{"id":4652,"date":"2024-12-24T18:11:45","date_gmt":"2024-12-24T07:11:45","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4652"},"modified":"2026-06-09T09:45:52","modified_gmt":"2026-06-08T23:45:52","slug":"empowering-tax-regulation-compliance-bma","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4652","title":{"rendered":"Empowering Tax Regulation Compliance BMA"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">BMA Goonyella Riverside Mine \u2013 Fuel Farm Upgrade, Control &amp; Monitoring Systems<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> BMA (BHP Mitsubishi Alliance)<br><strong>Location:<\/strong> Goonyella Riverside Mine, Queensland, Australia<br><strong>Project Period:<\/strong> 2013<br><strong>Project Type:<\/strong> Capital Project \u2013 Industrial Process Infrastructure<br><strong>System Scope:<\/strong> Fuel Storage, Distribution, Control &amp; Monitoring<br><strong>Role:<\/strong> Head Contractor \u2013 Program Director<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Goonyella Riverside is a large\u2011scale, high\u2011throughput metallurgical coal operation within the BMA portfolio, where <strong>fuel availability underpins every production activity<\/strong>\u2014from mobile equipment to fixed plant operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The existing fuel infrastructure required modernisation to support increasing operational demand, improve environmental assurance, and provide real\u2011time visibility of fuel inventory and distribution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The strategic objective was to <strong>design, install, and commission an upgraded fuel storage, control, and monitoring system<\/strong> that enhanced operational reliability, strengthened environmental protection, and integrated seamlessly into the mine\u2019s broader control environment\u2014<strong>without interrupting production<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fuel systems represent a <strong>high\u2011consequence risk node<\/strong> in mining operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project needed to address:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ageing fuel infrastructure not aligned with current operational scale<\/li>\n\n\n\n<li>Limited real\u2011time visibility of fuel inventory and distribution<\/li>\n\n\n\n<li>Environmental risk associated with spills, losses, and containment failure<\/li>\n\n\n\n<li>Integration of modern control systems with legacy infrastructure<\/li>\n\n\n\n<li>Delivery within a <strong>live mining environment<\/strong> with zero tolerance for disruption<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Any failure in sequencing, commissioning, or environmental control would have had immediate operational and reputational impact.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The engagement encompassed <strong>end\u2011to\u2011end system leadership<\/strong>, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Comprehensive site audit of existing fuel infrastructure<\/li>\n\n\n\n<li>Engineering design of upgraded fuel storage and distribution systems<\/li>\n\n\n\n<li>Installation of modern monitoring and control platforms<\/li>\n\n\n\n<li>Integration with site SCADA systems<\/li>\n\n\n\n<li>Environmental protection and spill\u2011prevention measures<\/li>\n\n\n\n<li>Phased construction, commissioning, and operational handover<\/li>\n\n\n\n<li>Development of operational manuals and workforce training<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>risk\u2011led, operational\u2011first delivery model<\/strong> was applied\u2014recognising that fuel infrastructure must perform invisibly and reliably under continuous demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Whole\u2011System Assessment:<\/strong> Identification of capacity, control, and compliance gaps<\/li>\n\n\n\n<li><strong>Phased Implementation Planning:<\/strong> Sequencing works to protect uninterrupted mining operations<\/li>\n\n\n\n<li><strong>Operational Alignment:<\/strong> Close collaboration with BMA operations, maintenance, and safety teams<\/li>\n\n\n\n<li><strong>SCADA Integration:<\/strong> Deployment of real\u2011time monitoring and automated control for fuel inventory and distribution<\/li>\n\n\n\n<li><strong>Environmental Safeguards:<\/strong> Engineering of fail\u2011safe systems to prevent spills and fuel loss<\/li>\n\n\n\n<li><strong>Operational Enablement:<\/strong> Structured training and documentation to support long\u2011term reliability<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The emphasis throughout was on <strong>predictable system behaviour<\/strong>, not just infrastructure replacement.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Complexity &amp; Risk<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project sat at the intersection of several high\u2011risk considerations:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Live mine operations with no tolerance for downtime<\/li>\n\n\n\n<li>Hazardous material handling and environmental exposure<\/li>\n\n\n\n<li>Integration of modern control systems into legacy assets<\/li>\n\n\n\n<li>Tight delivery timeframes within an active production schedule<\/li>\n\n\n\n<li>Strict regulatory and safety compliance requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through disciplined planning, conservative sequencing, and continuous safety governance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Upgraded fuel storage and distribution infrastructure<\/li>\n\n\n\n<li>Advanced SCADA\u2011based monitoring and control systems<\/li>\n\n\n\n<li>Automated inventory tracking and distribution oversight<\/li>\n\n\n\n<li>Integrated spill\u2011prevention and environmental protection mechanisms<\/li>\n\n\n\n<li>Comprehensive operational manuals and staff training<\/li>\n\n\n\n<li>Full commissioning and compliant handover<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">All systems were validated under live operating conditions prior to final handover.