{"id":4978,"date":"2025-01-08T14:57:52","date_gmt":"2025-01-08T03:57:52","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4978"},"modified":"2026-06-07T16:30:04","modified_gmt":"2026-06-07T06:30:04","slug":"barclays-1-church-hill-place-fitout","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4978","title":{"rendered":"Barclays 1 Church Hill Place Fitout"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Barclays Bank \u2013 1 Church Hill Place, Hong Kong | Multi\u2011Floor Fit\u2011Out &amp; Critical Infrastructure Integration<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Barclays Bank<br><strong>Location:<\/strong> 1 Church Hill Place, Hong Kong<br><strong>Project Type:<\/strong> Capital Project \u2013 Corporate Banking Fit\u2011Out<br><strong>Project Value:<\/strong> USD&nbsp;$7&nbsp;million<br><strong>Project Duration:<\/strong><em>Start: [Project Commencement]<\/em> \u2013 Finish: November&nbsp;2017<br><strong>Role:<\/strong> Program Leadership &amp; Delivery<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Barclays required a <strong>world\u2011class corporate workplace<\/strong> at 1 Church Hill Place\u2014one capable of supporting high\u2011intensity banking operations, executive leadership, and technology\u2011driven workflows at scale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective was to <strong>deliver a fully integrated fit\u2011out across 33 floors<\/strong>, incorporating resilient infrastructure, advanced technology systems, and flexible office environments\u2014while executing in parallel with <strong>shell\u2011and\u2011core base\u2011build construction<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This was a high\u2011stakes delivery environment, where <strong>time, reliability, and compliance<\/strong> were non\u2011negotiable.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project operated at the intersection of complexity, density, and consequence:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fit\u2011out works executed <strong>concurrently with shell\u2011and\u2011core construction<\/strong><\/li>\n\n\n\n<li>High concentration of critical systems including:\n<ul class=\"wp-block-list\">\n<li>Standby cooling<\/li>\n\n\n\n<li>UPS and power resilience<\/li>\n\n\n\n<li>Extensive structured data cabling<\/li>\n\n\n\n<li>Advanced fire detection and life\u2011safety systems<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Requirement for <strong>phased handovers across 33 floors<\/strong><\/li>\n\n\n\n<li>Tight timelines aligned to occupancy and operational readiness<\/li>\n\n\n\n<li>Multiple stakeholder groups across client, landlord, consultants, and contractors<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Failure in sequencing or coordination would have resulted in cascading delays and operational risk.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The engagement encompassed end\u2011to\u2011end delivery oversight, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Multi\u2011floor corporate fit\u2011out delivery<\/li>\n\n\n\n<li>Technology, AV, security, and infrastructure integration<\/li>\n\n\n\n<li>Demolition and reinstatement works<\/li>\n\n\n\n<li>Fire\u2011life safety and compliance coordination<\/li>\n\n\n\n<li>Phased handover planning and execution<\/li>\n\n\n\n<li>Quality assurance, defect management, and landlord approvals<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>phased, dependency\u2011led delivery model<\/strong> was applied\u2014designed to maintain certainty while operating inside an active construction environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Detailed Needs &amp; Interface Analysis:<\/strong> Early identification of technical, spatial, and sequencing constraints<\/li>\n\n\n\n<li><strong>Concurrent Construction Coordination:<\/strong> Tight alignment between shell\u2011and\u2011core works and fit\u2011out activities to eliminate clashes<\/li>\n\n\n\n<li><strong>Technology Integration Leadership:<\/strong> Close collaboration with Barclays\u2019 IT, AV, and security teams to ensure seamless system delivery<\/li>\n\n\n\n<li><strong>Staged Delivery Planning:<\/strong> Execution across three distinct phases to support progressive occupation<\/li>\n\n\n\n<li><strong>Compliance &amp; Readiness Control:<\/strong> Continuous validation against landlord, statutory, and operational requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The focus was not just delivery\u2014but <strong>predictable, risk\u2011controlled delivery at scale<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks requiring deliberate management included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Interface risk between base\u2011build and fit\u2011out contractors<\/li>\n\n\n\n<li>Technology commissioning dependencies across multiple floors<\/li>\n\n\n\n<li>Maintaining quality consistency across a large vertical footprint<\/li>\n\n\n\n<li>Schedule compression under fixed occupation milestones<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through disciplined sequencing, daily coordination, and proactive issue resolution.