{"id":225,"date":"2017-01-27T14:02:24","date_gmt":"2017-01-27T14:02:24","guid":{"rendered":"http:\/\/www.q3ed.com\/?page_id=225"},"modified":"2026-06-06T16:45:45","modified_gmt":"2026-06-06T06:45:45","slug":"education-sector-projects-st-andrews-cathedral-school","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=225","title":{"rendered":"Empowering Students at St Andrews Cathedral School"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">St Andrews School \u2013 Integrated Security, Access Control &amp; BMS Upgrade<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> St Andrews School<br><strong>Location:<\/strong> New South Wales, Australia<br><strong>Project Type:<\/strong> Security Systems Integration | Access Control, CCTV &amp; BMS<br><strong>Project Value:<\/strong> AUD $2.5 million<br><strong>Project Duration:<\/strong> 2008<br><strong>Role:<\/strong> Program Leadership &amp; Delivery<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Objective <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">St Andrews School leadership required a step\u2011change in campus safety following multiple security breaches during school hours. The priority was clear: <strong>protect students and staff while maintaining a welcoming, functional learning environment<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective was to design and deliver an <strong>integrated security ecosystem<\/strong>\u2014combining access control, CCTV, and Building Management Systems (BMS)\u2014to support a clear <strong>prevention, detection, and response<\/strong> model, with centralised visibility and control.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge \/ Need <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The school faced a set of high\u2011consequence challenges:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Repeated security breaches during active school hours<\/li>\n\n\n\n<li>Fragmented or insufficient access control and surveillance systems<\/li>\n\n\n\n<li>No centralised command capability to monitor, assess, and respond to incidents<\/li>\n\n\n\n<li>A live school environment with zero tolerance for disruption to learning<\/li>\n\n\n\n<li>The need to balance <strong>strong security<\/strong> with <strong>appropriate public access and usability<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Any solution needed to be technically robust, operationally intuitive, and culturally appropriate for a school setting.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project encompassed full design, integration, and delivery of a campus\u2011wide security solution, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Access control systems across critical entry points<\/li>\n\n\n\n<li>CCTV surveillance integrated into a central control environment<\/li>\n\n\n\n<li>Building Management System (BMS) integration<\/li>\n\n\n\n<li>Design and construction of a centralised security control centre<\/li>\n\n\n\n<li>Public\u2011area upgrades to support safer access and movement<\/li>\n\n\n\n<li>Stakeholder engagement, approvals, and operational handover<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Our Approach <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>systems\u2011led, stakeholder\u2011sensitive delivery model<\/strong> was applied, recognising that security in schools is as much about behaviour and usability as technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key elements included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Integrated Design Collaboration:<\/strong> Working closely with the nominated architect, technology providers, and school maintenance teams to ensure seamless design and execution<\/li>\n\n\n\n<li><strong>Governance &amp; Approvals:<\/strong> Structured departmental reviews and stakeholder sign\u2011off on operational and ergonomic impacts<\/li>\n\n\n\n<li><strong>Phased Execution Planning:<\/strong> Development of a program plan that allowed works to proceed with minimal disruption<\/li>\n\n\n\n<li><strong>Operational Focus:<\/strong> Designing systems that supported staff decision\u2011making and rapid response\u2014not just monitoring<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The intent was to deliver <strong>confidence and control<\/strong>, not complexity.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Risks and Challenges <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Key risks managed included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Disruption to teaching and student movement during installation<\/li>\n\n\n\n<li>Integration risk across multiple systems (CCTV, access control, BMS)<\/li>\n\n\n\n<li>Ensuring the central control centre balanced ergonomic efficiency with situational awareness<\/li>\n\n\n\n<li>Achieving stakeholder acceptance in a sensitive school environment<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks were mitigated through early engagement, clear communication, and disciplined system integration.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Solution &amp; Key Deliverables<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>60 access\u2011controlled doors<\/strong> across the campus<\/li>\n\n\n\n<li>Renovated public access areas to improve safety and flow<\/li>\n\n\n\n<li>Design, construction, and fit\u2011out of a <strong>centralised security control centre<\/strong><\/li>\n\n\n\n<li>Fully integrated CCTV, access control, and BMS systems<\/li>\n\n\n\n<li>End\u2011to\u2011end stakeholder communication and operational integration<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The system was designed to support real\u2011time awareness and coordinated response across the school.