{"id":4674,"date":"2024-12-23T23:39:27","date_gmt":"2024-12-23T12:39:27","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4674"},"modified":"2026-06-07T15:36:28","modified_gmt":"2026-06-07T05:36:28","slug":"empowering-great-sustainability-outcomes","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4674","title":{"rendered":"Empowering great Sustainability Outcomes"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">British High Commissioner\u2019s Residence, Wellington \u2013 Hazardous Materials Removal &amp; Renovation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)<br><strong>Location:<\/strong> Wellington, New Zealand<br><strong>Project Type:<\/strong> Capital Project \u2013 Major Alterations &amp; Additions (Residential \/ Diplomatic Asset)<br><strong>Project Value:<\/strong> AUD $1.56 million<br><strong>Project Duration:<\/strong> January 2017 \u2013 September 2017<br><strong>Role:<\/strong> Head Contractor \u2013 Program Director<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The British High Commissioner\u2019s residence in Wellington is a <strong>sovereign diplomatic asset<\/strong>\u2014a State property representing the British Government and people.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following the identification of <strong>banned construction materials<\/strong> within the residence, including <strong>lead\u2011based paint and asbestos<\/strong>, the mandate from the British Government was unequivocal:<br><strong>remove all prohibited materials from British Government properties and restore safe, compliant occupation.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective was to <strong>eliminate all hazardous materials<\/strong>, achieve full compliance with <strong>both British and New Zealand regulations<\/strong>, and return the residence to full operational readiness\u2014while preserving its function, dignity, and representational role.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sustainable construction practices were not widely adopted at the time the residence was originally constructed. Over time, this resulted in legacy materials now considered hazardous.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key challenges included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Presence of <strong>lead and asbestos<\/strong> within an actively occupied diplomatic residence<\/li>\n\n\n\n<li>Zero tolerance for exposure risk to occupants, staff, or contractors<\/li>\n\n\n\n<li>Requirement to comply simultaneously with <strong>British Government standards<\/strong> and <strong>New Zealand regulatory frameworks<\/strong><\/li>\n\n\n\n<li>Delivery within the constraints of diplomatic schedules and security protocols<\/li>\n\n\n\n<li>Preservation of the architectural character and functional integrity of a high\u2011profile State property<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Any misstep would have carried <strong>health, reputational, and diplomatic consequences<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project encompassed full investigation, remediation, and restoration, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Comprehensive hazardous materials identification and testing<\/li>\n\n\n\n<li>Lead\u2011based paint and asbestos removal and disposal<\/li>\n\n\n\n<li>Structural rectification and reinstatement works<\/li>\n\n\n\n<li>Building services upgrades to improve safety and air quality<\/li>\n\n\n\n<li>Regulatory certification and safety documentation<\/li>\n\n\n\n<li>Full handover to diplomatic operations<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>risk\u2011elimination, compliance\u2011led delivery model<\/strong> was applied\u2014designed specifically for high\u2011consequence, sovereign assets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Detailed Site Assessment:<\/strong> Identification of all contamination zones and risk pathways<\/li>\n\n\n\n<li><strong>Specialist Hazard Collaboration:<\/strong> Engagement with accredited hazardous\u2011materials consultants and testers<\/li>\n\n\n\n<li><strong>Phased Remediation Strategy:<\/strong> Sequencing works to ensure zero exposure risk at all times<\/li>\n\n\n\n<li><strong>Stakeholder &amp; Diplomatic Alignment:<\/strong> Continuous engagement with British Government representatives to align scope, timing, and access<\/li>\n\n\n\n<li><strong>Dual\u2011Jurisdiction Compliance:<\/strong> Management of parallel approval pathways under British and New Zealand regulations<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">I led the delivery as <strong>Head Contractor Program Director<\/strong>, providing single\u2011point accountability for safety, compliance, and execution.