{"id":195,"date":"2017-01-27T11:34:38","date_gmt":"2017-01-27T11:34:38","guid":{"rendered":"http:\/\/www.q3ed.com\/?page_id=195"},"modified":"2024-12-24T22:02:32","modified_gmt":"2024-12-24T11:02:32","slug":"rio-tinto-fuel-management-systems","status":"publish","type":"page","link":"https:\/\/murrayslatter.me\/?page_id=195","title":{"rendered":"Rio Tinto &#8211; Fuel Management Systems"},"content":{"rendered":"<p>RTIO engaged our client to implement a Fuel management system to 176 locations throughout 16 sites in the RTIO suite of properties from Port Hedland to East and West sites. The Fuel management system was designed to capture every drop of the 2 billion litres of diesel that RTIO uses every year. Installed on 103 dispensing systems and 73 tanks and mobile units the system captures data on the points of ingress and dispense to monitor the use and security of the fuel.<\/p>\n<h3>TEAM<\/h3>\n<p><strong>Design<\/strong> for the design project the team consisted of:<\/p>\n<ul>\n<li>1 x Lead designer<\/li>\n<li>3 x Engineers, 5 x Drafters<\/li>\n<li>3 x PLC\/SCADA designers<\/li>\n<li>1 x PM<\/li>\n<\/ul>\n<p><strong>SMP Construction <\/strong>for the Construction project the team will consist of:<\/p>\n<ul>\n<li>1 x Project Manager<\/li>\n<li>1 x Construction Engineer<\/li>\n<li>2 x Fabrication contractors<\/li>\n<li>1 x Erection contractor<\/li>\n<li>3 x functional contractors<\/li>\n<li>1 x Electrical contractor<\/li>\n<li>1 x Project Manager<\/li>\n<li>1 x Quality Manager<\/li>\n<li>1 x Construction Manager<\/li>\n<li>1 x Safety Manager<\/li>\n<\/ul>\n<p>Project was completed with 91,000 hrs with ZERO LTI and 2 x FAI.<\/p>\n<h3>Responsibilities<\/h3>\n<ul>\n<li>Engineering and Project Management of: the design and implementation of the systems including data capture, front end and back end database engineering<\/li>\n<li>Engineering Level decisions for Electrical Supply, Distribution, Instrumentation.<\/li>\n<li>Management of the Project\/Program Office, further redevelopment of the Project Management system in application, execution conformance\/monitoring.<\/li>\n<li>Engineering design process review and execution conformance\/monitoring<\/li>\n<li>Board level client control<\/li>\n<li>Responsible for all aspects of Engineering design, Construction at site, Risk, Legal, Finance, SHRM, Quality.<\/li>\n<li>Leading the Procurement control process, Contractor evaluations, and Contractor Contract negotiations.<\/li>\n<\/ul>\n<p>Safety system development and execution conformance<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RTIO engaged our client to implement a Fuel management system to 176 locations throughout 16 sites in the RTIO suite of properties from Port Hedland to East and West sites. The Fuel management system was designed to capture every drop [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":196,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/single-project.php","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-195","page","type-page","status-publish","has-post-thumbnail","hentry","clearfix"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rio Tinto - Fuel Management Systems - Murray Slatter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murrayslatter.me\/?page_id=195\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rio Tinto - Fuel Management Systems - Murray Slatter\" \/>\n<meta property=\"og:description\" content=\"RTIO engaged our client to implement a Fuel management system to 176 locations throughout 16 sites in the RTIO suite of properties from Port Hedland to East and West sites. The Fuel management system was designed to capture every drop [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murrayslatter.me\/?page_id=195\" \/>\n<meta property=\"og:site_name\" content=\"Murray Slatter\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-24T11:02:32+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195\",\"name\":\"Rio Tinto - Fuel Management Systems - Murray Slatter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195#primaryimage\"},\"thumbnailUrl\":\"\",\"datePublished\":\"2017-01-27T11:34:38+00:00\",\"dateModified\":\"2024-12-24T11:02:32+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195#primaryimage\",\"url\":\"\",\"contentUrl\":\"\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/?page_id=195#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/murrayslatter.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rio Tinto &#8211; Fuel Management Systems\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/murrayslatter.me\\\/#website\",\"url\":\"https:\\\/\\\/murrayslatter.me\\\/\",\"name\":\"Murray Slatter\",\"description\":\"Empowering Good teams to be Great!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/murrayslatter.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rio Tinto - Fuel Management Systems - Murray Slatter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murrayslatter.me\/?page_id=195","og_locale":"en_US","og_type":"article","og_title":"Rio Tinto - Fuel Management Systems - Murray Slatter","og_description":"RTIO engaged our client to implement a Fuel management system to 176 locations throughout 16 sites in the RTIO suite of properties from Port Hedland to East and West sites. The Fuel management system was designed to capture every drop [&hellip;]","og_url":"https:\/\/murrayslatter.me\/?page_id=195","og_site_name":"Murray Slatter","article_modified_time":"2024-12-24T11:02:32+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/murrayslatter.me\/?page_id=195","url":"https:\/\/murrayslatter.me\/?page_id=195","name":"Rio Tinto - Fuel Management Systems - Murray Slatter","isPartOf":{"@id":"https:\/\/murrayslatter.