{"id":4669,"date":"2024-12-23T23:58:00","date_gmt":"2024-12-23T12:58:00","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4669"},"modified":"2026-06-07T16:19:22","modified_gmt":"2026-06-07T06:19:22","slug":"empowering-deplomacy-and-consular-services","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4669","title":{"rendered":"Empowering Deplomacy and Consular Services"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">British High Commission, Wellington \u2013 Post\u2011Earthquake Rebuild &amp; Structural Rectification<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)<br><strong>Location:<\/strong> Wellington, New Zealand<br><strong>Project Type:<\/strong> Capital Project \u2013 REIT \u2013 Post\u2011Disaster Rebuild &amp; Renovation<br><strong>Project Value:<\/strong> AUD $3.98 million<br><strong>Project Duration:<\/strong> 2017<br><strong>Role:<\/strong> Head Contractor \u2013 Program Director<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The British High Commission in Wellington is a <strong>sovereign diplomatic facility<\/strong>, representing the British Government and serving as a critical centre for diplomatic, consular, and governmental operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following a <strong>magnitude 8.1 earthquake<\/strong> impacting central Wellington, several buildings near the epicentre sustained significant structural damage. The British High Commission was <strong>evacuated and condemned<\/strong> due to the extent of the damage and the uncertainty around structural safety.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective was to <strong>assess, repair, and rebuild the High Commission<\/strong>, restoring it to full operational readiness while ensuring compliance with <strong>post\u2011Christchurch seismic standards<\/strong>, British Government requirements, and New Zealand regulatory frameworks.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project faced an unusually high level of consequence and complexity:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A condemned, non\u2011operational <strong>sovereign diplomatic facility<\/strong><\/li>\n\n\n\n<li>Structural damage requiring urgent investigation and rectification<\/li>\n\n\n\n<li>Requirement to meet <strong>updated seismic codes introduced after the Christchurch earthquakes<\/strong><\/li>\n\n\n\n<li>Dual compliance obligations across <strong>British Government standards<\/strong> and <strong>New Zealand building regulations<\/strong><\/li>\n\n\n\n<li>The need to maintain diplomatic continuity through staff relocation and phased return<\/li>\n\n\n\n<li>High public, governmental, and international scrutiny<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This was not a simple repair project\u2014it was <strong>post\u2011disaster recovery of a sovereign mission<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The engagement encompassed end\u2011to\u2011end recovery and rebuild activities, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Detailed structural integrity and seismic assessments<\/li>\n\n\n\n<li>Engineering design for structural rectification and strengthening<\/li>\n\n\n\n<li>Development of a repair and rebuild project management plan<\/li>\n\n\n\n<li>Structural, civil, mechanical, electrical, and operational system upgrades<\/li>\n\n\n\n<li>Heritage\u2011sensitive restoration where applicable<\/li>\n\n\n\n<li>Staff relocation and operational continuity planning<\/li>\n\n\n\n<li>Full compliance documentation, certification, and handover<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>post\u2011disaster, compliance\u2011first delivery model<\/strong> was applied\u2014designed to restore confidence, safety, and operational capability under scrutiny.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Comprehensive Structural Assessment:<\/strong> Immediate inspection and engineering analysis to determine the extent of damage and residual risk<\/li>\n\n\n\n<li><strong>Seismic Engineering Leadership:<\/strong> Design of strengthening and rectification works aligned to post\u20112012 seismic code updates<\/li>\n\n\n\n<li><strong>Program Governance:<\/strong> Development of a clear repair and rebuild program, sequencing works to prioritise life safety and operational recovery<\/li>\n\n\n\n<li><strong>Stakeholder Alignment:<\/strong> Continuous engagement with British Government representatives to align scope, schedule, and access under diplomatic constraints<\/li>\n\n\n\n<li><strong>Operational Continuity Planning:<\/strong> Managed staff relocation and phased reoccupation to minimise disruption to diplomatic functions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">I led the development and execution of the project as <strong>Head Contractor Program Director<\/strong>, holding accountability across engineering, construction, safety, and delivery.