{"id":4610,"date":"2024-12-22T21:31:33","date_gmt":"2024-12-22T10:31:33","guid":{"rendered":"https:\/\/murrayslatter.me\/?page_id=4610"},"modified":"2026-06-07T10:09:14","modified_gmt":"2026-06-07T00:09:14","slug":"afl-data-centre-design-and-construct","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=4610","title":{"rendered":"AFL Data Centre Design and Construct"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Network Ten (AFL Broadcast Consortium: Network Ten, Channel Nine &amp; Foxtel)<br><strong>Location:<\/strong> Australia<br><strong>Project Type:<\/strong> Critical Environments \u2013 Data Centre (Design &amp; Construct)<br><strong>Project Value:<\/strong> AUD $12 million<br><strong>Project Duration:<\/strong> June 2001 \u2013 January 2002<br><strong>Role:<\/strong> Design &amp; Construct Delivery Lead (Program Leadership)<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In 2001, Network Ten, Channel Nine, and Foxtel secured the AFL broadcast rights under a landmark <strong>$500 million, five\u2011year agreement (2002\u20132006)<\/strong>\u2014a decisive shift from the previous single\u2011network model.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This change created an immediate, non\u2011negotiable requirement: a <strong>high\u2011availability, broadcast\u2011grade data centre<\/strong> capable of supporting live AFL operations, content distribution, analytics, and digital services across free\u2011to\u2011air and pay\u2011TV platforms.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective was to <strong>engineer and construct a resilient, secure, and scalable data centre<\/strong> that could operate without interruption during live national broadcasts\u2014while providing headroom for rapid growth in digital demand.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The AFL\u2019s existing data infrastructure was not fit for purpose in a multi\u2011broadcaster, always\u2011on environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key challenges included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Legacy infrastructure unable to support increased digital and broadcast demand<\/li>\n\n\n\n<li>Zero tolerance for outage during live AFL matches<\/li>\n\n\n\n<li>Requirement for high levels of redundancy, security, and operational resilience<\/li>\n\n\n\n<li>Tight delivery timeframe aligned to the commencement of the 2002 AFL season<\/li>\n\n\n\n<li>Integration with existing broadcast and IT systems across multiple stakeholders<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Failure was not an option\u2014this was <strong>national broadcast infrastructure under public scrutiny<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Design &amp; Construct engagement covered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>End\u2011to\u2011end data centre design<\/li>\n\n\n\n<li>Construction and fit\u2011out of critical environments<\/li>\n\n\n\n<li>Power, cooling, and redundancy systems<\/li>\n\n\n\n<li>Security and access control<\/li>\n\n\n\n<li>Integration with AFL broadcast and IT operations<\/li>\n\n\n\n<li>Testing, commissioning, and operational handover<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>critical\u2011systems, resilience\u2011first delivery model<\/strong> was applied\u2014focused on certainty, uptime, and operational clarity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Stakeholder Alignment:<\/strong> Close collaboration with AFL IT leadership, Network Ten, and broadcast stakeholders to align operational needs and performance criteria<\/li>\n\n\n\n<li><strong>Architecture\u2011Led Design:<\/strong> Data centre layout and systems engineered around redundancy, scalability, and maintainability<\/li>\n\n\n\n<li><strong>Resilience by Design:<\/strong> Power, cooling, and network architectures designed to tolerate component failure without service interruption<\/li>\n\n\n\n<li><strong>Security Integration:<\/strong> Multi\u2011layered physical and systems security protecting sensitive broadcast and operational data<\/li>\n\n\n\n<li><strong>Design &amp; Construct Discipline:<\/strong> Single\u2011point accountability to compress timelines and eliminate interface risk<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The guiding principle was simple: <strong>design for live broadcast reality, not theoretical uptime<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks requiring deliberate management included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Integration of new data centre infrastructure with existing AFL systems<\/li>\n\n\n\n<li>Compressed delivery timeframe driven by broadcast commitments<\/li>\n\n\n\n<li>Ensuring regulatory and industry compliance for critical infrastructure<\/li>\n\n\n\n<li>Managing commissioning risk ahead of live operational cut\u2011over<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through early systems integration planning, staged testing, and disciplined commissioning.