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks requiring deliberate management included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ensuring <strong>zero exposure<\/strong> to hazardous materials for occupants and workers<\/li>\n\n\n\n<li>Managing decontamination within a live diplomatic environment<\/li>\n\n\n\n<li>Aligning dual regulatory regimes without conflict or delay<\/li>\n\n\n\n<li>Maintaining programme certainty under sensitive scheduling constraints<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through disciplined planning, certified removal processes, and uncompromising safety governance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Complete removal and certified disposal of all lead\u2011based paint and asbestos\u2011containing materials<\/li>\n\n\n\n<li>Structural reinstatement and renovation of affected areas<\/li>\n\n\n\n<li>Installation of upgraded HVAC systems to improve air quality and safety<\/li>\n\n\n\n<li>Comprehensive health, safety, and compliance documentation<\/li>\n\n\n\n<li>Full operational handover supported by safety certification<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery &amp; Safety Performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>~16,000 work hours<\/strong><\/li>\n\n\n\n<li><strong>Zero Lost Time Injuries (LTI)<\/strong><\/li>\n\n\n\n<li><strong>One First Aid Incident (FAI)<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This outcome reflected disciplined risk control in a high\u2011sensitivity environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Achieved <strong>full compliance<\/strong> with both British and New Zealand safety regulations<\/li>\n\n\n\n<li>Successfully eliminated all banned and hazardous materials from the residence<\/li>\n\n\n\n<li>Restored the property to safe, fully operational diplomatic use<\/li>\n\n\n\n<li>Preserved the aesthetic, functional, and representational integrity of the residence<\/li>\n\n\n\n<li>Delivered on time and within approved scope and budget<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The British Government regained a <strong>safe, compliant, sovereign residence<\/strong>\u2014fit for long\u2011term occupation and representation.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery Team<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Design<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Lead Designer<\/li>\n\n\n\n<li>2 \u00d7 Hazardous Materials Consultants \/ Testers<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Construction<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Project Manager<\/li>\n\n\n\n<li>1 \u00d7 Contracts Manager<\/li>\n\n\n\n<li>1 \u00d7 Quality Manager<\/li>\n\n\n\n<li>1 \u00d7 Safety Manager<\/li>\n\n\n\n<li>Lead contamination removal contractor<\/li>\n\n\n\n<li>Licensed asbestos removal contractor<\/li>\n\n\n\n<li>Painting contractor<\/li>\n\n\n\n<li>Carpentry contractor<\/li>\n\n\n\n<li>Scaffolding contractor<\/li>\n\n\n\n<li>Carpet and finishes contractor<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Sovereign Asset Experience:<\/strong> Delivery under diplomatic and government scrutiny<\/li>\n\n\n\n<li><strong>Dual\u2011Compliance Mastery:<\/strong> British Government and New Zealand regulatory alignment<\/li>\n\n\n\n<li><strong>Zero\u2011Exposure Execution:<\/strong> Health risk eliminated at source<\/li>\n\n\n\n<li><strong>Respectful Restoration:<\/strong> Modern compliance delivered without compromising dignity<\/li>\n\n\n\n<li><strong>Governance Confidence:<\/strong> Transparent reporting and certified outcomes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=4674\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>British High Commissioner\u2019s Residence, Wellington \u2013 Hazardous Materials Removal &amp; Renovation Client: British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations &amp; Additions (Residential \/ Diplomatic Asset)Project Value: AUD $1.56 millionProject [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4677,"parent":0,"menu_order":123,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4674","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering great Sustainability Outcomes - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4674\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering great Sustainability Outcomes - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"British High Commissioner\u2019s Residence, Wellington \u2013 Hazardous Materials Removal &amp; Renovation Client: British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations &amp; Additions (Residential \/ Diplomatic Asset)Project Value: AUD $1.56 millionProject [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4674\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-07T05:36:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674\",\"name\":\"Empowering great Sustainability Outcomes - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Nz-High-Commissioners-home.jpg?fit=1600%2C1067&ssl=1\",\"datePublished\":\"2024-12-23T12:39:27+00:00\",\"dateModified\":\"2026-06-07T05:36:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Nz-High-Commissioners-home.jpg?fit=1600%2C1067&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Nz-High-Commissioners-home.jpg?fit=1600%2C1067&ssl=1\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4674#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering great Sustainability Outcomes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering great Sustainability Outcomes - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4674","og_locale":"en_US","og_type":"article","og_title":"Empowering great Sustainability Outcomes - Murray Slatter","og_description":"British High Commissioner\u2019s Residence, Wellington \u2013 Hazardous Materials