{"id":4655,"date":"2024-12-24T00:18:49","date_gmt":"2024-12-23T13:18:49","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4655"},"modified":"2026-06-06T16:31:04","modified_gmt":"2026-06-06T06:31:04","slug":"empowering-operational-effectiveness","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4655","title":{"rendered":"Empowering Operational Effectiveness"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">BOC Christchurch PnL \u2013 Structural &amp; Operational Critical Environments Upgrades<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> BOC<br><strong>Location:<\/strong> Christchurch, New Zealand<br><strong>Project Type:<\/strong> Capital Project \u2013 REIT \u2013 Industrial Renovation (Critical Environments)<br><strong>Project Value:<\/strong> $3m<br><strong>Project Duration:<\/strong> 2017<br><strong>Role:<\/strong> Head Contractor \u2013 Program Director<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Christchurch PnL facility is a <strong>critical industrial process plant<\/strong>, where structural integrity, operational reliability, and safety compliance underpin continuous production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BOC leadership required targeted structural and process\u2011plant upgrades to ensure the facility remained compliant, resilient, and fit\u2011for\u2011purpose\u2014without interrupting operations. The objective was to <strong>modernise critical operational environments and process systems<\/strong>, improving long\u2011term reliability while maintaining zero operational downtime.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project faced a combination of high\u2011consequence constraints:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Structural vulnerabilities within operationally critical environments<\/li>\n\n\n\n<li>Ageing process\u2011plant systems requiring modernisation to meet current standards<\/li>\n\n\n\n<li>A live production environment with <strong>no tolerance for unplanned outages<\/strong><\/li>\n\n\n\n<li>The need to integrate upgraded safety, environmental, and monitoring systems<\/li>\n\n\n\n<li>Legacy infrastructure introducing technical complexity and interface risk<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Every decision carried direct implications for safety, compliance, and production continuity.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The engagement covered full engineering, delivery, and handover of structural and process upgrades, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Detailed structural assessments and reinforcement works<\/li>\n\n\n\n<li>Process plant system upgrades within operational critical environments<\/li>\n\n\n\n<li>Installation of enhanced monitoring, control, and fail\u2011safe systems<\/li>\n\n\n\n<li>Compliance upgrades aligned to environmental and safety standards<\/li>\n\n\n\n<li>Operational documentation, training, and handover<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>systems\u2011led, phased delivery model<\/strong> was adopted to reduce risk while maintaining operational continuity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>In\u2011Depth Site Assessment:<\/strong> Identification of structural and operational upgrade priorities<\/li>\n\n\n\n<li><strong>Phased Implementation Planning:<\/strong> Sequenced works to minimise operational impact and risk exposure<\/li>\n\n\n\n<li><strong>Stakeholder Collaboration:<\/strong> Close alignment with BOC operations, engineering, and governance teams<\/li>\n\n\n\n<li><strong>Procurement &amp; Contractor Governance:<\/strong> Evaluation, negotiation, and control of specialist contractors and suppliers<\/li>\n\n\n\n<li><strong>Operational Readiness:<\/strong> Delivery of training, documentation, and handover supporting ongoing plant performance<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">I led the program as <strong>Head Contractor Program Director<\/strong>, providing single\u2011point accountability across design, construction, safety, and commissioning.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks requiring deliberate management included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Balancing structural and process upgrades with uninterrupted plant operations<\/li>\n\n\n\n<li>Navigating complex regulatory and compliance requirements<\/li>\n\n\n\n<li>Integrating new systems into legacy plant infrastructure<\/li>\n\n\n\n<li>Coordinating multidisciplinary delivery teams within a constrained live environment<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through disciplined planning, phased execution, and tight interface control.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Structural upgrades across critical operational environments<\/li>\n\n\n\n<li>Modernised process\u2011plant systems meeting current regulatory and performance standards<\/li>\n\n\n\n<li>Enhanced monitoring and control systems<\/li>\n\n\n\n<li>Fail\u2011safe mechanisms supporting operational resilience<\/li>\n\n\n\n<li>Detailed documentation, operational manuals, and staff training<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">All upgrades were executed without disruption to day\u2011to\u2011day production.