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murrayslatter.me\/?page_id=195#primaryimage"},"image":{"@id":"https:\/\/murrayslatter.me\/?page_id=195#primaryimage"},"thumbnailUrl":"","datePublished":"2017-01-27T11:34:38+00:00","dateModified":"2024-12-24T11:02:32+00:00","breadcrumb":{"@id":"https:\/\/murrayslatter.me\/?page_id=195#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murrayslatter.me\/?page_id=195"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/murrayslatter.me\/?page_id=195#primaryimage","url":"","contentUrl":""},{"@type":"BreadcrumbList","@id":"https:\/\/murrayslatter.me\/?page_id=195#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/murrayslatter.me\/"},{"@type":"ListItem","position":2,"name":"Rio Tinto &#8211; Fuel Management Systems"}]},{"@type":"WebSite","@id":"https:\/\/murrayslatter.me\/#website","url":"https:\/\/murrayslatter.me\/","name":"Murray Slatter","description":"Empowering Good teams to be Great!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murrayslatter.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"}]}},"jetpack-related-posts":[{"id":592,"url":"https:\/\/murrayslatter.me\/?page_id=592","url_meta":{"origin":195,"position":0},"title":"RTIO &#8211; HCO Fuel Farm","author":"Murray Slatter","date":"July 10, 2018","format":false,"excerpt":"RTIO engaged our team to Project Manager, Design, Install, Test and Commission\u00a0the the HCO Fuel Farm facility to the Rio Tinto Cape Lambert facility. Works include, construction of the entire fuel farm, installation of 8 Diesel fuel tanks, MEP pipe reticulation, pipe bridge, oily water separator, bund installation, water treatment\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/CLTSF3.png?fit=1098%2C538&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4647,"url":"https:\/\/murrayslatter.me\/?page_id=4647","url_meta":{"origin":195,"position":1},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and Monitoring Project NameBHP Jimblebar Mine Site Fuel System Upgrades \u2013 Control and MonitoringClient CompanyBHPIO (BHP Iron Ore)Project TypeCapital Project \u2013 Industrial ProcessProject Value$6,602,025Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo upgrade and optimize the fuel system infrastructure at Jimblebar Mine Site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/BHPIO-Ref.jpeg?fit=960%2C560&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4649,"url":"https:\/\/murrayslatter.me\/?page_id=4649","url_meta":{"origin":195,"position":2},"title":"Empowering Tax Regulation Compliance  BMA2","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Daunia 500,000L Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$1,537,332Project Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission a state-of-the-art 500,000-litre fuel farm infrastructure, ensuring\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/daunia-coal-mine.jpg?fit=1200%2C256&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4652,"url":"https:\/\/murrayslatter.me\/?page_id=4652","url_meta":{"origin":195,"position":3},"title":"Empowering Tax Regulation Compliance BMA","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"BMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and Monitoring Project NameBMA Goonyella Riverside Mine Fuel Farm Installations \u2013 Upgrades, Control, and MonitoringClient CompanyBMA (BHP Mitsubishi Alliance)Project TypeCapital Project \u2013 Industrial ProcessProject Value$3,3m Project Start and Finish2013 \u2013 2013Strategic ObjectiveTo design, install, and commission an upgraded fuel storage,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Gunyella-Riverside.png?fit=1200%2C467&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4648,"url":"https:\/\/murrayslatter.me\/?page_id=4648","url_meta":{"origin":195,"position":4},"title":"Empowering Tax Regulation Compliance BHPIO","author":"Murray Slatter","date":"December 24, 2024","format":false,"excerpt":"Orebody24 Light Vehicles & Heavy Vehicles Fuel Systems Installations Project NameOrebody24 Light Vehicles & Heavy Vehicles Fuel Systems InstallationsClient CompanyBHPIOProject TypeCapital Project \u2013 Industrial ProcessProject Value$3,7mProject Start and Finish2014 \u2013 2014Strategic ObjectiveTo design, install, and commission advanced fuel systems for both light and heavy vehicles at the Orebody24 mine site,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/FluidBMA.jpg?fit=1000%2C706&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":199,"url":"https:\/\/murrayslatter.me\/?page_id=199","url_meta":{"origin":195,"position":5},"title":"Empowering a Clearer Environment &#8211; Ambrosia Gold","author":"Murray Slatter","date":"January 27, 2017","format":false,"excerpt":"The development of a Gold ore processing plant was undertaken by Ambrosia Gold in South Africa. A critical factor in the daily operation for the preparation plant was the integration of a materials processing and Handling System to process and refine the material. As the original operation, closed in 1906\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/murrayslatter.me\/wp-content\/uploads\/2024\/12\/Budwa.jpg?fit=339%2C214&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=195"}],"version-history":[{"count":1,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/195\/revisions"}],"predecessor-version":[{"id":4783,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/wp\/v2\/pages\/195\/revisions\/4783"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/murrayslatter.me\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/murrayslatter.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}