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project achieved:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A fully integrated, campus\u2011wide security and access control system<\/li>\n\n\n\n<li>Enhanced situational awareness through centralised CCTV monitoring<\/li>\n\n\n\n<li>Faster, more coordinated response to security events<\/li>\n\n\n\n<li>Reduced risk of unauthorised access during school hours<\/li>\n\n\n\n<li>Improved confidence among staff, students, and leadership<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">St Andrews School gained a <strong>safer, more resilient campus environment<\/strong>\u2014without compromising daily operations or community atmosphere.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Value\u2011Added Differentiator <\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Education\u2011Environment Expertise:<\/strong> Security solutions tailored for live school operations<\/li>\n\n\n\n<li><strong>Systems Integration Strength:<\/strong> Seamless alignment of CCTV, access control, and BMS<\/li>\n\n\n\n<li><strong>Prevention\u2013Detection\u2013Response Thinking:<\/strong> Security designed as an operational system, not isolated components<\/li>\n\n\n\n<li><strong>Stakeholder Alignment:<\/strong> Effective collaboration with architects, contractors, and school leadership<\/li>\n\n\n\n<li><strong>Operational Clarity:<\/strong> Centralised control enabling confident, timely decision\u2011making<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-jetpack-contact-form is-vertical is-content-justification-left is-nowrap is-layout-flex wp-container-jetpack-contact-form-is-layout-ed9bf105 wp-block-jetpack-contact-form-is-layout-flex\"><a href=\"https:\/\/murrayslatter.me\/?page_id=225\" target=\"_blank\" rel=\"noopener noreferrer\">Submit a form.<\/a><\/div>\n\n\n<p class=\"wp-block-paragraph\">For more visit our affiliate <a href=\"http:\/\/www.qfactor.com.au\">Qfactor Performance Consulting<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>St Andrews School \u2013 Integrated Security, Access Control &amp; BMS Upgrade Client: St Andrews SchoolLocation: New South Wales, AustraliaProject Type: Security Systems Integration | Access Control, CCTV &amp; BMSProject Value: AUD $2.5 millionProject Duration: 2008Role: Program Leadership &amp; Delivery Strategic [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4757,"parent":0,"menu_order":11,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-225","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Empowering Students at St Andrews Cathedral School - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=225\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Empowering Students at St Andrews Cathedral School - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"St Andrews School \u2013 Integrated Security, Access Control &amp; BMS Upgrade Client: St Andrews SchoolLocation: New South Wales, AustraliaProject Type: Security Systems Integration | Access Control, CCTV &amp; BMSProject Value: AUD $2.5 millionProject Duration: 2008Role: Program Leadership &amp; Delivery Strategic [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=225\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T06:45:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/St-Andrews.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225\",\"name\":\"Empowering Students at St Andrews Cathedral School - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/St-Andrews.jpg?fit=1920%2C1080&ssl=1\",\"datePublished\":\"2017-01-27T14:02:24+00:00\",\"dateModified\":\"2026-06-06T06:45:45+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/St-Andrews.jpg?fit=1920%2C1080&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/murrayslatter.me\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/St-Andrews.jpg?fit=1920%2C1080&ssl=1\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=225#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Empowering Students at St Andrews Cathedral School\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Empowering Students at St Andrews Cathedral School - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=225","og_locale":"en_US","og_type":"article","og_title":"Empowering Students at St Andrews Cathedral School - Murray Slatter","og_description":"St Andrews School \u2013 Integrated Security, Access Control &amp; BMS Upgrade Client: St Andrews SchoolLocation: New South Wales, AustraliaProject Type: Security Systems Integration | Access Control, CCTV &amp; BMSProject Value: AUD $2.5 millionProject Duration: 2008Role: Program Leadership &amp; Delivery Strategic [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=225","og_site_name":"Murray Slatter","article_modified_time":"2026-06-06T06:45:45+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/St-Andrews.