{"id":4974,"date":"2025-01-08T14:50:52","date_gmt":"2025-01-08T03:50:52","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4974"},"modified":"2025-01-08T14:52:53","modified_gmt":"2025-01-08T03:52:53","slug":"citibank-1-bay-east-hong-kong","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4974","title":{"rendered":"Citibank 1 Bay East Hong Kong"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Citibank 1 Bay East Fitout project transformed workplace design in Hong Kong, delivering flexible, sustainable workspaces with advanced technology integration. Achieving WELL, RESET, and LEED Platinum certifications, the project set a global benchmark for environmental and operational excellence in corporate office design.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td><strong>Citibank 1 Bay East Fitout<\/strong><\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>Citibank<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Fitout<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>USD $12 million<\/td><\/tr><tr><td><strong>Project Time line<\/strong><\/td><td>2017 &#8211; 2017<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To deliver a state-of-the-art, flexible, and sustainable workspace aligned with Citi\u2019s global office strategy, enhancing collaboration, operational efficiency, and environmental responsibility while achieving globally recognized certifications.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>Citi required an innovative workspace solution that addressed operational, spatial, and technological needs. The project had to include flexible workspaces, collaborative zones, robust integrated Wi-Fi and AV systems, increased meeting room availability, and alignment with Citi&#8217;s global branding and sustainability goals.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>Conducted extensive discovery workshops to align Citi\u2019s strategic objectives with spatial and operational requirements. Managed stakeholder alignment and expectations across various teams. Collaborated with architects and contractors to ensure the design reflected Citi\u2019s vision and global standards. Oversaw implementation and ensured compliance with WELL, LEED, and RESET certifications.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Meet and Greet Floor<br>&#8211; Community Floor<br>&#8211; Work floor with breakout areas<br>&#8211; Citi Connect office strategy<br>&#8211; First WELL Silver Certification in Hong Kong<br>&#8211; First RESET Certification in Hong Kong<br>&#8211; Largest WELL Certification for new and existing interiors globally<br>&#8211; LEED v2009 Platinum Certification<\/td><\/tr><tr><td><strong>Risks and Challenges<\/strong><\/td><td>&#8211; Coordinating multiple stakeholders with diverse priorities<br>&#8211; Ensuring adherence to international certification standards (WELL, RESET, LEED)<br>&#8211; Aligning local execution with global corporate expectations<br>&#8211; Tight delivery timelines requiring efficient resource management<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>Delivered the project on time, within scope, and aligned with Citi\u2019s strategic objectives. Achieved WELL Silver, RESET, and LEED Platinum certifications. Supported architectural submissions to international awarding agencies, securing global recognition for the project.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; Expertise in delivering high-performance, sustainable workspaces<br>&#8211; Strong stakeholder engagement and alignment<br>&#8211; Proven ability to integrate complex systems and certifications seamlessly<br>&#8211; Strategic focus on operational efficiency and flexible workspace solutions<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Citibank 1 Bay East Fitout project transformed workplace design in Hong Kong, delivering flexible, sustainable workspaces with advanced technology integration. Achieving WELL, RESET, and LEED Platinum certifications, the project set a global benchmark for environmental and operational excellence in [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4975,"parent":0,"menu_order":25,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4974","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Citibank 1 Bay East Hong Kong - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4974\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Citibank 1 Bay East Hong Kong - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"The Citibank 1 Bay East Fitout project transformed workplace design in Hong Kong, delivering flexible, sustainable workspaces with advanced technology integration. Achieving WELL, RESET, and LEED Platinum certifications, the project set a global benchmark for environmental and operational excellence in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4974\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-08T03:52:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Citibank-HK.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"306\" \/>\n\t<meta property=\"og:image:height\" content=\"179\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974\",\"name\":\"Citibank 1 Bay East Hong Kong - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Citibank-HK.jpg?fit=306%2C179&ssl=1\",\"datePublished\":\"2025-01-08T03:50:52+00:00\",\"dateModified\":\"2025-01-08T03:52:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Citibank-HK.jpg?fit=306%2C179&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Citibank-HK.jpg?fit=306%2C179&ssl=1\",\"width\":306,\"height\":179},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4974#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Citibank 1 Bay East Hong Kong\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Citibank 1 Bay East Hong Kong - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4974","og_locale":"en_US","og_type":"article","og_title":"Citibank 1 Bay East Hong Kong - Murray Slatter","og_description":"The Citibank 1 Bay East Fitout project transformed workplace design in Hong Kong, delivering flexible, sustainable workspaces with advanced technology integration. Achieving WELL, RESET, and LEED Platinum certifications, the project set a global benchmark for environmental and operational excellence in [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4974","og_site_name":"Murray Slatter","article_modified_time":"2025-01-08T03:52:53+00:00","og_image":[{"width":306,"height":179,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Citibank-HK.