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks requiring deliberate management included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Structural uncertainty following a major seismic event<\/li>\n\n\n\n<li>Executing major rectification works on a condemned facility<\/li>\n\n\n\n<li>Aligning dual regulatory regimes without delay or rework<\/li>\n\n\n\n<li>Maintaining programme certainty under post\u2011earthquake urgency<\/li>\n\n\n\n<li>Protecting the diplomatic function and reputation of the British Government<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through conservative engineering assumptions, staged approvals, and disciplined execution governance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Full <strong>structural assessment and seismic retrofit design<\/strong><\/li>\n\n\n\n<li>Structural rectification and strengthening of the High Commission building<\/li>\n\n\n\n<li>Restoration and upgrade of mechanical, electrical, and operational systems<\/li>\n\n\n\n<li>Compliance with both British and New Zealand seismic and building codes<\/li>\n\n\n\n<li>Staff relocation and phased return strategy<\/li>\n\n\n\n<li>Comprehensive handover documentation and staff training<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery &amp; Safety Performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>~126,000 work hours<\/strong><\/li>\n\n\n\n<li><strong>Zero Lost Time Injuries (LTI)<\/strong><\/li>\n\n\n\n<li><strong>One First Aid Incident (FAI)<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This reflects disciplined safety management in a high\u2011risk, post\u2011disaster environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Restored the British High Commission to <strong>full structural and operational integrity<\/strong><\/li>\n\n\n\n<li>Achieved compliance with modern seismic and safety standards<\/li>\n\n\n\n<li>Preserved the functional and representational role of the diplomatic mission<\/li>\n\n\n\n<li>Enabled safe reoccupation following condemnation<\/li>\n\n\n\n<li>Delivered on time and within approved budget despite post\u2011earthquake complexity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The British Government regained a <strong>safe, resilient, and compliant diplomatic facility<\/strong>, capable of long\u2011term operation in a high\u2011seismic region.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery Team<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Design<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Lead Designer<\/li>\n\n\n\n<li>8 \u00d7 Engineers<\/li>\n\n\n\n<li>10 \u00d7 Drafters<\/li>\n\n\n\n<li>1 \u00d7 PLC \/ SCADA Designer<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Construction<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Project Manager<\/li>\n\n\n\n<li>1 \u00d7 Construction Engineer<\/li>\n\n\n\n<li>1 \u00d7 Contracts Manager<\/li>\n\n\n\n<li>1 \u00d7 Quality Manager<\/li>\n\n\n\n<li>1 \u00d7 Safety Manager<\/li>\n\n\n\n<li>Structural fabrication contractor<\/li>\n\n\n\n<li>Mechanical systems fabrication contractor<\/li>\n\n\n\n<li>Erection contractor<\/li>\n\n\n\n<li>7 \u00d7 Functional suppliers (motors, gearboxes, drives, pulleys, idlers, P&amp;I monitoring\/control)<\/li>\n\n\n\n<li>Electrical contractor<\/li>\n\n\n\n<li>1 \u00d7 Construction Manager<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Post\u2011Disaster Leadership:<\/strong> Calm, decisive delivery following a major seismic event<\/li>\n\n\n\n<li><strong>Sovereign Asset Experience:<\/strong> Trusted execution under diplomatic and international scrutiny<\/li>\n\n\n\n<li><strong>Seismic &amp; Structural Expertise:<\/strong> Alignment with post\u2011Christchurch seismic codes<\/li>\n\n\n\n<li><strong>Dual\u2011Compliance Mastery:<\/strong> British Government and New Zealand regulatory alignment<\/li>\n\n\n\n<li><strong>Governance Confidence:<\/strong> Decisions and outcomes able to withstand review and audit<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=4669\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>British High Commission, Wellington \u2013 Post\u2011Earthquake Rebuild &amp; Structural Rectification Client: British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 REIT \u2013 Post\u2011Disaster Rebuild &amp; RenovationProject Value: AUD $3.98 millionProject Duration: 2017Role: Head [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4687,"parent":0,"menu_order":18,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4669","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Deplomacy and Consular Services - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4669\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Deplomacy and Consular Services - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"British High Commission, Wellington \u2013 Post\u2011Earthquake Rebuild &amp; Structural Rectification Client: British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 REIT \u2013 Post\u2011Disaster Rebuild &amp; RenovationProject Value: AUD $3.98 millionProject Duration: 2017Role: Head [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4669\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-07T06:19:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1613\" \/>\n\t<meta property=\"og:image:height\" content=\"1027\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669\",\"name\":\"Empowering Deplomacy and Consular Services - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/British_High_Commission_Wellington_2015.jpg?fit=1613%2C1027&ssl=1\",\"datePublished\":\"2024-12-23T12:58:00+00:00\",\"dateModified\":\"2026-06-07T06:19:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/British_High_Commission_Wellington_2015.jpg?fit=1613%2C1027&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/British_High_Commission_Wellington_2015.jpg?fit=1613%2C1027&ssl=1\",\"width\":1613,\"height\":1027},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4669#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Deplomacy and Consular Services\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Deplomacy and Consular Services - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4669","og_locale":"en_US","og_type":"article","og_title":"Empowering Deplomacy and Consular Services - Murray