{"id":4652,"date":"2024-12-24T18:11:45","date_gmt":"2024-12-24T07:11:45","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4652"},"modified":"2024-12-24T18:12:33","modified_gmt":"2024-12-24T07:12:33","slug":"empowering-tax-regulation-compliance-bma","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4652","title":{"rendered":"Empowering Tax Regulation Compliance BMA"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td>BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring<\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>BMA (BHP Mitsubishi Alliance)<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Capital Project \u2013 Industrial Process<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>$3,3m<\/td><\/tr><tr><td><strong> Project Start and Finish<\/strong><\/td><td>2013 \u2013 2013<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To design, install, and commission an upgraded <strong>fuel storage, control, and monitoring system<\/strong> at Goonyella Riverside Mine, enhancing operational efficiency, safety, and environmental compliance.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>&#8211; Modernize the existing <strong>fuel infrastructure<\/strong> to meet increasing operational demands.<br>&#8211; Implement <strong>real-time control and monitoring systems<\/strong> for fuel storage and distribution.<br>&#8211; Ensure compliance with <strong>environmental regulations<\/strong> to prevent spills and fuel losses.<br>&#8211; Minimize <strong>operational disruptions<\/strong> during the project execution phase.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>&#8211; Conducted a <strong>comprehensive site audit<\/strong> to assess existing infrastructure and operational needs.<br>&#8211; Developed a <strong>phased project implementation plan<\/strong> to minimize downtime.<br>&#8211; Collaborated with <strong>BMA operational teams<\/strong> to ensure alignment with safety and performance requirements.<br>&#8211; Installed <strong>SCADA-based monitoring systems<\/strong> for real-time fuel inventory and distribution oversight.<br>&#8211; Provided <strong>staff training<\/strong> to ensure smooth handover and long-term operational efficiency.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Upgraded <strong>fuel farm infrastructure<\/strong>, including fuel tanks and distribution systems.<br>&#8211; Implemented <strong>advanced monitoring and control systems<\/strong> with SCADA integration.<br>&#8211; Installed <strong>fail-safe mechanisms<\/strong> for spill prevention and environmental compliance.<br>&#8211; Delivered <strong>operational manuals and staff training programs<\/strong>.<br>&#8211; Completed detailed <strong>handover documentation<\/strong> aligned with safety and environmental standards.<\/td><\/tr><tr><td><strong>10) Risks and Challenges<\/strong><\/td><td>&#8211; Balancing <strong>tight timelines and operational continuity<\/strong> without affecting daily mining activities.<br>&#8211; Ensuring <strong>zero environmental incidents<\/strong> during installation and commissioning.<br>&#8211; Integrating <strong>modern control systems<\/strong> with legacy infrastructure.<br>&#8211; Managing compliance with <strong>strict regulatory and safety standards<\/strong>.<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>&#8211; Delivered a <strong>fully upgraded fuel farm system<\/strong> with robust monitoring and control capabilities.<br>&#8211; Achieved <strong>zero safety incidents and zero LTIs<\/strong> during the project lifecycle.<br>&#8211; Enhanced <strong>operational oversight and efficiency<\/strong> through advanced monitoring systems.<br>&#8211; Delivered the project <strong>on time and within budget<\/strong>, meeting all performance indicators.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; <strong>Advanced Technological Integration:<\/strong> Real-time SCADA monitoring and automated controls.<br>&#8211; <strong>Operational Continuity:<\/strong> Ensured uninterrupted mining operations during project execution.<br>&#8211; <strong>Safety and Compliance Focus:<\/strong> Adhered to strict environmental and safety standards.<br>&#8211; <strong>Scalable Design:<\/strong> Built infrastructure capable of supporting future operational expansions.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Check out more about the industries I have served : <a href=\"https:\/\/murrayslatter.me\/?page_id=717\">Here<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">I led the development and execution of the project as Head Contractor Program Director\/delivery team.<\/h4>\n\n\n\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Lead Solutions Engineer <\/li>\n\n\n\n<li>4 x Solutions Integrators\/Designers,<\/li>\n\n\n\n<li>1 x Process and Control Implementation Engineer<\/li>\n<\/ul>\n\n\n\n<p><strong>Construction <\/strong>for the Construction project the team will consist of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Project Manager<\/li>\n\n\n\n<li>1 x Construction Engineer<\/li>\n\n\n\n<li>1 x Contracts Manager<\/li>\n\n\n\n<li>1 x Quality Manager<\/li>\n\n\n\n<li>1 x Safety Manager<\/li>\n\n\n\n<li>1 x MEP Fabrication and Installation Contractor<\/li>\n\n\n\n<li>1 x Mechanical systems Fabrication contractors<\/li>\n\n\n\n<li>1 x Tanks and Tanking contractor<\/li>\n\n\n\n<li>7 x Functional Suppliers <\/li>\n\n\n\n<li>1 x Electrical contractor<\/li>\n<\/ul>\n\n\n\n<p>Project was completed with 26,000 hrs with ZERO LTI and 1 x FAI<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project Name BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Client Company BMA (BHP Mitsubishi Alliance) Project Type Capital Project \u2013 Industrial Process Project [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4717,"parent":0,"menu_order":35,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4652","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Tax Regulation Compliance BMA - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4652\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Tax Regulation Compliance BMA - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project