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A purpose\u2011built, broadcast\u2011grade AFL data centre<\/li>\n\n\n\n<li>High\u2011availability power and cooling systems with built\u2011in redundancy<\/li>\n\n\n\n<li>Secure access control and monitored environments<\/li>\n\n\n\n<li>Infrastructure supporting live streaming, analytics, and digital operations<\/li>\n\n\n\n<li>Fully commissioned systems ready for live AFL broadcast operations<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project achieved:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Delivery of a fully operational data centre <strong>ahead of the 2002 AFL season<\/strong><\/li>\n\n\n\n<li>Reliable, uninterrupted support for national live broadcasts<\/li>\n\n\n\n<li>Improved digital capability and operational resilience for AFL operations<\/li>\n\n\n\n<li>Compliance with regulatory and industry standards<\/li>\n\n\n\n<li>Confidence for broadcasters and stakeholders in AFL\u2019s digital backbone<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The AFL gained a <strong>future\u2011ready data infrastructure<\/strong> capable of supporting evolving broadcast and digital demands.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Critical Environments Expertise:<\/strong> Data centres designed for real\u2011world broadcast consequences<\/li>\n\n\n\n<li><strong>Single\u2011Point Accountability:<\/strong> Design &amp; Construct delivery eliminating interface risk<\/li>\n\n\n\n<li><strong>Resilience\u2011First Architecture:<\/strong> Uptime and redundancy engineered from first principles<\/li>\n\n\n\n<li><strong>Operational Empathy:<\/strong> Systems designed around live broadcast workflows<\/li>\n\n\n\n<li><strong>Schedule Certainty:<\/strong> Delivery aligned to immovable broadcast deadlines<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=4610\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client: Network Ten (AFL Broadcast Consortium: Network Ten, Channel Nine &amp; Foxtel)Location: AustraliaProject Type: Critical Environments \u2013 Data Centre (Design &amp; Construct)Project Value: AUD $12 millionProject Duration: June 2001 \u2013 January 2002Role: Design &amp; Construct Delivery Lead (Program Leadership) Strategic [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4611,"parent":0,"menu_order":18,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-4610","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>AFL Data Centre Design and Construct - Murray Slatter<\/title>\n<meta name=\"description\" content=\"In 2001, a consortium of Ten, Nine and Foxtel, won the broadcast rights to the AFL. I ran Design and Construct project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=4610\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AFL Data Centre Design and Construct - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"In 2001, a consortium of Ten, Nine and Foxtel, won the broadcast rights to the AFL. I ran Design and Construct project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=4610\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-07T00:09:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Data_center.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"995\" \/>\n\t<meta property=\"og:image:height\" content=\"415\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610\",\"name\":\"AFL Data Centre Design and Construct - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Data_center.jpg?fit=995%2C415&ssl=1\",\"datePublished\":\"2024-12-22T10:31:33+00:00\",\"dateModified\":\"2026-06-07T00:09:14+00:00\",\"description\":\"In 2001, a consortium of Ten, Nine and Foxtel, won the broadcast rights to the AFL. I ran Design and Construct project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Data_center.jpg?fit=995%2C415&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Data_center.jpg?fit=995%2C415&ssl=1\",\"width\":995,\"height\":415},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=4610#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AFL Data Centre Design and Construct\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AFL Data Centre Design and Construct - Murray Slatter","description":"In 2001, a consortium of Ten, Nine and Foxtel, won the broadcast rights to the AFL. I ran Design and Construct project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=4610","og_locale":"en_US","og_type":"article","og_title":"AFL Data Centre Design and Construct - Murray Slatter","og_description":"In 2001, a consortium of Ten, Nine and Foxtel, won the broadcast rights to the AFL. I ran Design and Construct project.","og_url":"https:\/\/murrayslatter.me\/?page_id=4610","og_site_name":"Murray Slatter","article_modified_time":"2026-06-07T00:09:14+00:00","og_image":[{"width":995,"height":415,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Data_center.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=4610","url":"https:\/\/murrayslatter.me\/?page_id=4610","name":"AFL Data Centre Design and Construct - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=4610#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=4610#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Data_center.jpg?fit=995%2C415&ssl=1","datePublished":"2024-12-22T10:31:33+00:00","dateModified":"2026-06-07T00:09:14+00:00","description":"In 2001, a consortium of Ten, Nine and Foxtel, won the broadcast rights to the AFL. I ran Design and Construct project.","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=4610#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=4610"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=4610#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Data_center.jpg?fit=995%2C415&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Data_center.jpg?fit=995%2C415&ssl=1","width":995,"height":415},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=4610#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"AFL Data Centre Design and