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Removal of existing furniture and redundant infrastructure<\/li>\n\n\n\n<li>Decommissioning and return of IT, AV, and security systems<\/li>\n\n\n\n<li>Demolition of partitions, ceilings, and obsolete services<\/li>\n\n\n\n<li>Concrete slab self\u2011levelling across multiple floors<\/li>\n\n\n\n<li>Electrical rewiring for power distribution and lighting<\/li>\n\n\n\n<li>Installation of new entrance doors, fire exits, and boundary walls<\/li>\n\n\n\n<li>Final finishes, painting, and compliance works<\/li>\n\n\n\n<li>Complete <strong>as\u2011built documentation<\/strong> approved by the landlord<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Each phase was delivered as a fully compliant, handover\u2011ready environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project achieved:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Successful delivery across 33 floors<\/strong>, completed in three defined phases<\/li>\n\n\n\n<li>All handovers completed <strong>on time<\/strong><\/li>\n\n\n\n<li>Full defect resolution and final client sign\u2011off<\/li>\n\n\n\n<li>Landlord approval of all reinstatement and fit\u2011out works<\/li>\n\n\n\n<li>A resilient, technology\u2011enabled workplace supporting Barclays\u2019 operations<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Barclays gained a <strong>high\u2011performance corporate environment<\/strong> delivered under tight constraints\u2014without compromise on quality or reliability.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Large\u2011Scale Fit\u2011Out Mastery:<\/strong> Proven delivery across dense, multi\u2011floor environments<\/li>\n\n\n\n<li><strong>Concurrent Construction Expertise:<\/strong> Fit\u2011out executed alongside shell\u2011and\u2011core works<\/li>\n\n\n\n<li><strong>Technology\u2011Ready Delivery:<\/strong> Infrastructure designed for operational resilience<\/li>\n\n\n\n<li><strong>Phased Control:<\/strong> Predictable handovers under compressed timelines<\/li>\n\n\n\n<li><strong>Governance Confidence:<\/strong> Delivery aligned with landlord, statutory, and client standards<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=4978\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Barclays Bank \u2013 1 Church Hill Place, Hong Kong | Multi\u2011Floor Fit\u2011Out &amp; Critical Infrastructure Integration Client: Barclays BankLocation: 1 Church Hill Place, Hong KongProject Type: Capital Project \u2013 Corporate Banking Fit\u2011OutProject Value: USD&nbsp;$7&nbsp;millionProject Duration:Start: [Project Commencement] \u2013 Finish: November&nbsp;2017Role: [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4979,"parent":0,"menu_order":25,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4978","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Barclays 1 Church Hill Place Fitout - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4978\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Barclays 1 Church Hill Place Fitout - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Barclays Bank \u2013 1 Church Hill Place, Hong Kong | Multi\u2011Floor Fit\u2011Out &amp; Critical Infrastructure Integration Client: Barclays BankLocation: 1 Church Hill Place, Hong KongProject Type: Capital Project \u2013 Corporate Banking Fit\u2011OutProject Value: USD&nbsp;$7&nbsp;millionProject Duration:Start: [Project Commencement] \u2013 Finish: November&nbsp;2017Role: [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4978\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-07T06:30:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"671\" \/>\n\t<meta property=\"og:image:height\" content=\"384\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978\",\"name\":\"Barclays 1 Church Hill Place Fitout - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1\",\"datePublished\":\"2025-01-08T03:57:52+00:00\",\"dateModified\":\"2026-06-07T06:30:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1\",\"width\":671,\"height\":384},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4978#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Barclays 1 Church Hill Place Fitout\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Barclays 1 Church Hill Place Fitout - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4978","og_locale":"en_US","og_type":"article","og_title":"Barclays 1 Church Hill Place Fitout - Murray Slatter","og_description":"Barclays Bank \u2013 1 Church Hill Place, Hong Kong | Multi\u2011Floor Fit\u2011Out &amp; Critical Infrastructure Integration Client: Barclays BankLocation: 1 Church Hill Place, Hong KongProject Type: Capital Project \u2013 Corporate Banking Fit\u2011OutProject Value: USD&nbsp;$7&nbsp;millionProject Duration:Start: [Project Commencement] \u2013 Finish: November&nbsp;2017Role: [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4978","og_site_name":"Murray Slatter","article_modified_time":"2026-06-07T06:30:04+00:00","og_image":[{"width":671,"height":384,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4978","url":"https:\/\/murrayslatter.me\/?page_id=4978","name":"Barclays 1 Church Hill Place Fitout - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4978#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4978#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1","datePublished":"2025-01-08T03:57:52+00:00","dateModified":"2026-06-07T06:30:04+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4978#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4978"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4978#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1","width":671,"height":384},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4978#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Barclays 