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery &amp; Safety Performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>~26,000 work hours<\/strong><\/li>\n\n\n\n<li><strong>Zero Lost Time Injuries (LTI)<\/strong><\/li>\n\n\n\n<li><strong>One First Aid Incident (FAI)<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This outcome reflected disciplined safety leadership within a high\u2011risk operational environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The upgraded fuel farm:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Delivered robust, real\u2011time control and monitoring capability<\/li>\n\n\n\n<li>Enhanced operational visibility and fuel management efficiency<\/li>\n\n\n\n<li>Strengthened environmental compliance and spill\u2011prevention assurance<\/li>\n\n\n\n<li>Integrated seamlessly into site control systems<\/li>\n\n\n\n<li>Was delivered <strong>on time and within approved scope and budget<\/strong><\/li>\n\n\n\n<li>Maintained uninterrupted mining operations throughout execution<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">BMA gained a <strong>future\u2011ready fuel infrastructure platform<\/strong> aligned with operational scale and compliance expectations.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Why This Matters<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This project demonstrates a consistent capability across Murray\u2019s mining portfolio:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Ownership of high\u2011consequence infrastructure nodes<\/strong><\/li>\n\n\n\n<li><strong>Delivery within live production environments<\/strong><\/li>\n\n\n\n<li><strong>Integration of automation and control as risk\u2011reduction tools<\/strong><\/li>\n\n\n\n<li><strong>Safety and environmental assurance embedded by design<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Fuel systems are invisible when they work\u2014and immediately disruptive when they do not.<br>This engagement ensured reliability, compliance, and control <strong>without operational compromise<\/strong>.<\/p>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=4652\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BMA Goonyella Riverside Mine \u2013 Fuel Farm Upgrade, Control &amp; Monitoring Systems Client: BMA (BHP Mitsubishi Alliance)Location: Goonyella Riverside Mine, Queensland, AustraliaProject Period: 2013Project Type: Capital Project \u2013 Industrial Process InfrastructureSystem Scope: Fuel Storage, Distribution, Control &amp; MonitoringRole: Head Contractor [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4717,"parent":0,"menu_order":113,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4652","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Tax Regulation Compliance BMA - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4652\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Tax Regulation Compliance BMA - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"BMA Goonyella Riverside Mine \u2013 Fuel Farm Upgrade, Control &amp; Monitoring Systems Client: BMA (BHP Mitsubishi Alliance)Location: Goonyella Riverside Mine, Queensland, AustraliaProject Period: 2013Project Type: Capital Project \u2013 Industrial Process InfrastructureSystem Scope: Fuel Storage, Distribution, Control &amp; MonitoringRole: Head Contractor [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4652\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-08T23:45:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1858\" \/>\n\t<meta property=\"og:image:height\" content=\"723\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652\",\"name\":\"Empowering Tax Regulation Compliance BMA - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1\",\"datePublished\":\"2024-12-24T07:11:45+00:00\",\"dateModified\":\"2026-06-08T23:45:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1\",\"width\":1858,\"height\":723},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4652#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Tax Regulation Compliance BMA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Tax Regulation Compliance BMA - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4652","og_locale":"en_US","og_type":"article","og_title":"Empowering Tax Regulation Compliance BMA - Murray Slatter","og_description":"BMA Goonyella Riverside Mine \u2013 Fuel Farm Upgrade, Control &amp; Monitoring Systems Client: BMA (BHP Mitsubishi Alliance)Location: Goonyella Riverside Mine, Queensland, AustraliaProject Period: 2013Project Type: Capital Project \u2013 Industrial Process InfrastructureSystem Scope: Fuel Storage, Distribution, Control &amp; MonitoringRole: Head Contractor [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4652","og_site_name":"Murray Slatter","article_modified_time":"2026-06-08T23:45:52+00:00","og_image":[{"width":1858,"height":723,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4652","url":"https:\/\/murrayslatter.me\/?page_id=4652","name":"Empowering Tax Regulation Compliance BMA - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4652#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4652#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1","datePublished":"2024-12-24T07:11:45+00:00","dateModified":"2026-06-08T23:45:52+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4652#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4652"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4652#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1858%2C723&ssl=1","width":1858,"height":723},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4652#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Tax Regulation Compliance BMA"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4811,"url":"https:\/\/murrayslatter.me\/?page_id=4811","url_meta":{"origin":4652,"position":0},"title":"State\u2011Wide Implementation of Fuel Management Systems Across BMA Coal Operations","author":"Murray Slatter","date":"December 29, 2024","format":false,"excerpt":"Client: BMA CoalLocation: Queensland, Australia (multiple operating mine sites)Project Type: Advanced Mining Technology | Industrial Manufacturing | Software\u2011Integrated SolutionsProject Value: AUD $90 millionProject Duration: 2014 \u2013 2016 Strategic Objective BMA Coal required a consistent, scalable, and centrally governed fuel\u2011management capability deployed across its Queensland mining operations\u2014supporting safety, reliability, and operational\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4805,"url":"https:\/\/murrayslatter.me\/?page_id=4805","url_meta":{"origin":4652,"position":1},"title":"Empowering Advanced Manufacturing for Bespoke Large Scale Operations","author":"Murray Slatter","date":"December 29, 2024","format":false,"excerpt":"Program of sophisticated deployments, for BMA's Customised AdaptMac & AdaptIO Device Manufacturing Client: FluidIntrel (for BMA Coal)Location: Queensland, Australia (multiple BMA Coal sites)Project Type: Advanced Mining Technology | Industrial Manufacturing | Software\u2011Integrated SolutionsProject Value: AUD $21 millionProject Duration: 2014 Strategic Objective BMA Coal required a consistent, reliable, and site\u2011specific fuel\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/port-to-pit-640-wfukrrvgjjcj.png?fit=640%2C360&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/port-to-pit-640-wfukrrvgjjcj.png?fit=640%2C360&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/port-to-pit-640-wfukrrvgjjcj.png?fit=640%2C360&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":183,"url":"https:\/\/murrayslatter.me\/?page_id=183","url_meta":{"origin":4652,"position":2},"title":"BHP Billiton","author":"Murray Slatter","date":"January 25, 2017","format":false,"excerpt":"BHP \u2013 Engineering, Mining Development & Infrastructure Projects From 2004 to 2015, I worked closely with multiple BHP business units across Australia, delivering complex infrastructure and operational projects in partnership with their Engineering and Mining Development teams. For BHP Iron Ore (BHPIO):I led projects across WA and NT including the\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/05\/BHP-Billiton.png?fit=611%2C355&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/05\/BHP-Billiton.png?fit=611%2C355&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/05\/BHP-Billiton.png?fit=611%2C355&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":1276,"url":"https:\/\/murrayslatter.me\/?page_id=1276","url_meta":{"origin":4652,"position":3},"title":"BHP","author":"Murray Slatter","date":"March 8, 2020","format":false,"excerpt":"BHP \u2013 Engineering, Mining Development & Infrastructure Projects From 2004 to 2015, I worked closely with multiple BHP business units across Australia, delivering complex infrastructure and operational projects in partnership with their Engineering and Mining Development teams. For BHP Iron Ore (BHPIO):I led projects across WA and NT including the\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4649,"url":"https:\/\/murrayslatter.me\/?page_id=4649","url_meta":{"origin":4652,"position":4},"title":"Empowering Tax Regulation Compliance Yandi","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Iron Ore \u2013 Yandi Mine 500,000\u202fL Fuel Farm Installation, Control & Monitoring Client: BHPIO (BHP Iron Ore)Location: Yandi Mine, Pilbara, Western AustraliaProject Period: 2014Project Type: Capital Project \u2013 Industrial Process & Fuel InfrastructureSystem Scope: Bulk Fuel Storage, Distribution, Control & MonitoringRole: Head Contractor \u2013 Program Director Strategic Objective Yandi\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4647,"url":"https:\/\/murrayslatter.me\/?page_id=4647","url_meta":{"origin":4652,"position":5},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Iron Ore \u2013 Jimblebar Mine Fuel System Upgrade, Control & Monitoring Client: BHPIO (BHP Iron Ore)Location: Jimblebar Mine, Western AustraliaProject Period: 2014Project Type: Capital Project \u2013 Industrial Process & Fuel InfrastructureSystem Scope: Fuel Storage, Dispensing, Control & Remote MonitoringRole: Head Contractor \u2013 Program Director Strategic Objective Jimblebar is a\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4652"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4652\/revisions"}],"predecessor-version":[{"id":6269,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4652\/revisions\/6269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4717"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}