Name BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Client Company BMA (BHP Mitsubishi Alliance) Project Type Capital Project \u2013 Industrial Process Project [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4652\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-24T07:12:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1858\" \/>\n\t<meta property=\"og:image:height\" content=\"723\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652\",\"name\":\"Empowering Tax Regulation Compliance BMA - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1\",\"datePublished\":\"2024-12-24T07:11:45+00:00\",\"dateModified\":\"2024-12-24T07:12:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1\",\"width\":1858,\"height\":723},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Tax Regulation Compliance BMA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Tax Regulation Compliance BMA - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4652","og_locale":"en_US","og_type":"article","og_title":"Empowering Tax Regulation Compliance BMA - Murray Slatter","og_description":"BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project Name BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Client Company BMA (BHP Mitsubishi Alliance) Project Type Capital Project \u2013 Industrial Process Project [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4652","og_site_name":"Murray Slatter","article_modified_time":"2024-12-24T07:12:33+00:00","og_image":[{"width":1858,"height":723,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4652","url":"https:\/\/murrayslatter.me\/?page_id=4652","name":"Empowering Tax Regulation Compliance BMA - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4652#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4652#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1","datePublished":"2024-12-24T07:11:45+00:00","dateModified":"2024-12-24T07:12:33+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4652#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4652"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4652#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1","width":1858,"height":723},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4652#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Tax Regulation Compliance BMA"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4649,"url":"https:\/\/murrayslatter.me\/?page_id=4649","url_meta":{"origin":4652,"position":0},"title":"Empowering Tax Regulation Compliance  BMA2","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$1,537,332Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission a state-of-the-art 500,000-litre fuel farm infrastructure, ensuring\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4811,"url":"https:\/\/murrayslatter.me\/?page_id=4811","url_meta":{"origin":4652,"position":1},"title":"Program of Industrial Implementation","author":"Murray Slatter","date":"December 29, 2024","format":false,"excerpt":"Developing a program of major implemenations of Site Fuel System across all BMA Coal sites in Queensland, exemplify the integration of Piping, Tanking, Electrical Control, Instrumentation integration, custom-manufactured switchboards, and innovative AdaptMac computer terminals. My analytical skills, advanced knowledge of Design, Manufacturing and Implemenation initiatives addressed operational complexities through tailored\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4647,"url":"https:\/\/murrayslatter.me\/?page_id=4647","url_meta":{"origin":4652,"position":2},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and Monitoring Project NameBHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and MonitoringClient CompanyBHPIO (BHP Iron Ore)Project TypeCapital Project \u2013 Industrial ProcessProject Value$6,602,025Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo upgrade and optimize the fuel system infrastructure at Jimblebar Mine Site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4805,"url":"https:\/\/murrayslatter.me\/?page_id=4805","url_meta":{"origin":4652,"position":3},"title":"Advanced Manufacturing for Bespoke Solutions","author":"Murray Slatter","date":"December 29, 2024","format":false,"excerpt":"The Developing a program of Customer specific Products adapting the AdaptFMS Site Fuel System to all BMA Coal Sites in Queensland, exemplify the integration of supplier products, custom-manufactured switchboards, and innovative AdaptMac computer terminals for Bespoke Solutions. These Advanced Manufacturing initiatives addressed operational complexities through tailored design, robust project execution,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/port-to-pit-640-wfukrrvgjjcj.png?fit=640%2C360&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/port-to-pit-640-wfukrrvgjjcj.png?fit=640%2C360&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/port-to-pit-640-wfukrrvgjjcj.png?fit=640%2C360&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4648,"url":"https:\/\/murrayslatter.me\/?page_id=4648","url_meta":{"origin":4652,"position":4},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Orebody24 Light Vehicles & Heavy Vehicles Fuel Systems Installations Project NameOrebody24 Light Vehicles & Heavy Vehicles Fuel Systems InstallationsClient CompanyBHPIOProject TypeCapital Project \u2013 Industrial ProcessProject Value$3,7mProject Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission advanced fuel systems for both light and heavy vehicles at the Orebody24 mine site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":592,"url":"https:\/\/murrayslatter.me\/?page_id=592","url_meta":{"origin":4652,"position":5},"title":"RTIO &#8211; HCO Fuel Farm","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, bund installation, water treatment\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4652"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4652\/revisions"}],"predecessor-version":[{"id":4720,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4652\/revisions\/4720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4717"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}