{"id":233,"date":"2017-01-28T10:41:10","date_gmt":"2017-01-28T10:41:10","guid":{"rendered":"http:\/\/www.q3ed.com\/?page_id=233"},"modified":"2026-06-06T16:49:33","modified_gmt":"2026-06-06T06:49:33","slug":"education-energy-efficiency","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=233","title":{"rendered":"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Department of Education &amp; Training (NSW)<br><strong>Location:<\/strong> NSW, Australia<br><strong>Project Type:<\/strong> Energy Efficiency Program \u2013 Live Education Environment<br><strong>Project Duration:<\/strong> 2014<br><strong>Role:<\/strong> Program Leadership, Design Coordination &amp; Delivery  <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <em> <\/em><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the NSW Department of Education and Training\u2019s <strong>Energy Efficiency in Schools Program<\/strong>, Northern Beaches High School was selected for targeted upgrades to reduce energy consumption while maintaining a safe, functional learning environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">School and departmental leaders required an outcome that delivered <strong>measurable energy efficiency improvements<\/strong>\u2014without interrupting teaching, learning, or daily operations. The objective was to design and implement a lighting upgrade that improved performance, reduced energy usage, and aligned with government policy, all within a live school setting.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <em> <\/em><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Delivering energy upgrades in an occupied secondary school required careful balance:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A fully operational campus with <strong>no tolerance for disruption during school hours<\/strong><\/li>\n\n\n\n<li>Multiple stakeholder groups requiring approval and operational confidence<\/li>\n\n\n\n<li>Integration of upgraded lighting with existing electrical and control systems<\/li>\n\n\n\n<li>Strict compliance with safety, evacuation, and education\u2011sector standards<\/li>\n\n\n\n<li>The need for works to be completed <strong>entirely within normal business hours<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The challenge was not just technical\u2014it was operational, social, and governance\u2011driven.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The engagement encompassed program planning, design coordination, and execution oversight, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lighting solution design aligned to the Energy Efficiency in Schools program<\/li>\n\n\n\n<li>Stakeholder and departmental approvals on practical implementation and operational impacts<\/li>\n\n\n\n<li>Development of a detailed execution plan<\/li>\n\n\n\n<li>Development of the overall program plan for client review and approval<\/li>\n\n\n\n<li>Business\u2011hours construction, commissioning, and handover<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">I applied a <strong>stakeholder\u2011centric and execution\u2011disciplined delivery model<\/strong>, designed specifically for live education environments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Integrated Design Coordination:<\/strong> Working with the client\u2011assigned architect, specialist engineering firms, and technology providers to deliver a fit\u2011for\u2011purpose lighting solution<\/li>\n\n\n\n<li><strong>Governance &amp; Approvals:<\/strong> Managing departmental and stakeholder reviews to validate implementation impacts before works commenced<\/li>\n\n\n\n<li><strong>Execution Planning:<\/strong> Development of detailed execution and program plans to sequence works safely and efficiently<\/li>\n\n\n\n<li><strong>Stakeholder Management:<\/strong> Direct engagement with <strong>104 staff members<\/strong>, ensuring clarity, confidence, and operational continuity<\/li>\n\n\n\n<li><strong>Business\u2011Hours Delivery:<\/strong> All works programmed to occur without impacting the function of the school<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The guiding principle was simple: <strong>deliver sustainability outcomes without the school feeling the works<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks addressed included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Disruption to teaching and student movement<\/li>\n\n\n\n<li>Safety management in an occupied school environment<\/li>\n\n\n\n<li>Interface complexity between new lighting systems and existing services<\/li>\n\n\n\n<li>Stakeholder concern regarding operational impacts<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through early engagement, clear communication, disciplined sequencing, and robust safety controls.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A fully implemented energy\u2011efficient lighting upgrade<\/li>\n\n\n\n<li>Approved execution and program plans aligned with Departmental governance<\/li>\n\n\n\n<li>Seamless integration with existing electrical and operational systems<\/li>\n\n\n\n<li>Business\u2011hours construction and commissioning<\/li>\n\n\n\n<li>Full operational handover following system verification<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery &amp; Safety Performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>~4,000 work hours<\/strong><\/li>\n\n\n\n<li><strong>Zero Lost Time Injuries (LTI)<\/strong><\/li>\n\n\n\n<li><strong>Zero First Aid Incidents (FAI)<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This reflects disciplined low\u2011impact delivery in an active education environment.