>Integrated Delivery:<\/strong> A holistic approach covering design, procurement, construction, and commissioning.<br>&#8211; <strong>Safety Leadership:<\/strong> Maintained exceptional safety standards with zero LTIs.<br>&#8211; <strong>Technical Expertise:<\/strong> Advanced integration of heavy mechanical, electrical, and instrumentation systems.<br>&#8211; <strong>Client-Centric Approach:<\/strong> Strong engagement with stakeholders to ensure alignment across every phase.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Check out more about the industries I have served : <a href=\"https:\/\/murrayslatter.me\/?page_id=717\">Here<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">TEAM<\/h3>\n\n\n\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Lead designer<\/li>\n\n\n\n<li>3 x Engineers, 5 x Drafters<\/li>\n\n\n\n<li>3 x PLC\/SCADA designers<\/li>\n\n\n\n<li>1 x PM<\/li>\n<\/ul>\n\n\n\n<p><strong>SMP Construction <\/strong>for the Construction project the team will consist of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Project Manager<\/li>\n\n\n\n<li>1 x Construction Engineer<\/li>\n\n\n\n<li>2 x Fabrication contractors<\/li>\n\n\n\n<li>1 x Erection contractor<\/li>\n\n\n\n<li>3 x functional contractors<\/li>\n\n\n\n<li>1 x Electrical contractor<\/li>\n\n\n\n<li>1 x Project Manager<\/li>\n\n\n\n<li>1 x Quality Manager<\/li>\n\n\n\n<li>1 x Construction Manager<\/li>\n\n\n\n<li>1 x Safety Manager<\/li>\n<\/ul>\n\n\n\n<p>Project was completed with 111,000 hrs with ZERO LTI and 2 x FAI.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Broader Program Integration<\/h3>\n\n\n\n<p>As the project existed within a broader Portfolio and Program of works, our team worked with all other aligned stakeholder groups, including Client side Portfolio Managers, Engineering Directors, Cost Engineers to ensure compliance of the Project across the board: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineering and Project Management of: the design and implementation of all functional disciplines<\/li>\n\n\n\n<li>Engineering Level decisions for Structural, Mechanical, Piping, Electrical Supply, Distribution, Instrumentation.<\/li>\n\n\n\n<li>Management of the Project\/Program Office, further redevelopment of the Project Management system in application, execution conformance\/monitoring.<\/li>\n\n\n\n<li>Engineering design process review and execution conformance\/monitoring<\/li>\n\n\n\n<li>Regional Board level client control<\/li>\n\n\n\n<li>Responsible for all aspects of Engineering design, Construction at site, Risk, Legal, Finance, SHRM, Quality.<\/li>\n\n\n\n<li>Leading the Procurement control process, Contractor evaluations, and Contractor Contract negotiations.<\/li>\n<\/ul>\n\n\n\n<p>Safety system development and execution conformance<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RTIO engaged our team to Project Manager, Design, Install, Test and Commission&nbsp;the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4493,"parent":0,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-592","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>RTIO - HCO Fuel Farm - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=592\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RTIO - HCO Fuel Farm - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"RTIO engaged our team to Project Manager, Design, Install, Test and Commission&nbsp;the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=592\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-22T09:16:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1098\" \/>\n\t<meta property=\"og:image:height\" content=\"538\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592\",\"name\":\"RTIO - HCO Fuel Farm - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/CLTSF3.png?fit=1098%2C538&ssl=1\",\"datePublished\":\"2018-07-09T22:03:29+00:00\",\"dateModified\":\"2024-12-22T09:16:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/CLTSF3.png?fit=1098%2C538&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/CLTSF3.png?fit=1098%2C538&ssl=1\",\"width\":1098,\"height\":538},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RTIO &#8211; HCO Fuel Farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"RTIO - HCO Fuel Farm - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=592","og_locale":"en_US","og_type":"article","og_title":"RTIO - HCO Fuel Farm - Murray Slatter","og_description":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission&nbsp;the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=592","og_site_name":"Murray Slatter","article_modified_time":"2024-12-22T09:16:28+00:00","og_image":[{"width":1098,"height":538,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=592","url":"https:\/\/murrayslatter.me\/?page_id=592","name":"RTIO - HCO Fuel Farm - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=592#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=592#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1","datePublished":"2018-07-09T22:03:29+00:00","dateModified":"2024-12-22T09:16:28+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=592#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=592"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=592#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1","width":1098,"height":538},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=592#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"RTIO &#8211; HCO Fuel Farm"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":589,"url":"https:\/\/murrayslatter.me\/?page_id=589","url_meta":{"origin":592,"position":0},"title":"RTIO &#8211; Trip Services Facility","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the Locomotive Trip Services and refuelling facility to the Rio Tinto Cape Lambert facility. Works include, construction of Locomotive shed, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, water treatment and tailing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4649,"url":"https:\/\/murrayslatter.me\/?page_id=4649","url_meta":{"origin":592,"position":1},"title":"Empowering Tax Regulation Compliance  BMA2","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$1,537,332Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission a state-of-the-art 500,000-litre fuel farm infrastructure, ensuring\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4652,"url":"https:\/\/murrayslatter.me\/?page_id=4652","url_meta":{"origin":592,"position":2},"title":"Empowering Tax Regulation Compliance BMA","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$3,3m Project Start and Finish2013 \u2013 2013Strategic ObjectiveTo design, install, and commission an upgraded fuel storage,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":195,"url":"https:\/\/murrayslatter.me\/?page_id=195","url_meta":{"origin":592,"position":3},"title":"Rio Tinto &#8211; Fuel Management Systems","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"RTIO engaged our client to implement a Fuel management system to 176 locations throughout 16 sites in the RTIO suite of properties from Port Hedland to East and West sites. The Fuel management system was designed to capture every drop of the 2 billion litres of diesel that RTIO uses\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4648,"url":"https:\/\/murrayslatter.me\/?page_id=4648","url_meta":{"origin":592,"position":4},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Orebody24 Light Vehicles & Heavy Vehicles Fuel Systems Installations Project NameOrebody24 Light Vehicles & Heavy Vehicles Fuel Systems InstallationsClient CompanyBHPIOProject TypeCapital Project \u2013 Industrial ProcessProject Value$3,7mProject Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission advanced fuel systems for both light and heavy vehicles at the Orebody24 mine site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4647,"url":"https:\/\/murrayslatter.me\/?page_id=4647","url_meta":{"origin":592,"position":5},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and Monitoring Project NameBHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and MonitoringClient CompanyBHPIO (BHP Iron Ore)Project TypeCapital Project \u2013 Industrial ProcessProject Value$6,602,025Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo upgrade and optimize the fuel system infrastructure at Jimblebar Mine Site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=592"}],"version-history":[{"count":4,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/592\/revisions"}],"predecessor-version":[{"id":4604,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/592\/revisions\/4604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4493"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}