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery &amp; Safety Performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>~126,000 work hours<\/strong><\/li>\n\n\n\n<li><strong>Zero Lost Time Injuries (LTI)<\/strong><\/li>\n\n\n\n<li><strong>One First Aid Incident (FAI)<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This outcome reflected disciplined safety leadership in a live industrial environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Achieved structural and operational upgrades with <strong>zero downtime<\/strong><\/li>\n\n\n\n<li>Improved plant resilience and performance stability<\/li>\n\n\n\n<li>Ensured full compliance with environmental and safety standards<\/li>\n\n\n\n<li>Was delivered <strong>on time and within budget<\/strong><\/li>\n\n\n\n<li>Provided BOC with confidence in the facility\u2019s long\u2011term reliability<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery Team<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Design Phase<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Lead Designer<\/li>\n\n\n\n<li>8 \u00d7 Engineers<\/li>\n\n\n\n<li>10 \u00d7 Drafters<\/li>\n\n\n\n<li>1 \u00d7 PLC \/ SCADA Designer<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Construction Phase<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Project Manager<\/li>\n\n\n\n<li>1 \u00d7 Construction Engineer<\/li>\n\n\n\n<li>1 \u00d7 Contracts Manager<\/li>\n\n\n\n<li>1 \u00d7 Quality Manager<\/li>\n\n\n\n<li>1 \u00d7 Safety Manager<\/li>\n\n\n\n<li>Structural fabrication contractor<\/li>\n\n\n\n<li>Mechanical systems fabrication contractor<\/li>\n\n\n\n<li>Erection contractor<\/li>\n\n\n\n<li>7 \u00d7 Functional Suppliers (motors, gearboxes, drives, pulleys, idlers, P&amp;I monitoring\/control)<\/li>\n\n\n\n<li>Electrical contractor<\/li>\n\n\n\n<li>1 \u00d7 Construction Manager<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Critical Environments Expertise:<\/strong> Delivery within live, process\u2011driven industrial facilities<\/li>\n\n\n\n<li><strong>Zero\u2011Downtime Focus:<\/strong> Phased execution protecting operational continuity<\/li>\n\n\n\n<li><strong>Compliance Assurance:<\/strong> Regulatory, safety, and environmental alignment embedded from the outset<\/li>\n\n\n\n<li><strong>Governed Delivery:<\/strong> Strong procurement, contractor, and execution oversight<\/li>\n\n\n\n<li><strong>Future\u2011Ready Outcomes:<\/strong> Infrastructure designed for long\u2011term operational demands<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=4655\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BOC Christchurch PnL \u2013 Structural &amp; Operational Critical Environments Upgrades Client: BOCLocation: Christchurch, New ZealandProject Type: Capital Project \u2013 REIT \u2013 Industrial Renovation (Critical Environments)Project Value: $3mProject Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The Christchurch PnL facility [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4700,"parent":914,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4655","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Operational Effectiveness - Murray Slatter<\/title>\n<meta name=\"description\" content=\"Following 2015 Earthquake BOC&#039;s structural integrity, operational reliability, safety compliance called for a renovation insuring reliability\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4655\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Operational Effectiveness - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Following 2015 Earthquake BOC&#039;s structural integrity, operational reliability, safety compliance called for a renovation insuring reliability\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4655\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T06:31:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BOC-Sockburn.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1078\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655\",\"name\":\"Empowering Operational Effectiveness - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/BOC-Sockburn.png?fit=1078%2C683&ssl=1\",\"datePublished\":\"2024-12-23T13:18:49+00:00\",\"dateModified\":\"2026-06-06T06:31:04+00:00\",\"description\":\"Following 2015 Earthquake BOC's structural integrity, operational reliability, safety compliance called for a renovation insuring reliability\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/BOC-Sockburn.png?fit=1078%2C683&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/BOC-Sockburn.png?fit=1078%2C683&ssl=1\",\"width\":1078,\"height\":683},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4655#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EMPOWERING INDUSTRIAL OUTCOMES\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=914\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Empowering Operational Effectiveness\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Operational Effectiveness - Murray Slatter","description":"Following 2015 Earthquake BOC's structural integrity, operational reliability, safety compliance called for a renovation insuring reliability","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4655","og_locale":"en_US","og_type":"article","og_title":"Empowering Operational Effectiveness - Murray Slatter","og_description":"Following 2015 Earthquake BOC's structural integrity, operational reliability, safety compliance called for a renovation insuring reliability","og_url":"https:\/\/murrayslatter.me\/?page_id=4655","og_site_name":"Murray Slatter","article_modified_time":"2026-06-06T06:31:04+00:00","og_image":[{"width":1078,"height":683,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BOC-Sockburn.