{"id":4665,"date":"2024-12-24T18:33:51","date_gmt":"2024-12-24T07:33:51","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4665"},"modified":"2024-12-24T18:40:05","modified_gmt":"2024-12-24T07:40:05","slug":"empowering-enviromental-consultar-services","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4665","title":{"rendered":"Empowering Enviromental Consular Services"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">British High Commission Whole Building Heating and Cooling Construction<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td>British High Commission Whole Building Heating and Cooling Construction<\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>British Government &#8211; Foreign Commonwealth Office &#8211; High Commission<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Capital Project \u2013 REIT \u2013 Renovation<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>$1,810,000<\/td><\/tr><tr><td><strong>Project Start and Finish<\/strong><\/td><td>2015 \u2013 2015<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To <strong>modernize and optimize the heating and cooling infrastructure<\/strong> of the British High Commission, ensuring <strong>operational efficiency, energy sustainability, and environmental compliance<\/strong> while maintaining building heritage integrity.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>&#8211; The existing <strong>HVAC systems were outdated<\/strong> and inefficient, causing high operational costs.<br>&#8211; Integration of modern HVAC systems into a <strong>heritage-listed building<\/strong> posed structural and regulatory challenges.<br>&#8211; Minimizing <strong>disruption to ongoing operations<\/strong> during construction.<br>&#8211; Compliance with <strong>UK and Australian environmental and operational standards<\/strong> was essential.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>&#8211; Conducted a <strong>comprehensive systems audit<\/strong> to identify critical gaps and inefficiencies.<br>&#8211; Designed a <strong>custom HVAC system<\/strong> tailored to the building&#8217;s unique requirements.<br>&#8211; Collaborated with <strong>regulatory authorities<\/strong> to ensure compliance with heritage and environmental laws.<br>&#8211; Phased implementation to <strong>minimize disruption to ongoing operations<\/strong>.<br>&#8211; Delivered extensive <strong>training for building management teams<\/strong> on maintaining and operating the new systems.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Complete <strong>redesign and installation<\/strong> of state-of-the-art heating and cooling systems.<br>&#8211; Integration of <strong>smart controls and monitoring systems<\/strong> for energy efficiency.<br>&#8211; Achieved <strong>compliance with environmental and operational standards<\/strong>.<br>&#8211; Full handover documentation, including <strong>operation manuals and maintenance schedules<\/strong>.<br>&#8211; Conducted <strong>staff training sessions<\/strong> to ensure smooth transition and ongoing operation.<\/td><\/tr><tr><td><strong>Risks and Challenges<\/strong><\/td><td>&#8211; Ensuring <strong>minimal disruption<\/strong> during the construction phase.<br>&#8211; Addressing <strong>heritage building constraints<\/strong> while modernizing infrastructure.<br>&#8211; Managing <strong>stakeholder expectations<\/strong> across multiple regulatory authorities.<br>&#8211; Balancing <strong>budget and project timelines<\/strong> without compromising on quality.<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>&#8211; Successfully modernized the <strong>HVAC systems<\/strong>, achieving improved energy efficiency and reduced operational costs.<br>&#8211; Ensured <strong>regulatory compliance<\/strong> with both UK and Australian standards.<br>&#8211; Delivered the project <strong>on time and within budget<\/strong>.<br>&#8211; Enhanced building <strong>operational resilience and sustainability<\/strong>.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; <strong>Specialized Expertise:<\/strong> Delivered tailored HVAC solutions in heritage-sensitive environments.<br>&#8211; <strong>Operational Excellence:<\/strong> Phased construction minimized operational downtime.<br>&#8211; <strong>Compliance Assurance:<\/strong> Seamless integration of multi-jurisdictional compliance standards.<br>&#8211; <strong>Energy Efficiency:<\/strong> Implemented state-of-the-art technologies for long-term sustainability.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Check out more about the industries I have served : <a href=\"https:\/\/murrayslatter.me\/?page_id=717\">Here<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>British High Commission Whole Building Heating and Cooling Construction Project Name British High Commission Whole Building Heating and Cooling Construction Client Company British Government &#8211; Foreign Commonwealth Office &#8211; High Commission Project Type Capital Project \u2013 REIT \u2013 Renovation Project [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4739,"parent":0,"menu_order":26,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4665","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Enviromental Consular Services - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4665\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Enviromental Consular Services - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"British High Commission Whole Building Heating and Cooling Construction Project Name British High Commission Whole Building Heating and Cooling Construction Client Company British Government &#8211; Foreign Commonwealth Office &#8211; High Commission Project Type Capital Project \u2013 REIT \u2013 Renovation Project [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4665\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-24T07:40:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1250\" \/>\n\t<meta property=\"og:image:height\" content=\"831\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665\",\"name\":\"Empowering Enviromental Consular Services - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/3-vb0_7876.jpg?fit=1250%2C831&ssl=1\",\"datePublished\":\"2024-12-24T07:33:51+00:00\",\"dateModified\":\"2024-12-24T07:40:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/3-vb0_7876.jpg?fit=1250%2C831&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/3-vb0_7876.jpg?fit=1250%2C831&ssl=1\",\"width\":1250,\"height\":831},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4665#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Enviromental