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4974","url":"https:\/\/murrayslatter.me\/?page_id=4974","name":"Citibank 1 Bay East Hong Kong - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4974#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4974#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Citibank-HK.jpg?fit=306%2C179&ssl=1","datePublished":"2025-01-08T03:50:52+00:00","dateModified":"2025-01-08T03:52:53+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4974#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4974"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4974#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Citibank-HK.jpg?fit=306%2C179&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Citibank-HK.jpg?fit=306%2C179&ssl=1","width":306,"height":179},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4974#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Citibank 1 Bay East Hong Kong"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4645,"url":"https:\/\/murrayslatter.me\/?page_id=4645","url_meta":{"origin":4974,"position":0},"title":"Empowering Banking Excellence","author":"Murray Slatter","date":"January 23, 2025","format":false,"excerpt":"Singapore MBFC Level 6 \u2013 Floor Fit-Out 1) Project NameSingapore MBFC Level 6 \u2013 Floor Fit-Out2) Client CompanyBarclays3) Project TypeCapital Project \u2013 Renovation (REIT)4) Project Value$27,909,0005) Project Start and Finish2017 \u2013 20176) Strategic ObjectiveTo deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs while enhancing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp?fit=400%2C350&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":282,"url":"https:\/\/murrayslatter.me\/?page_id=282","url_meta":{"origin":4974,"position":1},"title":"Empowering Thousands of industries through Industrial Salt","author":"Murray Slatter","date":"February 26, 2017","format":false,"excerpt":"To design, fabricate, deliver, and commission a site\u2011specific, robotics\u2011enabled Salt Shiploader that met strict operational efficiency, reliability, and cost benchmarks \u2014 all within a compressed nine\u2011month delivery window and under challenging logistical conditions. ItemDetailClientMitsu (Shark Bay Salt)Project NameShark Bay Salt ShiploaderProject TypeCapital Project \u2013 Industrial ProcessProject Value$5.5 millionProject Duration2009 (9\u2011month\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/img_0291.jpg?fit=860%2C520&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/img_0291.jpg?fit=860%2C520&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/img_0291.jpg?fit=860%2C520&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/img_0291.jpg?fit=860%2C520&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4661,"url":"https:\/\/murrayslatter.me\/?page_id=4661","url_meta":{"origin":4974,"position":2},"title":"Empowering Enviromental State Affairs","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"British High Commissioner's House Air Conditioning Upgrades 1) Project NameBritish High Commissioner's House Air Conditioning Upgrades2) Client CompanyBritish Government - Foreign Commonwealth Office - High Commission3) Project TypeCapital Project \u2013 REIT \u2013 Renovation4) Project Value$405,0005) Project Start and Finish2014 \u2013 20146) Strategic ObjectiveTo upgrade and modernize the air conditioning systems\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4978,"url":"https:\/\/murrayslatter.me\/?page_id=4978","url_meta":{"origin":4974,"position":3},"title":"Barclays 1 Church Hill Place Fitout","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"The Barclays 1 Church Hill Place Fitout project involved delivering a world-class workspace across 33 floors, integrating advanced technology, sustainable infrastructure, and flexible office environments. Executed seamlessly alongside shell and core construction, the project met stringent timelines and operational requirements, exceeding client expectations. Project NameBarclays 1 Church Hill Place FitoutClient\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":592,"url":"https:\/\/murrayslatter.me\/?page_id=592","url_meta":{"origin":4974,"position":4},"title":"RTIO &#8211; HCO Fuel Farm","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, bund installation, water treatment\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4652,"url":"https:\/\/murrayslatter.me\/?page_id=4652","url_meta":{"origin":4974,"position":5},"title":"Empowering Tax Regulation Compliance BMA","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$3,3m Project Start and Finish2013 \u2013 2013Strategic ObjectiveTo design, install, and commission an upgraded fuel storage,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4974","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4974"}],"version-history":[{"count":1,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4974\/revisions"}],"predecessor-version":[{"id":4976,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4974\/revisions\/4976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4975"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}