{"id":4645,"date":"2025-01-23T07:22:10","date_gmt":"2025-01-22T20:22:10","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4645"},"modified":"2025-01-23T07:27:11","modified_gmt":"2025-01-22T20:27:11","slug":"empowering-banking-excellence","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4645","title":{"rendered":"Empowering Banking Excellence"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Singapore MBFC Level 6 \u2013 Floor Fit-Out<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>1) Project Name<\/strong><\/td><td>Singapore MBFC Level 6 \u2013 Floor Fit-Out<\/td><\/tr><tr><td><strong>2) Client Company<\/strong><\/td><td>Barclays<\/td><\/tr><tr><td><strong>3) Project Type<\/strong><\/td><td>Capital Project \u2013 Renovation (REIT)<\/td><\/tr><tr><td><strong>4) Project Value<\/strong><\/td><td>$27,909,000<\/td><\/tr><tr><td><strong>5) Project Start and Finish<\/strong><\/td><td>2017 \u2013 2017<\/td><\/tr><tr><td><strong>6) Strategic Objective<\/strong><\/td><td>To deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs while enhancing productivity, collaboration, and user experience.<\/td><\/tr><tr><td><strong>7) The Challenge \/ Need<\/strong><\/td><td>&#8211; Relocate multiple administrative functions without operational disruption.<br>&#8211; Create optimized workspace layouts to support evolving organizational needs.<br>&#8211; Ensure alignment with Barclays&#8217; global design and compliance standards.<br>&#8211; Implement robust IT infrastructure and ergonomic design principles.<\/td><\/tr><tr><td><strong>8) Our Approach<\/strong><\/td><td>&#8211; Conducted <strong>comprehensive needs analysis<\/strong> to define functional and operational requirements.<br>&#8211; Collaborated with stakeholders to integrate feedback into the final design.<br>&#8211; Applied <strong>zoning principles<\/strong> for administrative, operational, and collaborative spaces.<br>&#8211; Integrated <strong>advanced IT infrastructure<\/strong> and environmental controls for operational efficiency.<br>&#8211; Implemented <strong>flexible workspace layouts<\/strong> to accommodate future growth and adaptability.<\/td><\/tr><tr><td><strong>9) Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Delivered <strong>optimized workspace layouts<\/strong> balancing individual, collaborative, and administrative areas.<br>&#8211; Integrated <strong>state-of-the-art IT infrastructure<\/strong> to support data security and operational resilience.<br>&#8211; Established <strong>secure access protocols<\/strong> across all functional zones.<br>&#8211; Delivered <strong>sustainable design features<\/strong>, including energy-efficient lighting and HVAC systems.<br>&#8211; Comprehensive <strong>operational handover documentation<\/strong> and user training sessions.<\/td><\/tr><tr><td><strong>10) Risks and Challenges<\/strong><\/td><td>&#8211; Managing the relocation of critical administrative functions without disrupting business operations.<br>&#8211; Addressing diverse stakeholder needs while maintaining global compliance standards.<br>&#8211; Balancing tight project timelines and budgets with high-end design and technical requirements.<br>&#8211; Ensuring seamless integration of IT and security systems.<\/td><\/tr><tr><td><strong>11) Result \/ Outcome<\/strong><\/td><td>&#8211; Successfully delivered a <strong>multi-functional floor fit-out<\/strong> aligned with Barclays&#8217; global standards.<br>&#8211; Enhanced <strong>operational efficiency<\/strong> through optimized workspace designs.<br>&#8211; Improved <strong>staff satisfaction and productivity<\/strong> with ergonomic design and collaborative spaces.<br>&#8211; Delivered the project <strong>on time and within budget<\/strong>, exceeding quality and operational expectations.<\/td><\/tr><tr><td><strong>12) Our Value-Added Differentiator<\/strong><\/td><td>&#8211; <strong>Stakeholder Alignment:<\/strong> Proactively engaged with stakeholders to ensure alignment with functional and operational goals.<br>&#8211; <strong>Sustainable Design:<\/strong> Implemented energy-efficient HVAC and lighting systems.<br>&#8211; <strong>Scalable Infrastructure:<\/strong> Designed adaptable workspaces capable of accommodating future organizational growth.<br>&#8211; <strong>Operational Continuity:<\/strong> Managed the transition seamlessly without disrupting day-to-day administrative operations.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Check out more about the industries I have served : <a href=\"https:\/\/murrayslatter.me\/?page_id=717\">Here<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">I led the development and execution of the project as Head Contractor Program Director\/delivery team.<\/h4>\n\n\n\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Lead designer<\/li>\n\n\n\n<li>8 x Engineers,<\/li>\n\n\n\n<li>10 x Drafters<\/li>\n\n\n\n<li>1 x BMS designer\/engineer<\/li>\n<\/ul>\n\n\n\n<p><strong>Construction <\/strong>for the Construction project the team will consist of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 x Project Manager<\/li>\n\n\n\n<li>1 x Construction Engineer<\/li>\n\n\n\n<li>1 x Contracts Manager<\/li>\n\n\n\n<li>1 x Quality Manager<\/li>\n\n\n\n<li>1 x Safety Manager<\/li>\n\n\n\n<li>15 x Sub contractors (Various)<\/li>\n\n\n\n<li>23 x Functional Suppliers (Various)<\/li>\n\n\n\n<li>1 x Construction Manager<\/li>\n<\/ul>\n\n\n\n<p>Project was completed with 126,000 hrs with ZERO LTI and 1 x FAI<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Singapore MBFC Level 6 \u2013 Floor Fit-Out 1) Project Name Singapore MBFC Level 6 \u2013 Floor Fit-Out 2) Client Company Barclays 3) Project Type Capital Project \u2013 Renovation (REIT) 4) Project Value $27,909,000 5) Project Start and Finish 2017 \u2013 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5029,"parent":0,"menu_order":25,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4645","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Banking Excellence - Murray Slatter<\/title>\n<meta name=\"description\" content=\"deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4645\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Banking Excellence - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4645\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-22T20:27:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645\",\"name\":\"Empowering Banking Excellence - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/IMG_0680.webp?fit=400%2C350&ssl=1\",\"datePublished\":\"2025-01-22T20:22:10+00:00\",\"dateModified\":\"2025-01-22T20:27:11+00:00\",\"description\":\"deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/IMG_0680.webp?fit=400%2C350&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/IMG_0680.webp?fit=400%2C350&ssl=1\",\"width\":400,\"height\":350},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4645#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Banking Excellence\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Banking Excellence - Murray Slatter","description":"deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4645","og_locale":"en_US","og_type":"article","og_title":"Empowering Banking Excellence - Murray Slatter","og_description":"deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs","og_url":"https:\/\/murrayslatter.me\/?page_id=4645","og_site_name":"Murray Slatter","article_modified_time":"2025-01-22T20:27:11+00:00","og_image":[{"width":400,"height":350,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4645","url":"https:\/\/murrayslatter.me\/?page_id=4645","name":"Empowering Banking Excellence - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4645#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4645#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp?fit=400%2C350&ssl=1","datePublished":"2025-01-22T20:22:10+00:00","dateModified":"2025-01-22T20:27:11+00:00","description":"deliver a fully integrated, multi-functional floor fit-out that aligns operational, administrative, and workspace needs","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4645#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4645"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4645#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp?fit=400%2C350&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/IMG_0680.webp?fit=400%2C350&ssl=1","width":400,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4645#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Banking Excellence"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":4974,"url":"https:\/\/murrayslatter.me\/?page_id=4974","url_meta":{"origin":4645,"position":0},"title":"Citibank 1 Bay East Hong Kong","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"The Citibank 1 Bay East Fitout project transformed workplace design in Hong Kong, delivering flexible, sustainable workspaces with advanced technology integration. Achieving WELL, RESET, and LEED Platinum certifications, the project set a global benchmark for environmental and operational excellence in corporate office design. Project NameCitibank 1 Bay East FitoutClient CompanyCitibankProject\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4978,"url":"https:\/\/murrayslatter.me\/?page_id=4978","url_meta":{"origin":4645,"position":1},"title":"Barclays 1 Church Hill Place Fitout","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"The Barclays 1 Church Hill Place Fitout project involved delivering a world-class workspace across 33 floors, integrating advanced technology, sustainable infrastructure, and flexible office environments. Executed seamlessly alongside shell and core construction, the project met stringent timelines and operational requirements, exceeding client expectations. Project NameBarclays 1 Church Hill Place FitoutClient\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/Barclays-1-CH-Place.jpg?fit=671%2C384&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":788,"url":"https:\/\/murrayslatter.me\/?page_id=788","url_meta":{"origin":4645,"position":2},"title":"Defence &#8211; Empowering Safer defence facilities","author":"Murray Slatter","date":"January 6, 2019","format":false,"excerpt":"Project NameMilitary Police Central Administration Fit-OutClient CompanyDefence \u2013 Holsworthy, NSWProject TypeCapital Project \u2013 RenovationProject Value$5mProject Start and FinishJune 2003 - December 2004Strategic ObjectiveTo design and construct a state-of-the-art central administration facility for the Military Police (MP), supporting rehabilitation-focused operations, integrating advanced security systems, and creating a functional yet aesthetically empowering\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Holsworthy-Army-Barracks-171-Squadron-1-e1734164882382.jpg?fit=478%2C294&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":792,"url":"https:\/\/murrayslatter.me\/?page_id=792","url_meta":{"origin":4645,"position":3},"title":"Transport &#8211; Empowering safer air travel","author":"Murray Slatter","date":"October 29, 2018","format":false,"excerpt":"This project was set out to revolutionize the air transport industry by empowering comprehencive access to all aircraft maintenance functions through superior accessibility options to perform all maintenance functions on the new A380 enabling safer and more efficient operations across all major maintenance functions. What sets this project apart was\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/aircraft.png?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":589,"url":"https:\/\/murrayslatter.me\/?page_id=589","url_meta":{"origin":4645,"position":4},"title":"RTIO &#8211; Trip Services Facility","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the Locomotive Trip Services and refuelling facility to the Rio Tinto Cape Lambert facility. Works include, construction of Locomotive shed, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, water treatment and tailing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":222,"url":"https:\/\/murrayslatter.me\/?page_id=222","url_meta":{"origin":4645,"position":5},"title":"Protecting National Assets &#8211; Sydney Opera House","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"In response to heightened global security risks post-9\/11 and Iraq war protests, the Sydney Opera House embarked on a transformative upgrade to its security, CCTV, and Building Management Systems. Our team delivered a seamless integration of advanced technologies while preserving the operational integrity of this world-renowned cultural landmark. FieldDetails1) Project\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4645"}],"version-history":[{"count":2,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4645\/revisions"}],"predecessor-version":[{"id":5030,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4645\/revisions\/5030"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/5029"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}