Consular Services\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Enviromental Consular Services - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4665","og_locale":"en_US","og_type":"article","og_title":"Empowering Enviromental Consular Services - Murray Slatter","og_description":"British High Commission Whole Building Heating and Cooling Construction Project Name British High Commission Whole Building Heating and Cooling Construction Client Company British Government &#8211; Foreign Commonwealth Office &#8211; High Commission Project Type Capital Project \u2013 REIT \u2013 Renovation Project [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4665","og_site_name":"Murray Slatter","article_modified_time":"2024-12-24T07:40:05+00:00","og_image":[{"width":1250,"height":831,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4665","url":"https:\/\/murrayslatter.me\/?page_id=4665","name":"Empowering Enviromental Consular Services - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4665#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4665#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1250%2C831&ssl=1","datePublished":"2024-12-24T07:33:51+00:00","dateModified":"2024-12-24T07:40:05+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4665#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4665"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4665#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1250%2C831&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/3-vb0_7876.jpg?fit=1250%2C831&ssl=1","width":1250,"height":831},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4665#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Enviromental Consular Services"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4669,"url":"https:\/\/murrayslatter.me\/?page_id=4669","url_meta":{"origin":4665,"position":0},"title":"Empowering Deplomacy and Consular Services","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commission - Wellington Rebuild after Earthquake Following the 8.1 magnitude earthquake in Wellington New Zealand where by several buildings near the epicentre in downtown Wellington were damanged, The British Embassy was evacuated and condemed due to the structural damage. My team conducted the structural assessment, provide the repair\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4673,"url":"https:\/\/murrayslatter.me\/?page_id=4673","url_meta":{"origin":4665,"position":1},"title":"Empowering State Diplomacy","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioners Home Wellington Seismic Repairs Following the 8.1 level earthquake in Wellington New Zealand, we conducted some structural inspections to this historical building and provided the Structural Integratity inspection and recommendations from repairs. Our repairs were undertaken to strengthen the building and upgrade the civils\/structurals to acheive the\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4668,"url":"https:\/\/murrayslatter.me\/?page_id=4668","url_meta":{"origin":4665,"position":2},"title":"Empowering Consular Services and Protection","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"British Consular Office Melbourne Interview Room Blast Proof Fitout Project NameBritish Consular Office Melbourne Interview Room Blast Proof FitoutClient CompanyBritish Government - Foreign Commonwealth Office - High CommissionProject TypeCapital Project - REIT - RenovationProject Value$209,385Project Start and Finish2015 - 2015Strategic ObjectiveTo design and construct a highly secure, blast-proof interview room\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/counter-shields.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4674,"url":"https:\/\/murrayslatter.me\/?page_id=4674","url_meta":{"origin":4665,"position":3},"title":"Empowering great Sustainability Outcomes","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioners Wellington Decontamination\/Renovation (Lead\/Asbestos) Sustainable construction practices may not have been as prominant in earlier generations of construction (even in New Zealand) however with the discovery of banned contaminants within this Property and given that it is the High Commissioners Home in Wellington, a Showcase State property of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4661,"url":"https:\/\/murrayslatter.me\/?page_id=4661","url_meta":{"origin":4665,"position":4},"title":"Empowering Enviromental State Affairs","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"British High Commissioner's House Air Conditioning Upgrades 1) Project NameBritish High Commissioner's House Air Conditioning Upgrades2) Client CompanyBritish Government - Foreign Commonwealth Office - High Commission3) Project TypeCapital Project \u2013 REIT \u2013 Renovation4) Project Value$405,0005) Project Start and Finish2014 \u2013 20146) Strategic ObjectiveTo upgrade and modernize the air conditioning systems\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Westminster-house-HVAC.jpg?fit=1200%2C820&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4670,"url":"https:\/\/murrayslatter.me\/?page_id=4670","url_meta":{"origin":4665,"position":5},"title":"Empowering Compliance","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"105 x FCO Houses Rewire to Meet British Standards (in Compliance with Australian Standards) The British Government mandates that all overseas estates, including embassies, consulates, and official residences, comply with UK health, safety, and operational standards. This ensures a consistent and secure environment for staff, aligning with British regulations and\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/11\/Single-Family-Dwelling.webp?fit=536%2C301&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/11\/Single-Family-Dwelling.webp?fit=536%2C301&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/11\/Single-Family-Dwelling.webp?fit=536%2C301&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4665","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4665"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4665\/revisions"}],"predecessor-version":[{"id":4744,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4665\/revisions\/4744"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4739"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}