Construct"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":228,"url":"https:\/\/murrayslatter.me\/?page_id=228","url_meta":{"origin":4610,"position":0},"title":"Australian Data Centre&#8217;s &#8211; Best in Class","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"Network Ten \u2013 Digital Playout & Broadcast Data Centre Transformation Client: Network Ten AustraliaLocation: Sydney, AustraliaProject Type: Capital Project \u2013 Broadcast Systems & Data Centre TransformationProject Period: Early Digital Television Transition Era (1999-2003)Role: Program Director \u2013 Design, Implementation & Commissioning Strategic Objective At the dawn of the digital television revolution,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Data-Centre-Eastern-Creak-e1734164807547.jpg?fit=415%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4625,"url":"https:\/\/murrayslatter.me\/?page_id=4625","url_meta":{"origin":4610,"position":1},"title":"Equipping the Digital Television Era (DTV) &amp; Critical Environments Program","author":"Murray Slatter","date":"December 22, 2024","format":false,"excerpt":"Client: Network TenLocation: National \u2013 Australia (11 operational sites, 12 properties)Project Type: Capital Project \u2013 Digital Television Data Centres & Critical EnvironmentsProject Value: AUD $40 millionProject Duration: January 2001 \u2013 June 2002Role: Program Leadership | Design & Construct Delivery Lead Strategic Objective After 46 years of analogue television, Network Ten\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DSC.jpg?fit=900%2C900&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4617,"url":"https:\/\/murrayslatter.me\/?page_id=4617","url_meta":{"origin":4610,"position":2},"title":"Empowering News Broadcasts","author":"Murray Slatter","date":"December 22, 2024","format":false,"excerpt":"Client: Network TenLocation: Saunders Street, Sydney, NSWProject Type: Capital Project \u2013 Broadcast Studio Fit\u2011Out (CRE)Project Value: AUD $3 millionProject Duration: 2001Role: Design & Construct Delivery Lead Strategic Objective As Network Ten relocated its Sydney operations to the Saunders Street facility, leadership required a new flagship news studio that could support\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Studio-101.jpeg?fit=1024%2C576&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Studio-101.jpeg?fit=1024%2C576&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Studio-101.jpeg?fit=1024%2C576&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Studio-101.jpeg?fit=1024%2C576&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":798,"url":"https:\/\/murrayslatter.me\/?page_id=798","url_meta":{"origin":4610,"position":3},"title":"Empowering Digital TV Transformation","author":"Murray Slatter","date":"October 29, 2018","format":false,"excerpt":"National Digital Television Transition Program of Change (DTV) Client: Network 10 Location: National \u2013 Australia (11 transmission sites, 12 properties) Project Type: Critical Environments \u2013 Data Centres & Transmission Systems Project Value: AUD $32 million Project Duration: 1999 \u2013 2022 Strategic Objective After 46 years of analogue television creation, aggregation,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/8956130-3x2-940x627-1.jpg?fit=940%2C627&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/8956130-3x2-940x627-1.jpg?fit=940%2C627&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/8956130-3x2-940x627-1.jpg?fit=940%2C627&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/8956130-3x2-940x627-1.jpg?fit=940%2C627&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":218,"url":"https:\/\/murrayslatter.me\/?page_id=218","url_meta":{"origin":4610,"position":4},"title":"Broadcast Television &#8211; A new Era &#8211; DigitalTV","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"As a second stage to the National Digital Television Initiative, Network Ten centralised its national operations into three key time zone locations, engaging the internal Engineering team to execute the Centralisation. Several complex IT Information systems and data warehouses systems were built inside the existing properties, requiring 7 department moves\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6323,"url":"https:\/\/murrayslatter.me\/?page_id=6323","url_meta":{"origin":4610,"position":5},"title":"Denman District Performance Centre Redevelopment (2020)","author":"Murray Slatter","date":"June 23, 2026","format":false,"excerpt":"Project Overview Client: Muswellbrook Council Location: Denman, NSW Project Type: Public \/ Community Infrastructure \u2013 Redevelopment Contract Type: Design & Construct Project Value: AUD 3M Duration: 8 months Sector: Civic \/ Community Strategic Objective Following a catastrophic fire in 2015, the objective of the project was to restore and modernise\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/Denman.jpg?fit=1200%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/Denman.jpg?fit=1200%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/Denman.jpg?fit=1200%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/Denman.jpg?fit=1200%2C529&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/Denman.jpg?fit=1200%2C529&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4610"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4610\/revisions"}],"predecessor-version":[{"id":6230,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/4610\/revisions\/6230"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4611"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}