{"id":278,"date":"2017-02-26T00:51:12","date_gmt":"2017-02-26T00:51:12","guid":{"rendered":"http:\/\/www.q3ed.com\/?page_id=278"},"modified":"2024-12-24T20:00:13","modified_gmt":"2024-12-24T09:00:13","slug":"african-minerals-ltd-sierra-leone-ship-loading-facility","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=278","title":{"rendered":"Empowering Faltering Nations back to Prosperity"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Sierra Leone Ship loading facility<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Pepel Transhipment Facility Upgrade and Rebirth project exemplifies innovation, precision, and resilience in delivering industrial infrastructure solutions under extreme constraints. Tasked with retrofitting a long-abandoned transshipment facility in Sierra Leone, Qfactor overcame logistical, structural, and operational challenges to deliver a fully functional system within record time and under budget.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Name<\/strong><\/td><td>Pepel Transhipment Facility Upgrade and Rebirth<\/td><\/tr><tr><td><strong>Client Company<\/strong><\/td><td>London Mining Ltd<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Capital Project &#8211; Industrial Process<\/td><\/tr><tr><td><strong>Project Value<\/strong><\/td><td>$22m<\/td><\/tr><tr><td><strong>Project Start AND PROJECT FINISH<\/strong><\/td><td>2009 &#8211; 2010<\/td><\/tr><tr><td><strong>Strategic Objective<\/strong><\/td><td>To rehabilitate and retrofit an abandoned transshipment facility, enabling it to resume iron ore export operations and kick-start Sierra Leone&#8217;s iron ore industry.<\/td><\/tr><tr><td><strong>The Challenge \/ Need<\/strong><\/td><td>The facility had been non-operational for 25 years due to the Civil War, with no maintenance. The client required a rapid retrofit within an ambitious nine-month timeframe, 4,000 km from Qfactor&#8217;s operational base, while meeting stringent quality, safety, and operational metrics.<\/td><\/tr><tr><td><strong>Our Approach<\/strong><\/td><td>&#8211; Conducted a Structural, Mechanical, and Electrical (SME) assessment of the facility.<br>&#8211; Developed a comprehensive project execution plan tailored to site-specific design criteria.<br>&#8211; Led custom design, fabrication, erection, and commissioning phases.<br>&#8211; Collaborated with specialist engineers and teams for accelerated delivery.<\/td><\/tr><tr><td><strong>Solution &amp; Key Deliverables<\/strong><\/td><td>&#8211; Structural, Mechanical, and Electrical upgrades.<br>&#8211; Retrofit and commissioning of transshipment facility.<br>&#8211; Accelerated execution timeline (first ore shipped within 26 days).<br>&#8211; Delivered project under budget by 3% while meeting all quality metrics on the first attempt.<\/td><\/tr><tr><td><strong>Risks and Challenges<\/strong><\/td><td>&#8211; Remote project site located 4,000 km from Johannesburg.<br>&#8211; Facility remained non-functional and unmaintained for 25 years.<br>&#8211; Tight nine-month project timeframe.<br>&#8211; Logistical complexities with international procurement and mobilization of skilled labor.<\/td><\/tr><tr><td><strong>Result \/ Outcome<\/strong><\/td><td>&#8211; Facility operational within 26 days of site mobilization.<br>&#8211; First shipment of hematite iron ore successfully delivered to a European buyer.<br>&#8211; Project delivered under budget and met quality standards on the first attempt.<\/td><\/tr><tr><td><strong>Our Value-Added Differentiator<\/strong><\/td><td>&#8211; Expertise in remote, high-risk industrial retrofitting projects.<br>&#8211; Agile project management ensuring accelerated timelines and budget control.<br>&#8211; Collaborative approach integrating multi-disciplinary teams.<br>&#8211; Delivered operational readiness with zero compromise on safety and quality.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sierra Leone Ship loading facility The Pepel Transhipment Facility Upgrade and Rebirth project exemplifies innovation, precision, and resilience in delivering industrial infrastructure solutions under extreme constraints. Tasked with retrofitting a long-abandoned transshipment facility in Sierra Leone, Qfactor overcame logistical, structural, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4774,"parent":0,"menu_order":35,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-278","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Faltering Nations back to Prosperity - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=278\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Faltering Nations back to Prosperity - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Sierra Leone Ship loading facility The Pepel Transhipment Facility Upgrade and Rebirth project exemplifies innovation, precision, and resilience in delivering industrial infrastructure solutions under extreme constraints. Tasked with retrofitting a long-abandoned transshipment facility in Sierra Leone, Qfactor overcame logistical, structural, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=278\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-24T09:00:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"777\" \/>\n\t<meta property=\"og:image:height\" content=\"395\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278\",\"name\":\"Empowering Faltering Nations back to Prosperity - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/pepel.jpg?fit=777%2C395&ssl=1\",\"datePublished\":\"2017-02-26T00:51:12+00:00\",\"dateModified\":\"2024-12-24T09:00:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/pepel.jpg?fit=777%2C395&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/pepel.jpg?fit=777%2C395&ssl=1\",\"width\":777,\"height\":395},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=278#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Faltering Nations back to