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Achieved improved energy efficiency and reduced operating costs<\/li>\n\n\n\n<li>Maintained uninterrupted teaching and learning throughout delivery<\/li>\n\n\n\n<li>Delivered full compliance with departmental and safety requirements<\/li>\n\n\n\n<li>Improved lighting quality and reliability across the campus<\/li>\n\n\n\n<li>Achieved strong acceptance across school and departmental stakeholders<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Northern Beaches High School gained a more efficient, future\u2011ready learning environment\u2014without operational compromise.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Delivery Team &amp; Stakeholder Ecosystem<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Design &amp; Advisory<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Client\u2011assigned architectural consultancy<\/li>\n\n\n\n<li>Specialist technology consultancies<\/li>\n\n\n\n<li>Engineering (Mechanical &amp; Electrical \/ Instrumentation)<\/li>\n\n\n\n<li>IT consultancy<\/li>\n\n\n\n<li>Network &amp; Network Security consultants<\/li>\n\n\n\n<li>Interior designer<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Construction &amp; Implementation<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 \u00d7 Project Manager<\/li>\n\n\n\n<li>1 \u00d7 Construction Manager<\/li>\n\n\n\n<li>Demolition contractor<\/li>\n\n\n\n<li>Fit\u2011out contractor<\/li>\n\n\n\n<li>5 \u00d7 Functional contractors (including IT and network specialists)<\/li>\n\n\n\n<li>Evacuation systems suppliers<\/li>\n\n\n\n<li>Compliance service contractors<\/li>\n\n\n\n<li>Electrical contractor<\/li>\n\n\n\n<li>1 \u00d7 Quality Manager<\/li>\n\n\n\n<li>Commissioning team<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Live\u2011School Delivery Expertise:<\/strong> Proven ability to work within active education environments<\/li>\n\n\n\n<li><strong>Stakeholder Density Management:<\/strong> 104 staff engaged and aligned<\/li>\n\n\n\n<li><strong>Governance Discipline:<\/strong> Clear approvals and Department\u2011grade compliance<\/li>\n\n\n\n<li><strong>Zero\u2011Disruption Execution:<\/strong> Business\u2011hours delivery with no operational impact<\/li>\n\n\n\n<li><strong>Sustainability with Practicality:<\/strong> Energy efficiency achieved without affecting usability<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=233\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client: Department of Education &amp; Training (NSW)Location: NSW, AustraliaProject Type: Energy Efficiency Program \u2013 Live Education EnvironmentProject Duration: 2014Role: Program Leadership, Design Coordination &amp; Delivery Strategic Objective As part of the NSW Department of Education and Training\u2019s Energy Efficiency in [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4746,"parent":0,"menu_order":14,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-233","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=233\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"Client: Department of Education &amp; Training (NSW)Location: NSW, AustraliaProject Type: Energy Efficiency Program \u2013 Live Education EnvironmentProject Duration: 2014Role: Program Leadership, Design Coordination &amp; Delivery Strategic Objective As part of the NSW Department of Education and Training\u2019s Energy Efficiency in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=233\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T06:49:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif\" \/>\n\t<meta property=\"og:image:width\" content=\"777\" \/>\n\t<meta property=\"og:image:height\" content=\"395\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/gif\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233\",\"name\":\"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/NBHS-Copy.gif?fit=777%2C395&ssl=1\",\"datePublished\":\"2017-01-28T10:41:10+00:00\",\"dateModified\":\"2026-06-06T06:49:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/NBHS-Copy.gif?fit=777%2C395&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/NBHS-Copy.gif?fit=777%2C395&ssl=1\",\"width\":777,\"height\":395},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=233#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=233","og_locale":"en_US","og_type":"article","og_title":"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade - Murray Slatter","og_description":"Client: Department of Education &amp; Training (NSW)Location: NSW, AustraliaProject Type: Energy Efficiency Program \u2013 Live Education EnvironmentProject Duration: 2014Role: Program Leadership, Design Coordination &amp; Delivery Strategic Objective As part of the NSW Department of Education and Training\u2019s Energy Efficiency in [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=233","og_site_name":"Murray