{"id":592,"date":"2018-07-10T08:03:29","date_gmt":"2018-07-09T22:03:29","guid":{"rendered":"http:\/\/www.q3ed.com\/?page_id=592"},"modified":"2026-06-06T07:17:06","modified_gmt":"2026-06-05T21:17:06","slug":"rtio-hco-fuel-farm","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=592","title":{"rendered":"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Rio Tinto Iron Ore (RTIO)<br><strong>Location:<\/strong> Cape Lambert, Western Australia<br><strong>Project Type:<\/strong> Industrial Infrastructure \u2013 Fuel Farm Construction (Critical Infrastructure)<br><strong>Project Value:<\/strong> AUD $10.5 million<br><strong>Project Duration:<\/strong> September 2012 \u2013 December 2013<br><strong>Role:<\/strong> Program Director \/ Head Contractor<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Rio Tinto Iron Ore required a new <strong>high\u2011capacity, safety\u2011critical fuel farm<\/strong> at Cape Lambert to support sustained rail and port operations within one of Australia\u2019s most demanding export environments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Senior operational and engineering leaders were accountable for delivering a facility that would safely store, manage, and distribute fuel\u2014while integrating seamlessly with live port operations and meeting stringent safety and environmental standards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective was to <strong>design, construct, install, test, and commission a fully operational fuel farm<\/strong>, delivering long\u2011term reliability, operational resilience, and compliance under high\u2011hazard conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project presented layered complexity and risk:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of a <strong>large\u2011scale fuel farm<\/strong> within an active port and rail environment<\/li>\n\n\n\n<li>Integration of <strong>mechanical, electrical, electronic, instrumentation, and communications systems<\/strong><\/li>\n\n\n\n<li>Complex piping networks, bunding, oily water separation, water treatment, and tailings management<\/li>\n\n\n\n<li>Requirement to maintain <strong>continuous operations<\/strong> throughout staged construction and commissioning<\/li>\n\n\n\n<li>Zero tolerance for uncontrolled environmental discharge or safety incidents<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Sequencing, interface control, and safety governance were critical to success.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">RTIO engaged the team to <strong>Project Manage, Design, Install, Test, and Commission<\/strong> the full fuel farm facility, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of the complete fuel farm<\/li>\n\n\n\n<li>Installation of <strong>eight diesel fuel storage tanks<\/strong><\/li>\n\n\n\n<li>MEP pipe reticulation and pipe bridges<\/li>\n\n\n\n<li>Bunding systems and environmental containment<\/li>\n\n\n\n<li>Oily water separators, water treatment systems, and tailings ponds<\/li>\n\n\n\n<li>Heavy mechanical, electrical, electronic, instrumentation, and communications systems<\/li>\n\n\n\n<li>Full operational documentation, training, and handover<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>systems\u2011led, safety\u2011critical delivery model<\/strong> was applied to stabilise complexity while maintaining operational continuity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Engineering Leadership:<\/strong> Integrated design delivery led by engineers and PLC\/SCADA specialists<\/li>\n\n\n\n<li><strong>Stakeholder Alignment:<\/strong> Continuous engagement with RTIO operations, engineering, safety, and leadership teams<\/li>\n\n\n\n<li><strong>Safety &amp; Compliance Governance:<\/strong> Design and execution of robust safety systems supported by real\u2011time monitoring<\/li>\n\n\n\n<li><strong>Program &amp; Procurement Control:<\/strong> Contractor evaluation, contract negotiation, and milestone governance<\/li>\n\n\n\n<li><strong>Phased Execution:<\/strong> Carefully sequenced construction and commissioning to avoid operational disruption<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">I led the delivery as <strong>Program Director<\/strong>, accountable across design, construction, safety, and commissioning.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks requiring deliberate management included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Executing large\u2011scale fuel infrastructure works within a live operational environment<\/li>\n\n\n\n<li>Managing safety and environmental compliance across <strong>111,000 work hours<\/strong><\/li>\n\n\n\n<li>Coordinating multidisciplinary contractors across civil, mechanical, electrical, and control systems<\/li>\n\n\n\n<li>Maintaining schedule certainty while executing staged construction and commissioning<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through disciplined sequencing, interface control, and proactive safety leadership.