{"id":4649,"date":"2024-12-24T18:20:35","date_gmt":"2024-12-24T07:20:35","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4649"},"modified":"2024-12-24T18:22:33","modified_gmt":"2024-12-24T07:22:33","slug":"empowering-tax-regulation-compliance-bma2","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4649","title":{"rendered":"Empowering Tax Regulation Compliance  BMA2"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td>BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring<\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>BMA (BHP Mitsubishi Alliance)<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Capital Project \u2013 Industrial Process<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>$1,537,332<\/td><\/tr><tr><td><strong>Project Start and Finish<\/strong><\/td><td>2014 \u2013 2014<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To <strong>design, install, and commission a state-of-the-art 500,000-litre fuel farm infrastructure<\/strong>, ensuring operational reliability, safety, and real-time monitoring capabilities to optimize fuel supply and reduce operational risks.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>&#8211; Upgrade existing fuel systems to handle <strong>high-volume storage and distribution<\/strong> efficiently.<br>&#8211; Integrate <strong>real-time monitoring and control systems<\/strong> for better operational oversight.<br>&#8211; Mitigate <strong>environmental and safety risks<\/strong> associated with large-scale fuel storage.<br>&#8211; Ensure compliance with <strong>strict safety, operational, and environmental standards<\/strong>.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>&#8211; Conducted a <strong>comprehensive site assessment and needs analysis<\/strong>.<br>&#8211; Collaborated with <strong>BMA operational teams<\/strong> to align design with functional goals.<br>&#8211; Implemented <strong>modular fuel storage systems<\/strong> to reduce installation time and improve scalability.<br>&#8211; Installed <strong>automated SCADA-based monitoring systems<\/strong> for real-time tracking and control.<br>&#8211; Delivered <strong>training and operational handover sessions<\/strong> for on-site personnel.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Installation of <strong>500,000-litre fuel storage tanks<\/strong> with high-capacity distribution systems.<br>&#8211; Deployment of <strong>SCADA-based control systems<\/strong> for real-time fuel monitoring and inventory management.<br>&#8211; Integration of <strong>safety and compliance mechanisms<\/strong> to prevent leaks, overflows, and fuel losses.<br>&#8211; Delivered <strong>detailed technical documentation and operational training<\/strong> for seamless handover.<br>&#8211; Implemented <strong>fail-safe emergency protocols<\/strong> to mitigate risks.<\/td><\/tr><tr><td><strong>Risks and Challenges<\/strong><\/td><td>&#8211; Ensuring <strong>zero operational downtime<\/strong> during the installation and commissioning phases.<br>&#8211; Addressing <strong>safety concerns<\/strong> associated with high-volume fuel storage and handling.<br>&#8211; Managing compliance with <strong>environmental and safety regulations<\/strong>.<br>&#8211; Balancing project timelines and budget constraints while ensuring high-quality delivery.<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>&#8211; Delivered a <strong>fully functional 500,000-litre fuel farm infrastructure<\/strong>.<br>&#8211; Achieved <strong>real-time monitoring and control<\/strong> capabilities for improved fuel management.<br>&#8211; Enhanced <strong>safety protocols and environmental compliance<\/strong>.<br>&#8211; Delivered the project <strong>on time and within budget<\/strong>, achieving all key performance indicators.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; <strong>Technological Integration:<\/strong> Advanced SCADA systems enabled precise fuel monitoring and control.<br>&#8211; <strong>Operational Continuity:<\/strong> Ensured zero downtime during implementation.<br>&#8211; <strong>Environmental Compliance:<\/strong> Designed and executed the project adhering to stringent environmental and safety standards.<br>&#8211; <strong>Scalable Infrastructure:<\/strong> Built a robust and scalable fuel storage system to support future operational growth.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Check out more about the industries I have served : <a href=\"https:\/\/murrayslatter.me\/?page_id=717\">Here<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">I led the development and execution of the project as Head Contractor Program Director\/delivery team.<\/h4>\n\n\n\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"> led the development and execution of the project as Head Contractor Program Director\/delivery team.<\/h4>\n\n\n\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Lead Solutions Engineer <\/li>\n\n\n\n<li>4 x Solutions Integrators\/Designers,<\/li>\n\n\n\n<li>1 x Process and Control Implementation Engineer<\/li>\n<\/ul>\n\n\n\n<p><strong>Construction <\/strong>for the Construction project the team will consist of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Project Manager<\/li>\n\n\n\n<li>1 x Construction Engineer<\/li>\n\n\n\n<li>1 x Contracts Manager<\/li>\n\n\n\n<li>1 x Quality Manager<\/li>\n\n\n\n<li>1 x Safety Manager<\/li>\n\n\n\n<li>1 x MEP Fabrication and Installation Contractor<\/li>\n\n\n\n<li>1 x Mechanical systems Fabrication contractors<\/li>\n\n\n\n<li>1 x Tanks and Tanking contractor<\/li>\n\n\n\n<li>7 x Functional Suppliers <\/li>\n\n\n\n<li>1 x Electrical contractor<\/li>\n<\/ul>\n\n\n\n<p>Project was completed with 26,000 hrs with ZERO LTI and 1 x FAI<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project Name BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Client Company BMA (BHP Mitsubishi Alliance) Project Type Capital Project \u2013 Industrial Process Project Value $1,537,332 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4726,"parent":0,"menu_order":35,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4649","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Tax Regulation Compliance BMA2 - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4649\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Tax Regulation Compliance BMA2 - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project Name BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Client Company BMA (BHP Mitsubishi Alliance) Project Type Capital Project \u2013 Industrial Process Project Value $1,537,332 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4649\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-24T07:22:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"410\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649\",\"name\":\"Empowering Tax Regulation Compliance BMA2 - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/daunia-coal-mine.jpg?fit=1920%2C410&ssl=1\",\"datePublished\":\"2024-12-24T07:20:35+00:00\",\"dateModified\":\"2024-12-24T07:22:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/daunia-coal-mine.jpg?fit=1920%2C410&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/daunia-coal-mine.jpg?fit=1920%2C410&ssl=1\",\"width\":1920,\"height\":410},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4649#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Tax Regulation Compliance BMA2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Tax Regulation Compliance BMA2 - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4649","og_locale":"en_US","og_type":"article","og_title":"Empowering Tax Regulation Compliance BMA2 - Murray Slatter","og_description":"BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project Name BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Client Company BMA (BHP Mitsubishi Alliance) Project Type Capital Project \u2013 Industrial Process Project Value $1,537,332 [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=4649","og_site_name":"Murray Slatter","article_modified_time":"2024-12-24T07:22:33+00:00","og_image":[{"width":1920,"height":410,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4649","url":"https:\/\/murrayslatter.me\/?page_id=4649","name":"Empowering Tax Regulation Compliance BMA2 - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4649#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4649#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1920%2C410&ssl=1","datePublished":"2024-12-24T07:20:35+00:00","dateModified":"2024-12-24T07:22:33+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4649#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4649"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4649#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1920%2C410&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1920%2C410&ssl=1","width":1920,"height":410},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4649#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Tax Regulation Compliance BMA2"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4652,"url":"https:\/\/murrayslatter.me\/?page_id=4652","url_meta":{"origin":4649,"position":0},"title":"Empowering Tax Regulation Compliance BMA","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$3,3m Project Start and Finish2013 \u2013 2013Strategic ObjectiveTo design, install, and commission an upgraded fuel storage,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":592,"url":"https:\/\/murrayslatter.me\/?page_id=592","url_meta":{"origin":4649,"position":1},"title":"RTIO &#8211; HCO Fuel Farm","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, bund installation, water treatment\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4647,"url":"https:\/\/murrayslatter.me\/?page_id=4647","url_meta":{"origin":4649,"position":2},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and Monitoring Project NameBHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and MonitoringClient CompanyBHPIO (BHP Iron Ore)Project TypeCapital Project \u2013 Industrial ProcessProject Value$6,602,025Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo upgrade and optimize the fuel system infrastructure at Jimblebar Mine Site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4648,"url":"https:\/\/murrayslatter.me\/?page_id=4648","url_meta":{"origin":4649,"position":3},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Orebody24 Light Vehicles & Heavy Vehicles Fuel Systems Installations Project NameOrebody24 Light Vehicles & Heavy Vehicles Fuel Systems InstallationsClient CompanyBHPIOProject TypeCapital Project \u2013 Industrial ProcessProject Value$3,7mProject Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission advanced fuel systems for both light and heavy vehicles at the Orebody24 mine site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4811,"url":"https:\/\/murrayslatter.me\/?page_id=4811","url_meta":{"origin":4649,"position":4},"title":"Program of Industrial Implementation","author":"Murray Slatter","date":"December 29, 2024","format":false,"excerpt":"Developing a program of major implemenations of Site Fuel System across all BMA Coal sites in Queensland, exemplify the integration of Piping, Tanking, Electrical Control, Instrumentation integration, custom-manufactured switchboards, and innovative AdaptMac computer terminals. My analytical skills, advanced knowledge of Design, Manufacturing and Implemenation initiatives addressed operational complexities through tailored\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BMA-Refueling-pods.jpg?fit=700%2C450&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":589,"url":"https:\/\/murrayslatter.me\/?page_id=589","url_meta":{"origin":4649,"position":5},"title":"RTIO &#8211; Trip Services Facility","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the Locomotive Trip Services and refuelling facility to the Rio Tinto Cape Lambert facility. Works include, construction of Locomotive shed, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, water treatment and tailing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4649"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4649\/revisions"}],"predecessor-version":[{"id":4729,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4649\/revisions\/4729"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4726"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}