Slatter","og_description":"British High Commission, Wellington \u2013 Post\u2011Earthquake Rebuild &amp; Structural Rectification Client: British Government \u2013 Foreign &amp; Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 REIT \u2013 Post\u2011Disaster Rebuild &amp; RenovationProject Value: AUD $3.98 millionProject Duration: 2017Role: Head [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4669","og_site_name":"Murray Slatter","article_modified_time":"2026-06-07T06:19:22+00:00","og_image":[{"width":1613,"height":1027,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4669","url":"https:\/\/murrayslatter.me\/?page_id=4669","name":"Empowering Deplomacy and Consular Services - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4669#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4669#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1613%2C1027&ssl=1","datePublished":"2024-12-23T12:58:00+00:00","dateModified":"2026-06-07T06:19:22+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4669#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4669"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4669#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1613%2C1027&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1613%2C1027&ssl=1","width":1613,"height":1027},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4669#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Deplomacy and Consular Services"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4673,"url":"https:\/\/murrayslatter.me\/?page_id=4673","url_meta":{"origin":4669,"position":0},"title":"Empowering State Diplomacy","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioner\u2019s Residence, Wellington \u2013 Seismic Repairs & Structural Strengthening Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations & Additions (Residential \/ Diplomatic Asset)Project Value: AUD $698,080Project Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The British\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4982,"url":"https:\/\/murrayslatter.me\/?page_id=4982","url_meta":{"origin":4669,"position":1},"title":"Consular Generals Home Vaucluse Renovation","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"British High Commission (Consular), Sydney \u2013 Vaucluse Residence Renovation Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Vaucluse, Sydney, NSWProject Type: Capital Project \u2013 REIT \u2013 Heritage Renovation (Residential \/ Diplomatic Asset)Project Value: USD\u00a0$1.97\u00a0millionProject Duration: 2015Role: Program Leadership & Delivery (Head Contractor \/ Client\u2011Side Program Director) Strategic Objective\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4674,"url":"https:\/\/murrayslatter.me\/?page_id=4674","url_meta":{"origin":4669,"position":2},"title":"Empowering great Sustainability Outcomes","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioner\u2019s Residence, Wellington \u2013 Hazardous Materials Removal & Renovation Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations & Additions (Residential \/ Diplomatic Asset)Project Value: AUD $1.56 millionProject Duration: January 2017 \u2013 September 2017Role: Head Contractor \u2013 Program\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4668,"url":"https:\/\/murrayslatter.me\/?page_id=4668","url_meta":{"origin":4669,"position":3},"title":"Empowering Consular Services and Protection","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Melbourne, AustraliaProject Period: 2015Project Type: Capital Project \u2013 Sovereign Asset Security UpgradeSystem Scope: Blast\u2011Resistant Structure, Security Integration & Operational Fit\u2011OutRole: Program Leadership \u2013 Design, Construction & Operational Readiness Strategic Objective The British Consular Office in Melbourne operates as a sovereign\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4665,"url":"https:\/\/murrayslatter.me\/?page_id=4665","url_meta":{"origin":4669,"position":4},"title":"Empowering Enviromental Consular Services","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Canberra, AustraliaProject Period: 2016Project Type: Capital Project \u2013 Sovereign Asset Infrastructure RenewalSystem Scope: Heating, Cooling, Energy Generation & Building ControlsRole: Program Leadership \u2013 Design, Construction & Operational Transition Strategic Objective The British High Commission building in Canberra is a sovereign\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1200%2C798&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6260,"url":"https:\/\/murrayslatter.me\/?page_id=6260","url_meta":{"origin":4669,"position":5},"title":"Empowering Offgrid Embassy Services","author":"Murray Slatter","date":"June 9, 2026","format":false,"excerpt":"Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Canberra, AustraliaProject Period: 2016Project Type: Capital Project \u2013 Sovereign Asset Infrastructure RenewalSystem Scope: Heating, Cooling, Energy Generation & Building ControlsRole: Program Leadership \u2013 Design, Construction & Operational Transition Strategic Objective The British High Commission building in Canberra is a sovereign\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/BHC-Solar.png?fit=868%2C647&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4669"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4669\/revisions"}],"predecessor-version":[{"id":6240,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4669\/revisions\/6240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4687"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}