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A fully constructed and operational <strong>fuel farm facility<\/strong> with eight diesel tanks<\/li>\n\n\n\n<li>Integrated MEP pipe reticulation and pipe bridge systems<\/li>\n\n\n\n<li>Environmental protection systems including bunding, oily water separation, and water treatment<\/li>\n\n\n\n<li>Heavy mechanical, electrical, and instrumentation installations<\/li>\n\n\n\n<li>BIM\u2011referenced documentation integrated with Digital Control Models (DCM)<\/li>\n\n\n\n<li>Comprehensive operational training and handover documentation<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery &amp; Safety Performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>~111,000 work hours<\/strong><\/li>\n\n\n\n<li><strong>Zero Lost Time Injuries (LTI)<\/strong><\/li>\n\n\n\n<li><strong>Two First Aid Incidents (FAI)<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This outcome reflected strong safety leadership in a high\u2011hazard industrial environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Delivered a <strong>fully commissioned fuel farm<\/strong> on time and within scope<\/li>\n\n\n\n<li>Achieved seamless integration into RTIO\u2019s Cape Lambert operations<\/li>\n\n\n\n<li>Met all safety, environmental, and operational compliance requirements<\/li>\n\n\n\n<li>Enabled a clean, confident operational handover<\/li>\n\n\n\n<li>Reduced long\u2011term fuel handling risk and improved operational resilience<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">RTIO leadership achieved a defensible capital outcome supporting sustained port and rail performance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery Team<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Design Phase<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Lead Designer<\/li>\n\n\n\n<li>3 \u00d7 Engineers<\/li>\n\n\n\n<li>5 \u00d7 Drafters<\/li>\n\n\n\n<li>3 \u00d7 PLC \/ SCADA Designers<\/li>\n\n\n\n<li>1 \u00d7 Project Manager<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>SMP Construction Phase<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Project Manager<\/li>\n\n\n\n<li>1 \u00d7 Construction Engineer<\/li>\n\n\n\n<li>2 \u00d7 Fabrication Contractors<\/li>\n\n\n\n<li>1 \u00d7 Erection Contractor<\/li>\n\n\n\n<li>3 \u00d7 Functional Contractors<\/li>\n\n\n\n<li>1 \u00d7 Electrical Contractor<\/li>\n\n\n\n<li>1 \u00d7 Construction Manager<\/li>\n\n\n\n<li>1 \u00d7 Quality Manager<\/li>\n\n\n\n<li>1 \u00d7 Safety Manager<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Broader Program Integration <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Delivered as part of a broader RTIO <strong>portfolio and program of works<\/strong>, the project required alignment with regional and Board\u2011level governance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Accountabilities included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineering and project management across all functional disciplines<\/li>\n\n\n\n<li>Engineering\u2011level decisions for structural, mechanical, piping, electrical supply and distribution, and instrumentation<\/li>\n\n\n\n<li>Management of the Project \/ Program Management Office and execution conformance<\/li>\n\n\n\n<li>Engineering design review and compliance monitoring<\/li>\n\n\n\n<li>Regional Board\u2011level reporting and control<\/li>\n\n\n\n<li>Accountability for risk, legal, finance, SHRM, quality, and safety systems<\/li>\n\n\n\n<li>Leadership of procurement control, contractor evaluation, and contract negotiation<\/li>\n\n\n\n<li>Safety system development and execution conformance<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>End\u2011to\u2011End Integration:<\/strong> Design through commissioning under single accountable leadership<\/li>\n\n\n\n<li><strong>Safety Leadership:<\/strong> Zero LTI across a high\u2011hazard fuel infrastructure project<\/li>\n\n\n\n<li><strong>Systems Integration Mastery:<\/strong> Mechanical, electrical, and instrumentation systems delivered as a coherent whole<\/li>\n\n\n\n<li><strong>Operational Continuity:<\/strong> Phased delivery protecting live operations<\/li>\n\n\n\n<li><strong>Governance Discipline:<\/strong> Delivery aligned with portfolio and Board\u2011level expectations<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=592\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client: Rio Tinto Iron Ore (RTIO)Location: Cape Lambert, Western AustraliaProject Type: Industrial Infrastructure \u2013 Fuel Farm Construction (Critical Infrastructure)Project Value: AUD $10.5 millionProject Duration: September 2012 \u2013 December 2013Role: Program Director \/ Head Contractor Strategic Objective Rio Tinto Iron Ore [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4493,"parent":0,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-592","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert - Murray Slatter<\/title>\n<meta name=\"description\" content=\"RTIO built a new high\u2011capacity, safety\u2011critical fuel farm at Cape Lambert for sustained rail and port operations within a most demanding environment\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=592\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"RTIO built a new high\u2011capacity, safety\u2011critical fuel farm at Cape Lambert for sustained rail and port operations within a most demanding environment\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=592\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T21:17:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1098\" \/>\n\t<meta property=\"og:image:height\" content=\"538\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592\",\"name\":\"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/CLTSF3.png?fit=1098%2C538&ssl=1\",\"datePublished\":\"2018-07-09T22:03:29+00:00\",\"dateModified\":\"2026-06-05T21:17:06+00:00\",\"description\":\"RTIO built a new high\u2011capacity, safety\u2011critical fuel farm at Cape Lambert for sustained rail and port operations within a most demanding environment\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/CLTSF3.png?fit=1098%2C538&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/CLTSF3.png?fit=1098%2C538&ssl=1\",\"width\":1098,\"height\":538},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=592#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert - Murray Slatter","description":"RTIO built a new high\u2011capacity, safety\u2011critical fuel farm at Cape Lambert for sustained rail and port operations within a most demanding environment","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=592","og_locale":"en_US","og_type":"article","og_title":"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert - Murray Slatter","og_description":"RTIO built a new high\u2011capacity, safety\u2011critical fuel farm at Cape Lambert for sustained rail and port operations within a most demanding environment","og_url":"https:\/\/murrayslatter.me\/?page_id=592","og_site_name":"Murray Slatter","article_modified_time":"2026-06-05T21:17:06+00:00","og_image":[{"width":1098,"height":538,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=592","url":"https:\/\/murrayslatter.me\/?page_id=592","name":"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=592#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=592#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1","datePublished":"2018-07-09T22:03:29+00:00","dateModified":"2026-06-05T21:17:06+00:00","description":"RTIO built a new high\u2011capacity, safety\u2011critical fuel farm at Cape Lambert for sustained rail and port operations within a most demanding environment","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=592#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=592"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=592#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1","width":1098,"height":538},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=592#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"HCO Fuel Farm Facility Development \u2013 Rio Tinto Cape Lambert"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":589,"url":"https:\/\/murrayslatter.me\/?page_id=589","url_meta":{"origin":592,"position":0},"title":"Empowering Rio Tinto&#8217; Iron Ore Operations (RTIO)","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"Locomotive Trip Services & Refuelling Facility Development Client: Rio Tinto Iron Ore (RTIO) Location: Cape Lambert, Western Australia Project Type: Industrial Fit\u2011Out \u2013 Critical Infrastructure Project Value: AUD $12 million Project Duration: June 2012 \u2013 July 2013 Strategic Objective Rio Tinto Iron Ore required a new, purpose\u2011built locomotive trip services\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":195,"url":"https:\/\/murrayslatter.me\/?page_id=195","url_meta":{"origin":592,"position":1},"title":"Rio Tinto &#8211; Fuel Management Systems","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"RTIO engaged our client to implement a Fuel management system to 176 locations throughout 16 sites in the RTIO suite of properties from Port Hedland to East and West sites. The Fuel management system was designed to capture every drop of the 2 billion litres of diesel that RTIO uses\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1295,"url":"https:\/\/murrayslatter.me\/?page_id=1295","url_meta":{"origin":592,"position":2},"title":"Rio Tinto","author":"Murray Slatter","date":"March 9, 2020","format":false,"excerpt":"","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":939,"url":"https:\/\/murrayslatter.me\/?page_id=939","url_meta":{"origin":592,"position":3},"title":"EMPOWERING EXCEPTIONAL MINING OUTCOMES","author":"Murray Slatter","date":"January 6, 2019","format":false,"excerpt":"For more than 20 years I have delivered exceptional outcomes for Local and International Miners, from BHP to Rio Tinto, PWCS to Newcrest and more, across all three services offerings. My expertise in the Mining sector is second to none, as we harness the power of effective collaboration and understanding\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Minning-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Minning-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Minning-Sector.jpg?fit=960%2C720&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Minning-Sector.jpg?fit=960%2C720&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4649,"url":"https:\/\/murrayslatter.me\/?page_id=4649","url_meta":{"origin":592,"position":4},"title":"Empowering Tax Regulation Compliance Yandi","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Iron Ore \u2013 Yandi Mine 500,000\u202fL Fuel Farm Installation, Control & Monitoring Client: BHPIO (BHP Iron Ore)Location: Yandi Mine, Pilbara, Western AustraliaProject Period: 2014Project Type: Capital Project \u2013 Industrial Process & Fuel InfrastructureSystem Scope: Bulk Fuel Storage, Distribution, Control & MonitoringRole: Head Contractor \u2013 Program Director Strategic Objective Yandi\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":130,"url":"https:\/\/murrayslatter.me\/?page_id=130","url_meta":{"origin":592,"position":5},"title":"IntelQ","author":"Murray Slatter","date":"January 21, 2017","format":false,"excerpt":"Qcuded is a multi-disciplinary project management professional services firm. We openly share ideas and drive best practice through open collaboration and communication with our customers, peers and market to \"ever increasingly sharpen the saw\". Intel is dedicated to sharing those ideas and collaborating openly with the community around us to\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=592"}],"version-history":[{"count":5,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/592\/revisions"}],"predecessor-version":[{"id":6210,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/592\/revisions\/6210"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4493"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}