Slatter","article_modified_time":"2026-06-06T06:49:33+00:00","og_image":[{"width":777,"height":395,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif","type":"image\/gif"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=233","url":"https:\/\/murrayslatter.me\/?page_id=233","name":"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=233#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=233#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1","datePublished":"2017-01-28T10:41:10+00:00","dateModified":"2026-06-06T06:49:33+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=233#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=233"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=233#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1","width":777,"height":395},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=233#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":1264,"url":"https:\/\/murrayslatter.me\/?page_id=1264","url_meta":{"origin":233,"position":0},"title":"Dept of Education and Communities NSW","author":"Murray Slatter","date":"March 8, 2020","format":false,"excerpt":"The NSW Schools Energy Program, delivered for the NSW Department of Education (formerly Department of Education and Communities), aimed to revolutionize energy efficiency across some of the state\u2019s most energy-intensive public schools. Our work focused on implementing sustainable infrastructure upgrades, including solar systems, LED lighting, advanced HVAC solutions, and cutting-edge\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DEC.png?fit=900%2C291&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DEC.png?fit=900%2C291&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DEC.png?fit=900%2C291&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/DEC.png?fit=900%2C291&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":285,"url":"https:\/\/murrayslatter.me\/?page_id=285","url_meta":{"origin":233,"position":1},"title":"Empowering the NSW Schools Energy Program","author":"Murray Slatter","date":"February 26, 2017","format":false,"excerpt":"Client: School Infrastructure NSWLocation: New South Wales (15 public school campuses)Project Type: Energy Efficiency & Sustainability Program \u2013 Public InfrastructureProject Value: AUD $24 millionProject Duration: 2015Role: Program Leadership & Delivery Strategic Objective The NSW Government initiated the NSW Schools Energy Program to reduce energy consumption, improve sustainability outcomes, and lower\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6319,"url":"https:\/\/murrayslatter.me\/?page_id=6319","url_meta":{"origin":233,"position":2},"title":"Lakes Evangelical Church Ministry Centre","author":"Murray Slatter","date":"June 23, 2026","format":false,"excerpt":"Project Overview Client: Lakes Evangelical Church (LakesEv) Location: Tuggerah, NSW Project Type: Community \/ Institutional \u2013 Greenfield Development Contract Type: Construct Only Project Value: AUD 5M Duration: 8 months Sector: Community \/ Religious Facility Strategic Objective The project was undertaken to enable Lakes Evangelical Church to transition from a temporary\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/LakesEv.jpg?fit=642%2C309&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/LakesEv.jpg?fit=642%2C309&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/06\/LakesEv.jpg?fit=642%2C309&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4982,"url":"https:\/\/murrayslatter.me\/?page_id=4982","url_meta":{"origin":233,"position":3},"title":"Consular Generals Home Vaucluse Renovation","author":"Murray Slatter","date":"January 8, 2025","format":false,"excerpt":"British High Commission (Consular), Sydney \u2013 Vaucluse Residence Renovation Client: British Government \u2013 Foreign & Commonwealth Office (High Commission)Location: Vaucluse, Sydney, NSWProject Type: Capital Project \u2013 REIT \u2013 Heritage Renovation (Residential \/ Diplomatic Asset)Project Value: USD\u00a0$1.97\u00a0millionProject Duration: 2015Role: Program Leadership & Delivery (Head Contractor \/ Client\u2011Side Program Director) Strategic Objective\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2025\/01\/BHC-Sydney.png?fit=716%2C444&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":921,"url":"https:\/\/murrayslatter.me\/?page_id=921","url_meta":{"origin":233,"position":4},"title":"EMPOWERING GREAT EDUCATION OUTCOMES","author":"Murray Slatter","date":"January 6, 2019","format":false,"excerpt":"For more than 30 years I have delivered exceptional outcomes to the Education Sector across all three services offerings. My expertise in the Education sector is second to none, as we harness the power of effective collaboration and understanding the OUTCOME Paradigm and how Educational outcomes are empowered by our\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":237,"url":"https:\/\/murrayslatter.me\/?page_id=237","url_meta":{"origin":233,"position":5},"title":"Empowering the Minds of the Future &#8211; Charles Sturt Uni","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"With a strategic Focus on reducing their carbon foot print, Charles Sturt Uni's Engineering team undertook an Energy Efficiency Charles Sturt University \u2013 Energy Efficiency & Lighting Upgrade Program Client: Charles Sturt UniversityLocation: New South Wales, AustraliaProject Type: Energy Efficiency Program | Operational Facility UpgradeProject Duration:[Program Year]Role: Program Leadership &\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/csu1731.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=233"}],"version-history":[{"count":3,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/233\/revisions"}],"predecessor-version":[{"id":6223,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/233\/revisions\/6223"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4746"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}