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4655","url":"https:\/\/murrayslatter.me\/?page_id=4655","name":"Empowering Operational Effectiveness - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4655#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4655#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BOC-Sockburn.png?fit=1078%2C683&ssl=1","datePublished":"2024-12-23T13:18:49+00:00","dateModified":"2026-06-06T06:31:04+00:00","description":"Following 2015 Earthquake BOC's structural integrity, operational reliability, safety compliance called for a renovation insuring reliability","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4655#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4655"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4655#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BOC-Sockburn.png?fit=1078%2C683&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BOC-Sockburn.png?fit=1078%2C683&ssl=1","width":1078,"height":683},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4655#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"EMPOWERING INDUSTRIAL OUTCOMES","item":"https:\/\/murrayslatter.me\/?page_id=914"},{"@type":"ListItem","position":3,"name":"Empowering Operational Effectiveness"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4657,"url":"https:\/\/murrayslatter.me\/?page_id=4657","url_meta":{"origin":4655,"position":0},"title":"Empowering Safer Industrial Production","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BOC Penrose Acetylene Plant \u2013 Structural & Roof Rectifications Client: BOCLocation: Penrose, NSWProject Type: Capital Project \u2013 REIT \u2013 Industrial RenovationProject Value: $2.5 millionProject Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The Penrose Acetylene Plant is a high\u2011hazard industrial facility, where structural integrity and environmental protection are inseparable\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Asetalyn-Plant-1.png?fit=958%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4669,"url":"https:\/\/murrayslatter.me\/?page_id=4669","url_meta":{"origin":4655,"position":1},"title":"Empowering Deplomacy and Consular Services","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commission, Wellington \u2013 Post\u2011Earthquake Rebuild & Structural Rectification Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 REIT \u2013 Post\u2011Disaster Rebuild & RenovationProject Value: AUD $3.98 millionProject Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The British High Commission\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/British_High_Commission_Wellington_2015.jpg?fit=1200%2C764&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4673,"url":"https:\/\/murrayslatter.me\/?page_id=4673","url_meta":{"origin":4655,"position":2},"title":"Empowering State Diplomacy","author":"Murray Slatter","date":"December 23, 2024","format":false,"excerpt":"British High Commissioner\u2019s Residence, Wellington \u2013 Seismic Repairs & Structural Strengthening Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Wellington, New ZealandProject Type: Capital Project \u2013 Major Alterations & Additions (Residential \/ Diplomatic Asset)Project Value: AUD $698,080Project Duration: 2017Role: Head Contractor \u2013 Program Director Strategic Objective The British\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Nz-High-Commissioners-home-Homewood.png?fit=1200%2C743&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":792,"url":"https:\/\/murrayslatter.me\/?page_id=792","url_meta":{"origin":4655,"position":3},"title":"Empowering safer air travel","author":"Murray Slatter","date":"October 29, 2018","format":false,"excerpt":"A380 Roof\u2011Supported Automated Aircraft Maintenance Docking System Client: HMCAiC Vietnam Location: Aircraft Heavy Maintenance Facility Project Type: Industrial Fit\u2011Out & Advanced Systems Integration Project Value: AUD $18 million Project Duration: January 2010 \u2013 September 2010 Strategic Objective HMCAiC set out to fundamentally improve how heavy aircraft maintenance is performed on\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6181,"url":"https:\/\/murrayslatter.me\/?page_id=6181","url_meta":{"origin":4655,"position":4},"title":"Empowering the Queensland Economy","author":"Murray Slatter","date":"June 5, 2026","format":false,"excerpt":"Fully Robotic Bulk Materials Handling System (RG Tanna Port) Client: Gladstone Ports Corporation (GPC) Location: RG Tanna Port, Gladstone, Queensland (offshore jetty ~2.7 km from mainland) Project Type: Robotics\u2011Enabled Capital Project \u2013 Bulk Materials Handling Automation Project Value: AUD $50 million Project Period: 2006 \u2013 2008 Role: Executive General Manager\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/GPC-SL3.png?fit=729%2C500&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/GPC-SL3.png?fit=729%2C500&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/GPC-SL3.png?fit=729%2C500&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/GPC-SL3.png?fit=729%2C500&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":278,"url":"https:\/\/murrayslatter.me\/?page_id=278","url_meta":{"origin":4655,"position":5},"title":"Empowering Faltering Nations back to Prosperity","author":"Murray Slatter","date":"February 26, 2017","format":false,"excerpt":"Sierra Leone Ship loading facility The Pepel Transhipment Facility Upgrade and Rebirth project exemplifies innovation, precision, and resilience in delivering industrial infrastructure solutions under extreme constraints. Tasked with retrofitting a long-abandoned transshipment facility in Sierra Leone, Qfactor overcame logistical, structural, and operational challenges to deliver a fully functional system within\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4655","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4655"}],"version-history":[{"count":5,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4655\/revisions"}],"predecessor-version":[{"id":6214,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4655\/revisions\/6214"}],"up":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/914"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4700"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}