Prosperity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Faltering Nations back to Prosperity - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=278","og_locale":"en_US","og_type":"article","og_title":"Empowering Faltering Nations back to Prosperity - Murray Slatter","og_description":"Sierra Leone Ship loading facility The Pepel Transhipment Facility Upgrade and Rebirth project exemplifies innovation, precision, and resilience in delivering industrial infrastructure solutions under extreme constraints. Tasked with retrofitting a long-abandoned transshipment facility in Sierra Leone, Qfactor overcame logistical, structural, [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=278","og_site_name":"Murray Slatter","article_modified_time":"2024-12-24T09:00:13+00:00","og_image":[{"width":777,"height":395,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=278","url":"https:\/\/murrayslatter.me\/?page_id=278","name":"Empowering Faltering Nations back to Prosperity - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=278#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=278#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1","datePublished":"2017-02-26T00:51:12+00:00","dateModified":"2024-12-24T09:00:13+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=278#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=278"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=278#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/pepel.jpg?fit=777%2C395&ssl=1","width":777,"height":395},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=278#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Faltering Nations back to Prosperity"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":6121,"url":"https:\/\/murrayslatter.me\/?page_id=6121","url_meta":{"origin":278,"position":0},"title":"Empowering Care: Aged Care Upgrade","author":"Murray Slatter","date":"May 16, 2026","format":false,"excerpt":"Client: Japara HealthCare Location: South West Rocks, NSW Project Value: ~$2.5 million Project Duration: March 2019 \u2013 May 2019 Project Type: Live Aged Care Facility Upgrade Strategic Objective To upgrade critical aged\u2011care infrastructure in a live operational environment, improving resident safety, staff amenity, and compliance with contemporary Australian standards following\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/05\/Japara-HealthCare.jpg?fit=643%2C288&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":589,"url":"https:\/\/murrayslatter.me\/?page_id=589","url_meta":{"origin":278,"position":1},"title":"RTIO &#8211; Trip Services Facility","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the Locomotive Trip Services and refuelling facility to the Rio Tinto Cape Lambert facility. Works include, construction of Locomotive shed, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, water treatment and tailing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/kar106-small.jpg?fit=778%2C508&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":592,"url":"https:\/\/murrayslatter.me\/?page_id=592","url_meta":{"origin":278,"position":2},"title":"RTIO &#8211; HCO Fuel Farm","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, bund installation, water treatment\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":192,"url":"https:\/\/murrayslatter.me\/?page_id=192","url_meta":{"origin":278,"position":3},"title":"Mestelle Yantia &#8211; Manufacturing Facility","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"Mestelle Yantia is a turnkey supplier of bulk materials handling machines. Mestelle designs its machines in Sydney, Australia and manufactures the machines in Yantai, China. Mestelle operates in Australia and South East Asia. Qfactor was engaged to lead the delivery of the company\u2019s strategic business case, including but not limited\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Mestelle-Yantai-1.jpg?fit=777%2C394&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Mestelle-Yantai-1.jpg?fit=777%2C394&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Mestelle-Yantai-1.jpg?fit=777%2C394&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Mestelle-Yantai-1.jpg?fit=777%2C394&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":243,"url":"https:\/\/murrayslatter.me\/?page_id=243","url_meta":{"origin":278,"position":4},"title":"Empowering the Brightest minds lead the future &#8211; Charles Sturt Uni","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"With a strategic focus of improving the functionality and atmosphere within the ageing HUBCentral, the University engaged Qfactor to project manage the upgrade of the HUBCentral including a complete fitout of the space, and upgrading electrical and mechanical systems. Working with the nominated architect, specialist engineering firms and technology providers\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B.jpg?fit=800%2C531&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":246,"url":"https:\/\/murrayslatter.me\/?page_id=246","url_meta":{"origin":278,"position":5},"title":"Empowering Brighter Smiles &#8211; Charles Sturt Uni &#8211; Dentistry School","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"3 years following the construction of the First class dentistry school, a number of problems were experienced with the electrical and lighting system. Further,\u00a0as the lighting system aged, the lighting colour temperature changed and proved problematic for the dentistry students as lighting and the colour temperature of lighting is key\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=278"}],"version-history":[{"count":4,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/278\/revisions"}],"predecessor-version":[{"id":4778,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/278\/revisions\/4778"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4774"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}