1 Church Hill Place Fitout"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4645,"url":"https:\/\/murrayslatter.me\/?page_id=4645","url_meta":{"origin":4978,"position":0},"title":"Empowering Banking Excellence","author":"Murray Slatter","date":"January 23, 2025","format":false,"excerpt":"Barclays Bank \u2013 Marina Bay Financial Centre (MBFC), Level\u00a056 Fit\u2011Out Client: Barclays BankLocation: Marina Bay Financial Centre (MBFC), SingaporeProject Type: Capital Project \u2013 REIT \u2013 Mission\u2011Critical Corporate Fit\u2011OutProject Value: SGD\u00a0$27.9\u00a0millionProject Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective Barclays required a high\u2011performance, multi\u2011functional operational floor within Marina Bay Financial\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp?fit=400%2C350&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":929,"url":"https:\/\/murrayslatter.me\/?page_id=929","url_meta":{"origin":4978,"position":1},"title":"EMPOWERING EXCEPTIONAL CORPORATE OUTCOMES","author":"Murray Slatter","date":"January 6, 2019","format":false,"excerpt":"For more than 30 years I have delivered exceptional outcomes for Local, National and International corporate', from Banks to Data Centres to Diversified Institutions, across all three services offerings. My expertise in the Corporate sector is second to none, as we harness the power of effective collaboration and understanding the\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Corporate-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Corporate-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Corporate-Sector.jpg?fit=960%2C720&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Corporate-Sector.jpg?fit=960%2C720&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":759,"url":"https:\/\/murrayslatter.me\/?page_id=759","url_meta":{"origin":4978,"position":2},"title":"Projects","author":"Murray Slatter","date":"October 13, 2018","format":false,"excerpt":"Over 25 years we have delivered more than 1XXX of projects in 52 countries across 22 industries. We have a sample of those projects across each industry below: 1. Airports, Ports, Rail Empowering safer Asian and International travel http:\/\/www.qfactor.com.au\/214-2\/ 2. Banking and Finance Empowering Barclays Asian business for growth 3.\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4974,"url":"https:\/\/murrayslatter.me\/?page_id=4974","url_meta":{"origin":4978,"position":3},"title":"Citibank 1 Bay East, Hong Kong \u2013 High\u2011Performance Workplace Transformation","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"Client: Citibank High\u2011Performance Workplace TransformationLocation: 1 Bay East, Hong KongProject Type: Capital Project \u2013 Corporate Workplace Fit\u2011OutProject Value: USD\u00a0$12\u00a0millionProject Duration: 2017Role: Program Leadership & Delivery Strategic Objective Citibank\u2019s global workplace strategy is anchored in flexibility, collaboration, wellbeing, and sustainability. In Hong Kong\u2014one of the world\u2019s most demanding commercial real\u2011estate markets\u2014Citi\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":796,"url":"https:\/\/murrayslatter.me\/?page_id=796","url_meta":{"origin":4978,"position":4},"title":"Banking &#8211; Empowering CSFB&#8217;s Australian business for growth","author":"Murray Slatter","date":"March 25, 2019","format":false,"excerpt":"Client: CSFBLocation: Corporate Headquarters & Disaster Recovery FacilityProject Type: Business Systems & Building Services Compliance ProgramProject Value: Confidential (Program\u2011scale engagement)Project Duration: 2005-2006Role: Program Management & Client\u2011Side Delivery Leadership Strategic Objective CSFB leadership identified the need to validate and future\u2011proof the ICT, Electrical, and Security systems supporting its headquarters (HQ) and\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/65b7c16f.jpg?fit=800%2C600&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/65b7c16f.jpg?fit=800%2C600&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/65b7c16f.jpg?fit=800%2C600&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/65b7c16f.jpg?fit=800%2C600&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":243,"url":"https:\/\/murrayslatter.me\/?page_id=243","url_meta":{"origin":4978,"position":5},"title":"Empowering the Brightest minds lead the future &#8211; Charles Sturt Uni","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"Client: University (HUBCentral)Location: New South Wales, AustraliaProject Type: Capital Upgrade \u2013 Live Operational EnvironmentProject Value: $3.5mProject Duration:2014Role: Program Leadership & Project Management Strategic Objective HUBCentral is a highly utilised, multi\u2011functional campus facility supporting students, staff, and visitors. As the building aged, its functionality, atmosphere, and building services no longer supported\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4978"}],"version-history":[{"count":2,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4978\/revisions"}],"predecessor-version":[{"id":6247,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4978\/revisions\/6247"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4979"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}