{"id":4673,"date":"2024-12-23T23:49:01","date_gmt":"2024-12-23T12:49:01","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4673"},"modified":"2024-12-23T23:49:48","modified_gmt":"2024-12-23T12:49:48","slug":"empowering-state-diplomacy","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4673","title":{"rendered":"Empowering State Diplomacy"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">British High Commissioners Home Wellington Seismic Repairs <\/h2>\n\n\n\n<p>Following the 8.1 level earthquake in Wellington New Zealand, we conducted some structural inspections to this historical building and provided the Structural Integratity inspection and recommendations from repairs. Our repairs were undertaken to strengthen the building and upgrade the civils\/structurals to acheive the 2012 implemented seismic code updates following the Christchurch earthquake. <\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td>British High Commissioners Home Wellington Seismic Repairs<\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>British Government &#8211; Foreign Commonwealth Office &#8211; High Commission<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Capital Project &#8211; Major Alts\/Adds &#8211; Residential<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>$698,080<\/td><\/tr><tr><td><strong>Project Start and Finish<\/strong><\/td><td>2017 &#8211; 2017<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To ensure the structural integrity, safety, and long-term resilience of the British High Commissioner&#8217;s home in Wellington through targeted seismic repairs and compliance with local and international building codes.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>The residence required seismic strengthening and repairs following earthquake damage. The project had to ensure compliance with both New Zealand&#8217;s strict seismic building standards and the British Foreign Commonwealth Office\u2019s operational and aesthetic requirements while minimizing disruption to the residence.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>Conducted an extensive seismic assessment of the residence, collaborated with structural and heritage specialists, and developed a phased repair and strengthening plan. Focused on aligning international standards with local regulatory requirements and maintained open communication with stakeholders throughout the project.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Structural assessment and seismic retrofitting<br>&#8211; Repair and reinforcement of critical load-bearing structures<br>&#8211; Integration of heritage preservation practices in structural upgrades<br>&#8211; Compliance with British and New Zealand building codes<br>&#8211; Full operational handover documentation and maintenance guidelines<\/td><\/tr><tr><td><strong>Risks and Challenges<\/strong><\/td><td>&#8211; Balancing modern seismic requirements with the preservation of heritage elements<br>&#8211; Navigating dual compliance standards between British and New Zealand regulatory frameworks<br>&#8211; Ensuring project execution within an occupied residential setting with minimal disruption<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>Successfully delivered a structurally reinforced and seismically compliant residence for the British High Commissioner. The project ensured long-term safety and operational resilience while preserving the cultural and historical significance of the property.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; Expertise in managing heritage-listed seismic strengthening projects<br>&#8211; Effective stakeholder engagement ensuring alignment with dual compliance requirements<br>&#8211; Integration of modern structural solutions while preserving heritage aesthetics<br>&#8211; Timely delivery with minimal disruption to residential occupancy<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Check out more about the industries I have served : <a href=\"https:\/\/murrayslatter.me\/?page_id=717\">Here<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">I led the development and execution of the project as Head Contractor Program Director\/delivery team.<\/h4>\n\n\n\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Lead designer<\/li>\n\n\n\n<li>1 x Civil Engineer<\/li>\n\n\n\n<li>1 x Structural Engineer<\/li>\n<\/ul>\n\n\n\n<p><strong>Construction <\/strong>for the Construction project the team will consist of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Project Manager<\/li>\n\n\n\n<li>1 x Construction Engineer<\/li>\n\n\n\n<li>1 x Contracts Manager<\/li>\n\n\n\n<li>1 x Quality Manager<\/li>\n\n\n\n<li>1 x Safety Manager<\/li>\n\n\n\n<li>1 x Structural contractors<\/li>\n\n\n\n<li>1 x Civil Stablisation Contractors<\/li>\n<\/ul>\n\n\n\n<p>Project was completed with 2,000 hrs with ZERO LTI and 0 x FAI<\/p>\n","protected":false},"excerpt":{"rendered":"<p>British High Commissioners Home Wellington Seismic Repairs Following the 8.1 level earthquake in Wellington New Zealand, we conducted some structural inspections to this historical building and provided the Structural Integratity inspection and recommendations from repairs. Our repairs were undertaken to [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4682,"parent":0,"menu_order":18,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4673","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering State Diplomacy - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4673\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering State Diplomacy - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"British High Commissioners Home Wellington Seismic Repairs Following the 8.1 level earthquake in Wellington New Zealand, we conducted some structural inspections to this historical building and provided the Structural Integratity inspection and recommendations from repairs. Our repairs were undertaken to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4673\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-23T12:49:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1260\" \/>\n\t<meta property=\"og:image:height\" content=\"780\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673\",\"name\":\"Empowering State Diplomacy - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Nz-High-Commissioners-home-Homewood.png?fit=1260%2C780&ssl=1\",\"datePublished\":\"2024-12-23T12:49:01+00:00\",\"dateModified\":\"2024-12-23T12:49:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Nz-High-Commissioners-home-Homewood.png?fit=1260%2C780&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Nz-High-Commissioners-home-Homewood.png?fit=1260%2C780&ssl=1\",\"width\":1260,\"height\":780},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4673#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering State Diplomacy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering State Diplomacy - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4673","og_locale":"en_US","og_type":"article","og_title":"Empowering State Diplomacy - Murray Slatter","og_description":"British High Commissioners Home Wellington Seismic Repairs Following the 8.1 level earthquake in Wellington New Zealand, we conducted some structural inspections to this historical building and provided the Structural Integratity inspection and recommendations from repairs. Our repairs were undertaken to [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4673","og_site_name":"Murray Slatter","article_modified_time":"2024-12-23T12:49:48+00:00","og_image":[{"width":1260,"height":780,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4673","url":"https:\/\/murrayslatter.me\/?page_id=4673","name":"Empowering State Diplomacy - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4673#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4673#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1260%2C780&ssl=1","datePublished":"2024-12-23T12:49:01+00:00","dateModified":"2024-12-23T12:49:48+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4673#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4673"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4673#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1260%2C780&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1260%2C780&ssl=1","width":1260,"height":780},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4673#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering State Diplomacy"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4669,"url":"https:\/\/murrayslatter.me\/?page_id=4669","url_meta":{"origin":4673,"position":0},"title":"Empowering Deplomacy and Consular Services","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commission - Wellington Rebuild after Earthquake Following the 8.1 magnitude earthquake in Wellington New Zealand where by several buildings near the epicentre in downtown Wellington were damanged, The British Embassy was evacuated and condemed due to the structural damage. My team conducted the structural assessment, provide the repair\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4674,"url":"https:\/\/murrayslatter.me\/?page_id=4674","url_meta":{"origin":4673,"position":1},"title":"Empowering great Sustainability Outcomes","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioners Wellington Decontamination\/Renovation (Lead\/Asbestos) Sustainable construction practices may not have been as prominant in earlier generations of construction (even in New Zealand) however with the discovery of banned contaminants within this Property and given that it is the High Commissioners Home in Wellington, a Showcase State property of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4665,"url":"https:\/\/murrayslatter.me\/?page_id=4665","url_meta":{"origin":4673,"position":2},"title":"Empowering Enviromental Consular Services","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"British High Commission Whole Building Heating and Cooling Construction Project NameBritish High Commission Whole Building Heating and Cooling ConstructionClient CompanyBritish Government - Foreign Commonwealth Office - High CommissionProject TypeCapital Project \u2013 REIT \u2013 RenovationProject Value$1,810,000Project Start and Finish2015 \u2013 2015Strategic ObjectiveTo modernize and optimize the heating and cooling infrastructure of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4657,"url":"https:\/\/murrayslatter.me\/?page_id=4657","url_meta":{"origin":4673,"position":3},"title":"Empowering Safer Industrial Production","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BOC Penrose Acetylene Plant Structural Rectifications and Roof Rectifications The BOC Penrose Acetylene Plant Structural and Roof Rectifications project demanded exceptional precision in design, meticulous project planning, and flawless execution. Acetylene manufacturing is inherently high-risk due to the gas's volatile and flammable nature, requiring strict adherence to safety protocols, robust\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4818,"url":"https:\/\/murrayslatter.me\/?page_id=4818","url_meta":{"origin":4673,"position":4},"title":"Thickners and Clarifiers &#8211; Clarifying designs","author":"Murray Slatter","date":"December 29, 2024","format":false,"excerpt":"Collaborating with Delkor, we provided expert design peer reviews, performance assessments, and failure mode analyses for 8m, 12m, and 16m thickeners and clarifiers. Our approach ensured optimal efficiency, structural integrity, and seamless manufacturing support, delivering reliable solutions tailored to meet stringent operational and environmental requirements. Project NameDelkor Thickener and Clarifiers\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Delkor2.png?fit=527%2C517&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Delkor2.png?fit=527%2C517&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Delkor2.png?fit=527%2C517&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":278,"url":"https:\/\/murrayslatter.me\/?page_id=278","url_meta":{"origin":4673,"position":5},"title":"Empowering Faltering Nations back to Prosperity","author":"Murray Slatter","date":"February 26, 2017","format":false,"excerpt":"Sierra Leone Ship loading facility The Pepel Transhipment Facility Upgrade and Rebirth project exemplifies innovation, precision, and resilience in delivering industrial infrastructure solutions under extreme constraints. Tasked with retrofitting a long-abandoned transshipment facility in Sierra Leone, Qfactor overcame logistical, structural, and operational challenges to deliver a fully functional system within\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4673"}],"version-history":[{"count":1,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4673\/revisions"}],"predecessor-version":[{"id":4683,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4673\/revisions\/4683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4682"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}