Removal &amp; Renovation Client: British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations &amp; Additions (Residential \/ Diplomatic Asset)Project Value: AUD $1.56 millionProject [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4674","og_site_name":"Murray Slatter","article_modified_time":"2026-06-07T05:36:28+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4674","url":"https:\/\/murrayslatter.me\/?page_id=4674","name":"Empowering great Sustainability Outcomes - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4674#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4674#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1600%2C1067&ssl=1","datePublished":"2024-12-23T12:39:27+00:00","dateModified":"2026-06-07T05:36:28+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4674#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4674"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4674#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1600%2C1067&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1600%2C1067&ssl=1","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4674#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering great Sustainability Outcomes"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4673,"url":"https:\/\/murrayslatter.me\/?page_id=4673","url_meta":{"origin":4674,"position":0},"title":"Empowering State Diplomacy","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioner\u2019s Residence, Wellington \u2013 Seismic Repairs & Structural Strengthening Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations & Additions (Residential \/ Diplomatic Asset)Project Value: AUD $698,080Project Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The British\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4669,"url":"https:\/\/murrayslatter.me\/?page_id=4669","url_meta":{"origin":4674,"position":1},"title":"Empowering Deplomacy and Consular Services","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commission, Wellington \u2013 Post\u2011Earthquake Rebuild & Structural Rectification Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 REIT \u2013 Post\u2011Disaster Rebuild & RenovationProject Value: AUD $3.98 millionProject Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The British High Commission\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4982,"url":"https:\/\/murrayslatter.me\/?page_id=4982","url_meta":{"origin":4674,"position":2},"title":"Consular Generals Home Vaucluse Renovation","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"British High Commission (Consular), Sydney \u2013 Vaucluse Residence Renovation Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Vaucluse, Sydney, NSWProject Type: Capital Project \u2013 REIT \u2013 Heritage Renovation (Residential \/ Diplomatic Asset)Project Value: USD\u00a0$1.97\u00a0millionProject Duration: 2015Role: Program Leadership & Delivery (Head Contractor \/ Client\u2011Side Program Director) Strategic Objective\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4661,"url":"https:\/\/murrayslatter.me\/?page_id=4661","url_meta":{"origin":4674,"position":3},"title":"Empowering Enviromental State Affairs","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"British High Commissioner's House Air Conditioning Upgrades 1) Project NameBritish High Commissioner's House Air Conditioning Upgrades2) Client CompanyBritish Government - Foreign Commonwealth Office - High Commission3) Project TypeCapital Project \u2013 REIT \u2013 Renovation4) Project Value$405,0005) Project Start and Finish2014 \u2013 20146) Strategic ObjectiveTo upgrade and modernize the air conditioning systems\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6260,"url":"https:\/\/murrayslatter.me\/?page_id=6260","url_meta":{"origin":4674,"position":4},"title":"Empowering Offgrid Embassy Services","author":"Murray Slatter","date":"June 9, 2026","format":false,"excerpt":"Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Canberra, AustraliaProject Period: 2016Project Type: Capital Project \u2013 Sovereign Asset Infrastructure RenewalSystem Scope: Heating, Cooling, Energy Generation & Building ControlsRole: Program Leadership \u2013 Design, Construction & Operational Transition Strategic Objective The British High Commission building in Canberra is a sovereign\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4665,"url":"https:\/\/murrayslatter.me\/?page_id=4665","url_meta":{"origin":4674,"position":5},"title":"Empowering Enviromental Consular Services","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Canberra, AustraliaProject Period: 2016Project Type: Capital Project \u2013 Sovereign Asset Infrastructure RenewalSystem Scope: Heating, Cooling, Energy Generation & Building ControlsRole: Program Leadership \u2013 Design, Construction & Operational Transition Strategic Objective The British High Commission building in Canberra is a sovereign\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4674"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4674\/revisions"}],"predecessor-version":[{"id":6235,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4674\/revisions\/6235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4677"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}