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=225","url":"https:\/\/murrayslatter.me\/?page_id=225","name":"Empowering Students at St Andrews Cathedral School - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=225#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=225#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/St-Andrews.jpg?fit=1920%2C1080&ssl=1","datePublished":"2017-01-27T14:02:24+00:00","dateModified":"2026-06-06T06:45:45+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=225#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=225"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=225#primaryimage","url":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/St-Andrews.jpg?fit=1920%2C1080&ssl=1","contentUrl":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/St-Andrews.jpg?fit=1920%2C1080&ssl=1","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=225#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Empowering Students at St Andrews Cathedral School"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":285,"url":"https:\/\/murrayslatter.me\/?page_id=285","url_meta":{"origin":225,"position":0},"title":"Empowering the NSW Schools Energy Program","author":"Murray Slatter","date":"February 26, 2017","format":false,"excerpt":"Client: School Infrastructure NSWLocation: New South Wales (15 public school campuses)Project Type: Energy Efficiency & Sustainability Program \u2013 Public InfrastructureProject Value: AUD $24 millionProject Duration: 2015Role: Program Leadership & Delivery Strategic Objective The NSW Government initiated the NSW Schools Energy Program to reduce energy consumption, improve sustainability outcomes, and lower\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Sydney-Region.jpg?fit=999%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":246,"url":"https:\/\/murrayslatter.me\/?page_id=246","url_meta":{"origin":225,"position":1},"title":"Empowering Brighter Smiles &#8211; Charles Sturt Uni &#8211; Dentistry School","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"Client: Charles Sturt UniversityLocation: NSW, AustraliaProject Type: Clinical Facility Upgrade | Electrical & Lighting Systems RemediationProject Value: $15.7mProject Duration: 2014Role: Program Leadership, Design Coordination & Delivery Strategic Objective Following the construction of a first\u2011class dentistry school, Charles Sturt University identified growing issues with the electrical and lighting systems that were\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CSU-B-DTS.jpg?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":233,"url":"https:\/\/murrayslatter.me\/?page_id=233","url_meta":{"origin":225,"position":2},"title":"Northern Beaches High School \u2013 Energy Efficiency &amp; Lighting Upgrade","author":"Murray Slatter","date":"January 28, 2017","format":false,"excerpt":"Client: Department of Education & Training (NSW)Location: NSW, AustraliaProject Type: Energy Efficiency Program \u2013 Live Education EnvironmentProject Duration: 2014Role: Program Leadership, Design Coordination & Delivery Strategic Objective As part of the NSW Department of Education and Training\u2019s Energy Efficiency in Schools Program, Northern Beaches High School was selected for targeted\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/NBHS-Copy.gif?fit=777%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6341,"url":"https:\/\/murrayslatter.me\/?page_id=6341","url_meta":{"origin":225,"position":3},"title":"Empowering Education : Energy Efficiency Program (Schools Upgrade Initiative)","author":"Murray Slatter","date":"July 9, 2026","format":false,"excerpt":"Program Overview Category: Energy Efficiency \/ Infrastructure Upgrade Client: NSW Department of Education Project Name: Statewide School Energy Efficiency Upgrade Program Location: New South Wales, Australia Project Type: Capital Works Delivery, Energy Efficiency Project Duration: 2013 Project Value: ~$50m total program value (~$2m per school) Strategic Objective To significantly reduce\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/07\/Tempe-School.png?fit=1200%2C636&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/07\/Tempe-School.png?fit=1200%2C636&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/07\/Tempe-School.png?fit=1200%2C636&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/07\/Tempe-School.png?fit=1200%2C636&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2026\/07\/Tempe-School.png?fit=1200%2C636&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":921,"url":"https:\/\/murrayslatter.me\/?page_id=921","url_meta":{"origin":225,"position":4},"title":"EMPOWERING GREAT EDUCATION OUTCOMES","author":"Murray Slatter","date":"January 6, 2019","format":false,"excerpt":"For more than 30 years I have delivered exceptional outcomes to the Education Sector across all three services offerings. My expertise in the Education sector is second to none, as we harness the power of effective collaboration and understanding the OUTCOME Paradigm and how Educational outcomes are empowered by our\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Education-Sector.jpg?fit=960%2C720&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":222,"url":"https:\/\/murrayslatter.me\/?page_id=222","url_meta":{"origin":225,"position":5},"title":"Sydney Opera House \u2013 Security, CCTV &amp; Building Management Systems Upgrade","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"Client: Sydney Opera HouseLocation: Sydney, New South WalesProject Type: Capital Project \u2013 Security, CCTV & Building Management Systems IntegrationProject Value: AUD $12 millionProject Duration: 2002 \u2013 2003Role: Program Leadership & Delivery (Development & Execution Lead) Strategic Objective In the wake of heightened global security risks following 9\/11 and large\u2011scale Iraq\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/soh.jpeg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=225"}],"version-history":[{"count":2,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/225\/revisions"}],"predecessor-version":[{"id":6222,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/225\/revisions\/6222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/media\/4757"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}